DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Kirckoff, How to solve using kcl and kvl

How to solve using kcl and kvl

Design an integrator, Q. An integrator as shown in Figure is to be designed...

Q. An integrator as shown in Figure is to be designed to solve dy(t) / dt + 2000y (t) = 0 with y(0) = 5. If R i is chosen to be 10 k, find C f .

Determine the magnetic flux, Determine the magnetic flux: A coil is wo...

Determine the magnetic flux: A coil is wound uniformly with 300 turns over a steel ring of relative permeability 900, with a mean circumference of 40mm and cross-sectional are

What is frequency translation and product modulation, Q. What is Frequency ...

Q. What is Frequency Translation and Product Modulation? The basic operation needed to build modulators is the multiplication of two signals. Whenever sinusoids are multiplied,

Define time-shifting precedes time-reversing and vice versa, Define Time-Sh...

Define Time-Shifting Precedes Time-Reversing and Vice Versa Signal x[n] is time-shifted by m samples (delay in time) giving x[n - m]. This signal is then reversed at n = 0 givi

Find the maximum radiation intensity, Q. An antenna has beam widths of 3° a...

Q. An antenna has beam widths of 3° and 10° in orthogonal planes and has a radiation ef?ciency factor of 0.6. Find the maximum radiation inten- sity if 1 kW is applied to the anten

Power angle and performance characteristics, Q. Power Angle and Performance...

Q. Power Angle and Performance Characteristics? The real and reactive power delivered by a synchronous generator, or received by a synchronous motor, can be expressed in terms

Banking system , banking system is the collection of financial entities, in...

banking system is the collection of financial entities, infrastructure and practices which support financial transactions . system tech is a software system to handle their transa

Conditional call instruction, Conditional Call Instruction Similar  to ...

Conditional Call Instruction Similar  to conditional  jump  instructions there are conditional call  instructions  also based on various  flags.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd