DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

States the superposition theorem, The superposition theorem states: 'In...

The superposition theorem states: 'In any network made up of linear resistances and having more than single source of e.m.f, the resultant current flowing in any branch is the

Construction and working of analog type storage oscilloscope, Q.   Describe...

Q.   Describe in detail the construction and working of analog type storage oscilloscope. Explain the principle of secondary emission. Analog Storage Oscilloscopes: Storage o

Explain the properties of high resistive materials, Explain the properties ...

Explain the properties of high resistivity materials. High resistivity materials: The conducting materials containing resistivity from 10 -6 to 10 -3 ohm-m come under such

Semiconductors, Charge density In a semiconductor

Charge density In a semiconductor

Circuits I homework, This problem is with circuits. It is basic circuit pro...

This problem is with circuits. It is basic circuit problem. I need a very detailed step by step on how we arrived at the solutions. Only respond if you are 100% sure on your answer

Demodulation of ssb signals, Demodulation of SSB signals also requires the ...

Demodulation of SSB signals also requires the use of a phase-coherent reference. Figure shows the general configuration to demodulate the SSBsignal.Asmall carrier component, which

Operation performed by instruction out 47 h, Q. Illustrate the operation p...

Q. Illustrate the operation performed by instruction OUT 47 h, AL. Ans:  It transfers contents of AL to I/O port 47h. Notice that I/O port number appears as 0047h on the 16 b

Microcontroller - introduction to microprocessors , Microcontroller Mic...

Microcontroller Microcontroller  is also known  as computer  on a chip  this  includes basic  features of microprocessor (ALU Registers  and control circuits ) with  1 k to 2k

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd