DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Explain about common control, Q. Explain about Common Control? Common C...

Q. Explain about Common Control? Common Control: Those systems in which the control subsystem is outside the switching network are known as common control switching system. Str

Explain the meaning of amplitude modulation, a. Explain the meaning of ampl...

a. Explain the meaning of amplitude modulation? Show that the AM output having two sidebands and the carrier frequency. b. Illustrate that the equivalent parallel impedance of a

Find the core radius necessary for a single mode operation, Find the core r...

Find the core radius necessary for a single mode operation at 1320nm of a step index fibre with n 1 =1.48 and n 2 =1.478. What are the N.A and maximum acceptance angle for this fib

Determine the maximum length, Q. If the line of Problem 15.1.3 is made of c...

Q. If the line of Problem 15.1.3 is made of copper whose resistivity ρ = 1.72×10 -8 ·m, determine the maximum length that can be used if losses are not to exceed 3 dB when f = 3

Input voltage to system and the output motor speed, A system contains an am...

A system contains an amplifier with a gain of 10 offering the armature voltage for a motor which provides an output speed which is proportional to the armature voltage, the constan

Ac circuits, AC Circuit: This topic explain the basic concepts of sing...

AC Circuit: This topic explain the basic concepts of single and three-phase ac system. Unit provides the thorough analysis and derivations as required by topics. Here we find

Show binary to octal conversion, Q. Show Binary to Octal Conversion? It...

Q. Show Binary to Octal Conversion? It is simple to convert from an integer binary number to octal. This is accomplished by: Break the binary number into 3-bit secti

Slip-power controlled wound-rotor induction-motor drives, Q. Slip-power con...

Q. Slip-power controlled wound-rotor induction-motor drives? Slip power is that portion of the air-gap power that is not converted into mechanical power. The methods involving

Basic requirement of semiconductor laser, What is basic requirement of semi...

What is basic requirement of semiconductor laser? Draw its label diagram and explain its working with necessary theory. Write down the applications of semiconductor laser.

Forecast the retail price of industrial electricity, Your assignment is to ...

Your assignment is to write a one page paper answering the question posed below. One page is the absolute limit. (You must attach a technical appendix showing computer output for

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd