Dpr preparation, Electrical Engineering

Assignment Help:

DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Surge current - thyristor, Surge Current It is  the maximum admissib...

Surge Current It is  the maximum admissible peak value of  a sinusoidal half  cycle of 10 ms duration at a frequency of 50Hz. The  value is specified at a given junction tem

What do you mean by exponent, Q. What do you mean by Exponent? The expo...

Q. What do you mean by Exponent? The exponent field needs to represent both negative and positive exponents. To perform this, a bias is added to the actual exponent in order

Khalid, hello, I do have some exams or test samples which are related to co...

hello, I do have some exams or test samples which are related to control and procces engineering. Can you have them solved with ilestrastion of all solving steps

Briefly explain single mode and multimode fibres, Briefly explain single mo...

Briefly explain single mode and multimode fibres The optical fibres were categorized within two according to the number of modes it passes as: • Single mode fibres • Multi mode

Flow Chart and Cause-Effect Diagram, Flow Chart and Cause-Effect Diagram ...

Flow Chart and Cause-Effect Diagram Flow Charts Flow charts are pictorial representations of a procedure. By breaking the procedure down within its constituent steps, f

Illumination, Ask question #Minimum 100A light assembly shop, 15 m long, 9 ...

Ask question #Minimum 100A light assembly shop, 15 m long, 9 m wide and 3 m up to trusses is to illuminated to a level of 200 lux. The utilization and maintenance factors are resp

Digital circuits, Digital circuits In analog  circuits,  we think  som...

Digital circuits In analog  circuits,  we think  something about  voltages on terminals ranging over natural values.  This provides us the freedom to make an enormous variety

Customer service management, Customer Service Management CRM involves ...

Customer Service Management CRM involves several activities related to planning - both long terms and short terms, measurement and control, improvement and innovation of all a

Interrupts, how the interrupts are affected by system rest

how the interrupts are affected by system rest

Determine kva rating of the auto - transformer, Q. A 15-kVA, 2200:220-V, tw...

Q. A 15-kVA, 2200:220-V, two-winding, single- phase transformer is connected as an autotrans- former to step up voltage from 220 V to 2420 V. Without exceeding the rated current of

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd