Dpr preparation, Electrical Engineering

Assignment Help:

DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Calculate sending-end voltage at 0.9 pf lagging, A three-phase, 34.5-kV, 60...

A three-phase, 34.5-kV, 60-Hz, 40-km transmission line has a per-phase series impedance of 0.2+j0.5/km. The load at the receiving end absorbs 10 MVA at 33 kV. Calculate the follow

Metering technologies, Metering Technologies An electric meter or ener...

Metering Technologies An electric meter or energy meter is a device in which measures the amount of electrical energy supplied to customers of an electric supply company. Elec

Semiconductor, What is the similarities between a vacuum diode and a triode...

What is the similarities between a vacuum diode and a triode?

What is power gain, Q. What is power gain? Power gain is the ratio of p...

Q. What is power gain? Power gain is the ratio of power delivered to the load to power delivered to the amplifier is the power gain. A p =P o /P i     =V o I o /V i I s

What is the output modes used in 8279, What is the output modes used in 827...

What is the output modes used in 8279? 8279 gives two output modes for selecting the display options. 1.Display Scan In this mode, 8279 gives 8 or 16 character-multiple

Explain the purpose of the global descriptor table register, Explain the pu...

Explain the purpose of the global descriptor table register. The GDTR stand for global descriptor table register and IDTR stand for interrupt descriptor table register conta

3-phase 180 degree mode vsi , 3-phase 180 0 mode VSI In 1800 mode VSI...

3-phase 180 0 mode VSI In 1800 mode VSI  each thyristor  conduct  for 1800 and two  thyristor  are fired  at 600 interval. For  example  if thyristor  T1  is fired at 00 then

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd