Dpr preparation, Electrical Engineering

Assignment Help:

DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Define the binary counting - counters, Define the Binary Counting - Counter...

Define the Binary Counting - Counters? The Binary counter is capable to be constructed from J-K flip-flops by taking the output of one cell to the clock input of the next The J

Karnaugh map, how can be a karnaugh map of the count of sequence: 0-5-6-9-1...

how can be a karnaugh map of the count of sequence: 0-5-6-9-11-14

Explain about automatic stabilizers, Q. Explain about Automatic Stabilizers...

Q. Explain about Automatic Stabilizers? Automatic Stabilizers: Government fiscal policies which have effect of automatically moderating cyclical ups and downs of capitalism.

What are the different functional units in 8086, Bus Interface Unit and imp...

Bus Interface Unit and implementation unit, are the two dissimilar functional units in 8086.

Compute the terminal voltage and current of each generator, Q. Three dc gen...

Q. Three dc generators are operating in parallel with excitations such that their external characteristics are almost straight lines over the working range with the following pairs

Quick ratio, Quick ratio A stringent indicator that determines whether...

Quick ratio A stringent indicator that determines whether a firm has enough short-term assets to cover its immediate liabilities without selling inventory. It is calculated as

Explain the different types of multivibrators, Explain the different types ...

Explain the different types of multivibrators ? Multivibrator is basically  a two-stage amplifier with output of one supplied back to the input of the other . Multivibr

Controls and system, transfer function of Lube Oil Cooler Temperature

transfer function of Lube Oil Cooler Temperature

Explain resistance-capacitance coupling, Q. Explain Resistance-capacitance ...

Q. Explain Resistance-capacitance coupling? It is the most commonly used coupling in discrete device amplifier as it is least expensive and has satisfactory frequency response.

What is time switches, Q. What is Time Switches? Principle of a time sw...

Q. What is Time Switches? Principle of a time switch is displayed in Figure. It connects an incoming n channel PCM highway to an outgoing n channel PCM highway. As any incoming

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd