DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Diod, explain the application of the Si,zener,and LED diodes

explain the application of the Si,zener,and LED diodes

What is program counter, Program counter holds the address of either the fi...

Program counter holds the address of either the first byte of the next instruction to be fetched for implementation or the address of the next byte of a multi byte instruction, whi

Calculate the power dissipated in the amplifier, For the amplifier circuit ...

For the amplifier circuit shown in Figure with R i ≅ ∞,R o ≅ 0,A = 10,R L = 100 , and v in = 1 V, calculate the power dissipated in the amplifier if the voltage at the power-s

Explain working of inverting summing amplifier, Q. Explain working of Inver...

Q. Explain working of Inverting Summing Amplifier? The circuit of Figure is extended by adding other input points, as shown in Figure. Because of the virtual ground at terminal

Control system, what is the difference between the continuous time system ...

what is the difference between the continuous time system and discrete time system and their advnatages?

Mini computers - introduction to microprocessors , Mini Computers Large...

Mini Computers Larger  computer  more  computing  power  having  capability to address  more  memory  and  more  speed  than  microcomputer called minicomputer. These computers

Blanking circuit, Blanking circuit: The saw tooth sweep voltage applied to...

Blanking circuit: The saw tooth sweep voltage applied to the X places moves beam across the CRT tube in a straight horizontal line from left to right during the sweep or trace tim

Explain about dial pulses, Q. Explain about Dial Pulses? Dial pulsing (...

Q. Explain about Dial Pulses? Dial pulsing (sometimes known as rotary dial pulsing) is the method basically used to transfer digits from a telephone set to the local switch. Pu

What is program counter in 8085, Program counter holds the address of also ...

Program counter holds the address of also the first byte of the next instruction to be fetched for implementation or the address of the next byte of a multi byte instruction, which

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd