Dpr preparation, Electrical Engineering

Assignment Help:

DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Determine l and c of the band pass filter circuit, Q. Determine L and C of ...

Q. Determine L and C of the band pass filter circuit of Figure to have a center frequency of 1 MHz and a bandwidth of 10 kHz. Also find the Q of the filter.

Compute the turns ratio and the winding current ratings, Q. A transformer i...

Q. A transformer is rated 10 kVA, 220:110 V (rms). Consider it an ideal transformer. (a) Compute the turns ratio and the winding current ratings. (b) If a 2-load resistance

Describe the memory allocation schemes in an embedded system, a. Describe t...

a. Describe the memory allocation schemes in an embedded system. Also give a short-note on extended memory. (6) b. Consider a byte - addressable computer with 16 - bit addresses

How address and data lines are demultiplexed in 8085, How address and data ...

How address and data lines are demultiplexed in 8085? AD0-AD7 lines are multiplexed and the lower half of address A0-A7 is available only during T1  of the machine cycle. This

What do you mean by sub address, Q. What do you mean by sub address? A ...

Q. What do you mean by sub address? A sub address, though a part of the ISDN address, isn't considered as an integral part of the numbering scheme. Sub address is carried in a

Superposition, advantages and disadvantaages of superposition

advantages and disadvantaages of superposition

Op, Find the current through capacitor by superposition therom

Find the current through capacitor by superposition therom

Production of rotating fields from single-phase windings, Production of Rot...

Production of Rotating Fields from Single-Phase Windings In this subsection we show that a single-phase winding carrying alternating current produces a stationary pulsating flu

power system operation, AskWrite short notes on pit head generation. ques...

AskWrite short notes on pit head generation. question #Minimum 100 words accepted#

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd