Dpr preparation, Electrical Engineering

Assignment Help:

DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Energy conservation building codes, Energy Conservation Building Codes ...

Energy Conservation Building Codes It encompass the norms and standards of energy consumption expressed in terms of per square meter of the area wherein energy is used. The

Transistor as a switch, Transistor as a switch: Transistors are genera...

Transistor as a switch: Transistors are generally employed as electronic switches, for both of the high power applications including switched-mode power supplies and low power

Methods of testing, Methods of Testing Irrespective of reasons, testin...

Methods of Testing Irrespective of reasons, testing is commonly carried out 1. On site, or 2. In a Meter Testing Station (MTS) accredited as per IS/ISO/IEC 17025.

Draw the impedance diagram of the system, The one line diagram of a simple ...

The one line diagram of a simple power system is shown below.  The data of the system are given in the table below.  (a) Draw the impedance diagram of the system and mark all im

#title., what is plane transmission grating/?

what is plane transmission grating/?

Explain polymers and their applications, Explain Polymers and their applica...

Explain Polymers and their applications. Polymeric materials or plastics contain a large group of organo or organic metallic high molecules compound. The common properties of s

Find the largest current out, Q. Consider a BJT switch connected to the nex...

Q. Consider a BJT switch connected to the next stage, as shown in Figure, in which iout is likely to be negative when v out is high. Assume V CC = 5 V, R C = 1k, and the high r

Power control - motor control , Power Control A chopper converts  fix...

Power Control A chopper converts  fixed  de input voltage to a controllable dc output voltage. It is  the single  stage dc to dc conversion device. It is a high  speed  on/ of

Evaluate complex power in power system, Q. Evaluate complex power in power ...

Q. Evaluate complex power in power system? The complex power ¯S in a single-phase systemis the complex sum of the real (P) and reactive (Q) power, expressed as follows:

Electrical distribution system, 1. Name the three parts of a programmable l...

1. Name the three parts of a programmable logic controller (PLC) and explain why the PLC is preferred by designers over electromechanical relays. 2. Medium-voltage circuit break

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd