Dpr preparation, Electrical Engineering

Assignment Help:

DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Factors which affect the inductance of an inductor, Factors which affect th...

Factors which affect the inductance of an inductor include:  i)  The number of turns of wire (N) - more turns the higher the inductance ii)  The cross-sectional area of the

Types of power diode , Types of Power Diode According  to their  rever...

Types of Power Diode According  to their  reverse recovery characteristics of power diodes it can be  classified as follows: a.       General purpose  diodes b.      Fas

What is time switches, Q. What is Time Switches? Principle of a time sw...

Q. What is Time Switches? Principle of a time switch is displayed in Figure. It connects an incoming n channel PCM highway to an outgoing n channel PCM highway. As any incoming

Determine and sketch il for inductance, Q. For the circuit of Figure, deter...

Q. For the circuit of Figure, determine and sketch i L (t) and vC(t) for inductance values of (a)3/4 H, (b) 2/3 H, and (c) 3/17 H. Note that the inductance values are chosen her

What are the different parameters of jfet, Q. What are the different parame...

Q. What are the different parameters of jfet ? A bipolar junction transistor (BJT) is a current controlled device that is output characteristics of the device are controlled by

Gis application architecture, GIS application architecture: GIS applic...

GIS application architecture: GIS application architecture should 1  Give a framework and the essential programming interfaces to enable complex GIS applications to be deve

Find an expression for the total flux, Q. A rectangular loop is placed in t...

Q. A rectangular loop is placed in the field of an infinitely long straight conductor carrying a current of I amperes, as shown in Figure. Find an expression for the total

Find a local s-matrix for each triangle, Figure show two first-order triang...

Figure show two first-order triangular finite elements used to solve the Laplace equation for electrostatic potential. Find a local S -matrix for each triangle, and a global S -m

Explain the configuration of a step-by-step switching system, With neat dia...

With neat diagrams explain the configuration of a step-by-step switching system. Schematic diagram for such an exchange is given in Figure.  Every subscriber is connected to a

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd