DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

What is positive clipper, Q. What is positive clipper? Give 2 types of its ...

Q. What is positive clipper? Give 2 types of its applications ? In the series positive clipper, when the input voltage is positive, the diode does not conduct and acts an open

Calculate the pu voltage and line to line voltage, The one line diagram of ...

The one line diagram of a simple power system is shown below. The data of the system are given in the table below. (a) Draw the impedance diagram of the system and mark all impe

Comparison of analog-modulation systems, Comparison of Analog-Modulation Sy...

Comparison of Analog-Modulation Systems The comparison of analog modulation systems (conventional AM, DSB SC, SSB SC, VSB, FM, and PM) can be based on three practical criteria:

Explain symmetrical t-attenuator, Question 1 State and Explain Kirchhoff's...

Question 1 State and Explain Kirchhoff's Voltage and Current Law Question 2 State and prove Thevenine's Theorem Question 3 What is a filter? Design a Constant -K band Pa

Clampers.., plz give ans about signs of capicitor, and give detail about cl...

plz give ans about signs of capicitor, and give detail about clampers.

What do you man by subtractive polarity, Q. Show polarity markings for a si...

Q. Show polarity markings for a single-phase transformer for (a) subtractive polarity, and (b) additive polarity.

Draw the block diagram of phase cancellation ssb generator, a. The antenna ...

a. The antenna current of an AM broadcast transmitter, modulated to depth of 40% by an audio sine wave is 11 amp. It enhances to 12 amp as a result of simultaneous modulation by an

What is program counter in 8085, Program counter holds the address of also ...

Program counter holds the address of also the first byte of the next instruction to be fetched for implementation or the address of the next byte of a multi byte instruction, which

Octal number systems, Octal Number Systems Now the  question may  arise...

Octal Number Systems Now the  question may  arise in one mind  that why  to learn  octal  number  system when  neither  human  nor the  digital  systems  uses. It  hence it is

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd