DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Digital logical disign, design SR latch with universal logic gates.draw and...

design SR latch with universal logic gates.draw and explain the logic diagrams

Explain basic working of transport layer, Q. Explain basic working of Trans...

Q. Explain basic working of Transport Layer? It is responsible for establishing a network independent communication path appropriate for the specific terminal equipments (for exa

Interrupt signals - pins and signals , Interrupt Signals There are five...

Interrupt Signals There are five  interrupt  signals in 8085 microprocessor.  These  signals  are used to inter rut the  current  program  under  execution and  transfer the ex

Show the frequency response of rc coupled amplifier, Q. Show the Frequency ...

Q. Show the Frequency response of Rc Coupled Amplifier? 1. At low frequency i.e,less than 50 Hz reactance of Cc is going high hence same part of the signal will pass from one s

Compute the percentage change, Q. A particular BJT has a nominal value of α...

Q. A particular BJT has a nominal value of α 0.99. Calculate the nominal β.If α can easily change ±1%, compute the percentage changes that can occur in β.

Discuss about signal distortion in optical waveguides, Discuss about signal...

Discuss about signal distortion in optical waveguides Ans: The major reason for signal distortion within optical waveguide is dispersion. Dispersion of the transmitted

Express the instantaneous power, Q. On a per-phase basis, let v = √2 V cos ...

Q. On a per-phase basis, let v = √2 V cos ωt and i = √2 I cos (ωt - θ). (a) Express the instantaneous power s(t) in terms of real power P and reactive power Q. (b) Now consid

Diode model , Find I and V in the figure using ideal diode model

Find I and V in the figure using ideal diode model

N-type semiconductor, a)  Sketch the variation of electron concentration wi...

a)  Sketch the variation of electron concentration with temperature for i)  an n-type semiconductor doped with 1021  donors m-3 ii)  an intrinsic semiconductor.  b)  Expla

Ultrasonic Sensor Help for Seventh Grader, What are ultrasonic sensors made...

What are ultrasonic sensors made of? What is a good online source to find information on a basic level about ultrasonic sensors?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd