DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Pdc, disadvantages of shunt clippers

disadvantages of shunt clippers

Explain the effect of magnetic field on superconductors, Explain supercondu...

Explain superconductivity and explain the effect of magnetic field on superconductors. Various metals become superconducting below a temperature that is the characteristic of t

Water.., hot and cold lime soda process

hot and cold lime soda process

Input offset current of operational amplifier, Q. Input offset current of o...

Q. Input offset current of operational amplifier? The adverse effect of the input bias current mentioned would be nulli?ed if both inputs were connected to equal resistances (o

Characteristics of an n-channel enhancement mosfet, Q. Find idealized expre...

Q. Find idealized expressions for the active and ohmic states and sketch the universal characteristics of an n-channel enhancement MOSFET operated below breakdown.

Calculate the power factor of the motor, A 3 phase 400 volt(line to line) w...

A 3 phase 400 volt(line to line) wye connected synchronous motor has Xs= 1 ohm per phase and a negligible armature resistance. The field current is so adjusted that the internal(in

Explain the procedure for design of sequential circuits, Explain the Proced...

Explain the Procedure for design of Sequential Circuits? The design of the synchronous sequential circuit starts from a set of specifications and culminates in a logic diagram

Change management in power distribution, Change Management in Power Distrib...

Change Management in Power Distribution: Organisational change might be described as an organisation-wide effort to augment the effectiveness of an organisation through str

Determine the value of voltage using offset diode model, Use the offset dio...

Use the offset diode model with a threshold voltage of 0.6 V to determine the value of v 1 for which the diode D will first conduct in the circuit of Figure(a).

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd