Dpr preparation, Electrical Engineering

Assignment Help:

DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Hardware requirement - gis technology, Hardware Requirement- Se...

Hardware Requirement- Server of adequate sizing for enterprise-wide deployment for storing maps and geospatial data. Application server and web server. Desktops

Explain series circuit, Series circuit Total resistance, R T = R1 + R2...

Series circuit Total resistance, R T = R1 + R2 + R3 The current I is the same in all parts of the circuit , I = I 1 = I 2 = I 3 The voltage drop at each resistor, V1,

Capacitors with electrical equipment, Capacitors : These are electrical co...

Capacitors : These are electrical condensers having a system of electrical conductors and insulators. The simplest form consists of two parallel metal plates separated by a layer

Name all the switching schemes used in a digital exchange, Q. Name all the ...

Q. Name all the switching schemes used in a digital exchange. How call processing occur? Ans: The basic types of switching systems used are: 1.  Stronger Switching System

Find the line current delivered by the source, Q. Balanced wye-connected lo...

Q. Balanced wye-connected loads drawing 10 kW at 0.8 power factor lagging and 15 kW at 0.9 power factor leading are connected in parallel and supplied by a 60-Hz, 300-V, three-phas

Classify the conducting materials, Classify the conducting materials. ...

Classify the conducting materials. Conducting materials are classified by low resistivity materials and high resistivity materials. Low resistivity materials: The conduct

What is barkhausen criterion, Q. What is Barkhausen criterion? Why is the v...

Q. What is Barkhausen criterion? Why is the value of Ab kept slightly greater than 1? The condition |Ab| = 1 is called the Barkhausen criterion. It implies that when |Ab| = 1,

Determine the voltage across each resistor, For the circuit of Fig: (i) ...

For the circuit of Fig: (i) using Kirchoff's Laws , find all the currents (ii)  determine the voltage across each resistor and check that all loops comply with KVL (iii

Calculate the current flow using norton theorem, Calculate the current flo...

Calculate the current flow in 30Ω resistor for the circuit in figure using Norton Theorem.

Types of multiplexing techniques, (a) List three types of Multiplexing tech...

(a) List three types of Multiplexing techniques. (b) Give two advantages of "Multiplexing". (c) Given the total duration for the signal is 8 ns. What is the bit rate for

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd