DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Avalanche breakdown region, Avalanche breakdown region: Even though th...

Avalanche breakdown region: Even though these regions are well described for sufficiently large applied voltage, they overlap somewhat for small (less than a few hundred milli

Design a controller, Linearize the swing equations around an equilibrium po...

Linearize the swing equations around an equilibrium point. Compute the transfer function from the input U to the output !. For which equilibria is the linearizes system stabl

Design a matching network of balanced stubs, A certain cellular telephone a...

A certain cellular telephone antenna has an input impedance at f=1.0 GHz modeled by a shunt R-C combination, with R=200Ω and C=2.0pF. Because of manufacturing restrictions, you can

What are the hardware elements in the embedded systems, What are the hardwa...

What are the hardware elements in the embedded systems? Hardware Elements in the Embedded Systems are as follows: (i) Power Source (ii) Clock Oscillator Circuit and Clock

Calculate the iron loss, Q. The efficiency of a 400-kVA, single-phase, 60-H...

Q. The efficiency of a 400-kVA, single-phase, 60-Hz transformer is 98.77% when delivering full-load current at 0.8 power factor, and 99.13%with half rated current at unity power fa

Differentiate thermoplastic & thermosetting plastic material, Classify plas...

Classify plastic materials into two categories describe their important properties and give two examples of each. Plastic materials can be categorized in thermoplastic and ther

Design an electro-pneumatic system, (i) Sketch a fully-labelled electro-pne...

(i) Sketch a fully-labelled electro-pneumatic circuit showing your actuators in the START position and employ metered out speed control with mono-stable 5/2 DCV's having solenoid a

Draw the block diagram of phase cancellation ssb generator, a. The antenna ...

a. The antenna current of an AM broadcast transmitter, modulated to depth of 40% by an audio sine wave is 11 amp. It enhances to 12 amp as a result of simultaneous modulation by an

Determine the efficiency of the transformer, 1.    A 230/1000V 50 Hz, singl...

1.    A 230/1000V 50 Hz, single phase transformer has the following test data: Open circuit test (L.V.) Primary voltage = 230V Primary current = 1.30 A Input power

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd