Dpr preparation, Electrical Engineering

Assignment Help:

DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

4gls - fourth generations languages, 4GLs (Fourth Generations Languages) ...

4GLs (Fourth Generations Languages) These  are called  non procedural  languages May be considered as  advanced HLL. Objects oriented programming  languages and language  with

Equalizer rings, purpose of equalizer rings in lap winding

purpose of equalizer rings in lap winding

Microprocessor, Memory map of tpa in a personal computer and explain such o...

Memory map of tpa in a personal computer and explain such of the areas in brief

Determine the voltage regulation at full load, A three-phase, wye-connected...

A three-phase, wye-connected, cylindrical-rotor synchronous generator rated at 10 kVA and 230  V has a synchronous reactance of 1.5per phase and an armature resistance of 0.5  pe

Compute the total capacitance with parallel connection, Compute the total c...

Compute the total capacitance with parallel connection: Three capacitors C 1 , C 2 and C 3 contain capacitance 20 μf, 15 μf, 30 μf, respectively. compute: 1. Charge on ea

Working of a negative clamping circuit, Q. Draw and explain the working of ...

Q. Draw and explain the working of a negative clamping circuit. The clamping network shown above is a negative clamping circuit that will clamp the input signal to a negative d

Explain about transistor amplifiers, Q. Explain about Transistor Amplifiers...

Q. Explain about Transistor Amplifiers? Amplifiers are circuits that produce an output signal which is larger than, but proportional to, an input signal. The input and output s

Permanent magnets, If a permanent magnet creates the flux in a magnetic cir...

If a permanent magnet creates the flux in a magnetic circuit, the flux exists without the need for a coil, so how does Amperes Law apply to this case?   In this case the flux is

Basic building block of a block diagram, The mathematical relationships of ...

The mathematical relationships of control systems are usually represented by block diagrams, which show the role of various components of the system and the interaction of variable

Fourier deconstruction, Fourier Deconstruction Find the Fourier series ...

Fourier Deconstruction Find the Fourier series as far as the third harmonic, to represent the periodic function y, given by the values in the following table.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd