DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Develop a block diagram of an asynchronous decade counter, Q. Counting to m...

Q. Counting to moduli other than 2 is a frequent requirement, the most common being to count through the binary-coded decimal (BCD) 8421 sequence. All that is required is a four-st

Compute the worst voltage regulation, Q. The following data were obtained o...

Q. The following data were obtained on a 25- kVA, 2400:240-V, 60-Hz, single-phase distribution transformer: • Open-circuit test with meters on LV side: 240 V, 3.2 A, 165 W •

What are the hardware elements in the embedded systems, What are the hardwa...

What are the hardware elements in the embedded systems? Hardware Elements in the Embedded Systems are as follows: (i) Power Source (ii) Clock Oscillator Circuit and Clock

Switching characteristics, Switching Characteristics Switching  charact...

Switching Characteristics Switching  characteristics  of BJT  are shown  in figure. Due  to the presence of internal  capacitances BJT  cannot be  turned  instantly. Initially

Explain about synchronous machines, Q. Explain about Synchronous machines? ...

Q. Explain about Synchronous machines? Large ac power networks operating at a constant frequency of 60 Hz in the United States (50 Hz in Europe) rely almost exclusively on sync

Draw a state diagram of 3-bit ripple counter, The block diagram for a 3-bit...

The block diagram for a 3-bit ripple counter is shown in Figure (a). Obtain a state table for the number of pulses N = 0 to 8, and draw a state diagram to explain its operation.

Gate source cut off voltage, Q. Gate source cut off voltage? It is the ...

Q. Gate source cut off voltage? It is the gate source voltage where the channel is completely cut off and the drain current becomes zero.It is interesting to note that the valu

What do you mean by sub address, Q. What do you mean by sub address? A ...

Q. What do you mean by sub address? A sub address, though a part of the ISDN address, isn't considered as an integral part of the numbering scheme. Sub address is carried in a

Explain node-voltage and mesh-current analyses, Explain Node-voltage and me...

Explain Node-voltage and mesh-current analyses? The node-voltage and mesh-current methods, which complement each other, are well-ordered systematic methods of analysis for solv

Working hydro-electric power plant, With the help of neat diagrams illustra...

With the help of neat diagrams illustrate the construction and working of various elements used in hydro-electric power plant. Compare hydro-electric power plant with other type

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd