Dpr preparation, Electrical Engineering

Assignment Help:

DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Development of PLC- controlled crystallization model, 1.Describe the techno...

1.Describe the technological process of crystallization. 2. Compose the requirements to developed crystallization model.stion..

Digital storage oscilloscope , Q. Explain digital Storage Oscilloscope (DSO...

Q. Explain digital Storage Oscilloscope (DSO) with neat diagram, (b) Give the difference between analog and digital storage oscilloscope.   Principle of operation : The availa

Disadvantages - high level languages, Disadvantage - High  level  Langua...

Disadvantage - High  level  Languages a.Computational time is more as compared to  machine languages. b.Requires more  memory. c.Requires the knowledge of specific rules

Ripple voltage amplitude, a) What is meant by Ripple Voltage?  Measure the ...

a) What is meant by Ripple Voltage?  Measure the Ripple Voltage Amplitude, Frequency and DC Offset b) Describe how Ripple Voltage could be decreased.

Use mesh analysis and nodal analysis to determine voltage, Q. Use (a) mesh ...

Q. Use (a) mesh analysis and (b) nodal analysis to determine the voltage ¯V at the terminals A-B of Figure.

Illustrate about full duplex transmission, Q. Illustrate about Full Duplex ...

Q. Illustrate about Full Duplex Transmission? Full Duplex Transmission Data can travel in both directions simultaneously. There is no need to switch from transmit to receive

Compare with memory, Compare with memory The contents  of the memory...

Compare with memory The contents  of the memory  of the memory  location  pointed by HL  register pair are compared with the  contents of the accumulator. The  instruction f

Illustrate the concept of part families, (a) Illustrate the concept of Part...

(a) Illustrate the concept of Part Families ? (b) Explain briefly the general process to solve the problem of grouping the parts into families.

Electromechanical meters, Electromechanical Meters Electromechanical e...

Electromechanical Meters Electromechanical energy meters are based on the Ferraris Principle (see note in the margin). The working of these meters is explained. Working o

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd