Dpr preparation, Electrical Engineering

Assignment Help:

DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Determine the value of the load resistance, Q. A60-Hz, 100-kVA, 2400/240-V(...

Q. A60-Hz, 100-kVA, 2400/240-V(rms) transformer is used as a step-down transformer from a transmission line to a distribution system. Consider the transformer to be ideal. (a) F

What are the modes of operations used in 8253, What are the modes of operat...

What are the modes of operations used in 8253? Each of the three counters of 8253 can be operated in one of the following six modes of operation. 1. Mode 0 (Interrupt on ter

Compute the worst voltage regulation, Q. The following data were obtained o...

Q. The following data were obtained on a 25- kVA, 2400:240-V, 60-Hz, single-phase distribution transformer: • Open-circuit test with meters on LV side: 240 V, 3.2 A, 165 W •

When mt2 is negative and g is positive , When MT 2 is Negative  and g is ...

When MT 2 is Negative  and g is positive In this  case  gate  current  flows  through  junctions P 2 N 2   electrons  are injected from  N 2   layer to  P 2   a result  junct

Explain common base configuration, Q. Explain common base configuration? ...

Q. Explain common base configuration? Common-base transistor amplifiers are so-called because the input and output voltage points share the base lead of the transistor in commo

Explain the working of a depletion type mosfet, Q. With a cross sectional v...

Q. With a cross sectional view, explain the working of a depletion type MOSFET Draw a biasing amplifier circuit DEPLETION-TYPE MOSFET: Two types of FETs: JFETs and MOSFETs. MOS

Magnetic circuits, Magnetic circuits To  see  how  this   is  used   i...

Magnetic circuits To  see  how  this   is  used   in  practice, consider a coil of N turns wound onto a closed ring shaped former with a very high (note:    r (steel) = 200

Show quantization error, Quantization Error Sampling followed by quanti...

Quantization Error Sampling followed by quantization is equivalent to quantization followed by sampling. Figure illustrates a message signal f (t) and its quantized version den

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd