1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Calculate the voltage, 1. The circuit is: A circuit which lights a LED w...

1. The circuit is: A circuit which lights a LED when a voltage is above 14 volts and flashes the LED (at about 1 Hz) below 10 Volts. The circuit should also continuously sounds

Numerical analysis curve fitting, Ask question #Minimum 100 wThe voltage v...

Ask question #Minimum 100 wThe voltage v across a capacitor at time t seconds is given by the following table. Use the principle of least squares to fit a curve of the form v = ae

Design mux, Design 8:1 Mux for a given function, f=Σ (0, 1,5,7,9, 13)

Design 8:1 Mux for a given function, f=Σ (0, 1,5,7,9, 13)

Show the familiar electric sources, Q. Show the familiar electric sources? ...

Q. Show the familiar electric sources? Batteries and ac outlets are the familiar electric sources. These are voltage sources.An ideal voltage source is one whose terminal volta

State norton''s theorem, Norton's Theorem Nortons Theorem states: "A...

Norton's Theorem Nortons Theorem states: "Any linear circuit containing several energy sources and resistances can be replaced by a single Constant Current generator in para

Find the power amplification, The constants of an amplifier are given by A ...

The constants of an amplifier are given by A = 1, R i =10,000, and R o = 100. It is driven by a Thévenin source with v Th (t) = V O cos ωt and R Th = 20,000 . The amplifier o

Find the percent voltage regulation of the transformer, Q. A 25-kVA, 2400/2...

Q. A 25-kVA, 2400/240-V, 60-Hz, single-phase transformer has an equivalent series impedance of 3.45 + j5.75  referred to the primary high voltage side. The core loss is 120 W. Whe

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd