Dpr preparation, Electrical Engineering

Assignment Help:

DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Digital electronics, Digital Electronics: We have study the fundamenta...

Digital Electronics: We have study the fundamentals of Digital circuits. Primary we have studied the mathematics of Binary numbers also called as Boolean algebra and how to im

Short note on types of enclosure of machine, Q.   Write a short note on typ...

Q.   Write a short note on types of enclosure of machine. Sol.       The various types of d.c. machine :              (1) Magnetic frame or Yoke              (2)

Explain the discovery of neutron. mention its properties, Explain the disco...

Explain the discovery of neutron. Mention its properties. Discovery of Neutron: The existence of neutron was first predicted by Rutherford in the year 1920. But it was discov

8085 and 8086 in microprocessor, What is the difference among 8085 and 8086...

What is the difference among 8085 and 8086 in microprocessor? Ans) 8086 has a special concept known as memory segmentation. It permits parallel processing, whereas 8085 does no

Discuss the low- and high-frequency designs, Consider a CS JFET amplifier w...

Consider a CS JFET amplifier with the following parameters : R 1 = 350 k; R 2 = 100 k, R SS = 1200 , R D = 900 , R L = 1000 , R S = 2000 , ro = 15 k,gm = 6 × 10 -3 S,

Explain working of single-phase induction motors, Q. Explain working of Sin...

Q. Explain working of Single-Phase Induction Motors? For reasons of simplicity and cost, a single-phase power supply is universally preferred for fractional-horsepower motors.

Ohms law, Normal 0 false false false EN-US X-NONE X...

Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4

Steps to develop microprocessor based computer system, Explain in brief ste...

Explain in brief steps to develop a Microprocessor based computer system. The design of a microcomputer system should begin with the CPU module. It modules establishes the fund

Rftfrfr, #questionfrfrfrfr..

#questionfrfrfrfr..

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd