Dpr preparation, Electrical Engineering

Assignment Help:

DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

D flip-flop - latch or delay element, Q. D flip-flop - latch or delay eleme...

Q. D flip-flop - latch or delay element? The symbol for the clocked D flip-flop is shown in Figure (a), in which the two output terminals Q and ¯ Q behave just as in the SRFF,

Obtain the waveforms, Q. (a) Consider a diode circuit with RC load as shown...

Q. (a) Consider a diode circuit with RC load as shown in Figure. With the switch closed at t = 0 and with the initial condition at t = 0 that vC = 0, obtain the functional forms of

Build an intersection traffic light using the led, Build an intersection tr...

Build an intersection traffic light using the LED's as in the diagram below Day Use the LED's on the trainer (port 11) Main Street and Side Street alternate. Mai

Electrons, Ask question #Minimum 100 words accepted how does the charge pla...

Ask question #Minimum 100 words accepted how does the charge plate relate to the movement of electrons

Actuators , Actuators These devices convert electromagnetic energy to...

Actuators These devices convert electromagnetic energy to mechanical energy to produce intermittent mechanical movement (e.g. opening a valve in a central heating system or c

Energy stored in inductor, One circuit has resistor 40? connected in series...

One circuit has resistor 40? connected in series with inductor  15H and dc voltage 220V. Calculate: i)  Time constant ii)  Current at time (i) iii)  Current at time 0.0

Describe the function of material handling system, a) Diagram FMS layout co...

a) Diagram FMS layout configurations with labeling. b) what are the basic components of FMS?Discuss in briefly. c) Describe the function of material handling system.

Schmitt triggering, schmitt triggering with emitter coupled transister

schmitt triggering with emitter coupled transister

Draw the timing diagram for the first input pulses, Given the block diagram...

Given the block diagram of a synchronous counter shown in Figure (a), draw the timing diagram for the first input pulses, with Q 1 , Q 2 , and Q 3 initially at 0.

Bi directional buffer 74ls245 , Bi Directional Buffer 74LS245 This types...

Bi Directional Buffer 74LS245 This types  of bi directional  buffer is required for data  bus as it has  to function as bi directional bus. The logic  diagram  of such  buffer i

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd