Dpr preparation, Electrical Engineering

Assignment Help:

DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.


Related Discussions:- Dpr preparation

Evaluate the transfer function of the nested-loop system, Q. Determine the ...

Q. Determine the transfer function C(s)/R(s) of the nested-loop feedback system shown in Figure.

Power, what is reactivecpower

what is reactivecpower

D/a converter, weighted resistor and r2r ladder d/a converter

weighted resistor and r2r ladder d/a converter

What are the flags used in 8086, In 8086 Carry flag, Parity flag, Auxiliar...

In 8086 Carry flag, Parity flag, Auxiliary carry flag, Zero flag, Overflow flag, Trace flag, Direction flag Interrupt flag and Sign flag.   Mainly there ae two types of int

Identify the key cultural dimensions, This assessment requires you to refle...

This assessment requires you to reflect on an intercultural communication event that you have experienced between yourself and an Australian. a)  Describe the event without eval

Basic structure of an scr and the common circuit symbol, Q. Draw the basic ...

Q. Draw the basic structure of an SCR and the common circuit symbol ? The SILICON CONTROLLED RECTIFIER, usually referred to as an SCR, is one of the families of semiconductors

Explain interrupt vector table, The interrupt vector table is always create...

The interrupt vector table is always created in the first 1K area of the memory. Justify the statement. While the CPU receives an interrupt type number start from the PIC, this

Wye-delta transformation., what is the literature review about wye delta tr...

what is the literature review about wye delta transformation?? for 3 paragraphs atleast*

Communication network, Assuming that the receiver sends a XOFF signal when ...

Assuming that the receiver sends a XOFF signal when the receive buffer is P% full in order to avoid any data or packet loss.

Line diagrams of a network-large company, i need a line diagram sample of a...

i need a line diagram sample of a large network, i need to practice how to draw and design such network

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd