Discuss spiral model for software life cycle, Software Engineering

Assignment Help:

Discuss spiral model for software life cycle

SPIRAL MODEL

  • The spiral model is classified into number of frame works. These frameworks are represented by task regions.
  • Generally there are six task regions. In spiral model project access point axis is defined.
  • The task regions are as follows:

Customer communication

Planning

Risk analysis.

Engineering.

Construct and release.

Customer evaluation.

Disadvantage

  • It is depends on customer communication.
  • It requires considerable risk assessment.

 

 

 


Related Discussions:- Discuss spiral model for software life cycle

Explain what is meant by the term encapsulation, Question: (a)  Explain...

Question: (a)  Explain the difference between a link and an association. Use a simple example to illustrate your answer. (b)  Briefly describe the importance of CRC cards in

Testing, What is software testing?

What is software testing?

What condition exists after performing validation testing, What are the con...

What are the conditions exists after performing validation testing? After performing the validation testing there two situations arise. The function or performance characterist

What is code coverage and code inspection, What is Code Coverage and Code I...

What is Code Coverage and Code Inspection - This is an analysis method which verifies which parts of the software have already been covered by the test case suite and which are

Explain verification, The process of evaluating the products of a given sof...

The process of evaluating the products of a given software development activity to verify correctness and consistency with respect to the products and standards given as input to t

Define the level 1 of maturity model, Define the Level 1 of maturity model ...

Define the Level 1 of maturity model At this maturitylevel,software is developed an ad hoc basis and nonstrategic technique is used for its development. Success of developed s

What is infeasible path, Explain Infeasible Path? Program statement sequ...

Explain Infeasible Path? Program statement sequence that can never be implemented.

What is dfd, What is DFD? Data Flow Diagram depicts the information flo...

What is DFD? Data Flow Diagram depicts the information flow and the transforms that are applied on the data as it moves from input to output.

Define product metrics, Normal 0 false false false EN-I...

Normal 0 false false false EN-IN X-NONE X-NONE MicrosoftInternetExplorer4

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd