Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Q. Differentiate between ISO and CMM?
Ans) The difference between CMM and ISO are as follows :-
- ISO 9000 is awarded by an international standards body. Thus, ISO 9000 certification can be quoted by an organization in official documents. Therefore, SEI CMM assessment is purely for internal use.
- SEI CMM was developed particularly for software industry and thus addresses many issues which are specific to software industry alone.
- SEI CMM goes beyond quality assurance and makes an organization to ultimately achieve Total Quality Management (TQM). In fact, ISO 9001 aims at level 3 of SEI CMM model.
- SEI CMM model gives a list of key process areas (KPAs) on which an organization at any maturity level requires to concentrate to take it from one maturity level to the next. Therefore, it gives a way for achieving gradual quality improvement.
What is prototyping approaches in software process? i. Evolutionary prototyping - In this approach of system development, the initial prototype is prepared and it is then refin
Company Universal Consulting is a large consulting firm that specializes in IT consulting services for the Healthcare industry. The company employs over 2,000 dedicated IT professi
Determine in detail about Waterfall model Waterfall model provides a sequential and systematic approach to software development and is better than build and fix approach. Howev
Waterfall is a model of the software development process in which the idea phase, requirements phase, design phase, execution phase, test phase, installation phase, and checkout ph
online admision application
Big-Bang Testing : In this all the modules after unit testing are joint and tested in one go. The problem with this type of testing is debugging of errors.
List the principles of a software design. i. The design process should not suffer from "tunnel vision". ii. The design should be traceable to the analysis model. iii. The
What are the umbrella activities of a software process? Software project tracking and control. Risk management. Software Quality Assurance. Formal Technical Reviews.
Comparison testing is testing that evaluate software weaknesses and strengths to those of competitors' products.
How does the risk factor affect the spiral model of software development? Ans: Risk Analysis phase is the most significant part of "Spiral Model". In this phase all possible (a
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd