Difference between road gullies and catch pits, Civil Engineering

Assignment Help:

Q. Difference between road gullies and catch pits?

Both road gullies and catchpits are the two fundamental types of drainage inlets of drainage system. However they are designed to catch stormwater, road gullies and catchpits are intended to catch stormwater at different locations. Catchpits are designed to receive stormwater from slopes and stream courses. There isn't any standard design of catchpits and they can take various forms and shapes such as inclusion of sand trap to improve the quality of collected stormwater and to stop the blockage of drains. Conversely road gullies are intended to receive stormwater from roads only.


Related Discussions:- Difference between road gullies and catch pits

Concrete surface finish - limitations of ultrasonic system, Define Concrete...

Define Concrete Surface Finish - Limitations of Ultrasonic System? The smoothness of the surface under test is important to ensure proper acoustical contact between the transdu

Verify the grain specific gravity, Verify the grain specific gravity In...

Verify the grain specific gravity In a specific gravity test, the weight of the dry soil taken is 0.66 N. The weight of the pyknometer filled with this soil and water is 6.756

Optimum binder content in bituminous pavement, Q. Optimum binder content in...

Q. Optimum binder content in bituminous pavement? Amount of binder to be added to a bituminous mixture can't be too excessive or too little. Principle of designing the optimum

Forces reactions at that point, Mad/Sir What would be the Horizontal and ve...

Mad/Sir What would be the Horizontal and vertical component from this acting force see diagram

Explain procedure of remote sensing in satellites, Q. Explain procedure of ...

Q. Explain procedure of remote sensing in Satellites? Satellites used for remote sensing are of two types, viz, geostationary and polar orbiting. Geostationary stationary satel

Hydraulics, A tank with vertical sides contain 3m of water in the bottom, o...

A tank with vertical sides contain 3m of water in the bottom, overlain by 4m of oil with no intermixing. Draw pressure diagram due to the oil and water on one of the tank sides and

Explain the stopping sight distance, Explain the Stopping Sight Distance ...

Explain the Stopping Sight Distance Stopping Sight Distance Is the Sum of Two Distances (1) The distance traversed by the vehicle from the instant the driver sights an objec

Design nominal reinforcement to piles, Question Is it true that there i...

Question Is it true that there is no essential to design nominal reinforcement to piles. Answer In BS8110 and BS5400 Pt.4, they need provision of nominal reinforce

Determine the equivalent of free float, The free float is equal to: a. L...

The free float is equal to: a. Latest allowable event occurrence time + Early finish time b. Earliest event occurrence time + early finish time c. Latest allowable event o

Write Your Message!

Captcha
Free Assignment Quote