An electric heating element is rated at 4.0kW when connected to a single phase 240Vrms, 50 Hz AC supply, and is known to have a power factor of 0.833 lagging.
1. Calculate the current supplied to the heating element when connected to the 240Vrms AC source. Hence or otherwise determine the resistance and inductance of the heating element.
2. Sketch a phasor diagram for this operating condition, showing the applied voltage, load current and the voltages across the equivalent load resistance and reactance.
3. Determine the value of a shunt connected capacitance (μf) required to achieve unity power factor as seen by the supply. Determine the supply current and the real power absorbed by the heating element/capacitor combination for this operating configuration.
What is maximum shear stress in mechanics of materials ? Derivation for maximum and minimum shear stress seperately.
Evaluatio n the Enthalpy of Steam: Let h f = Heat of liquid or sensible heat of water in KJ/kg h f g = Latent heat of vaporization of steam in KJ/kg t
What are objectives of the footings? Objectives of the footings: After studying this unit, you should be able to: a. Know different types of footings and the situation wh
High growth has been observed since 2001-02 in automobile production. Annual growth was 16.0 percent in April-December, 2004; the growth rate in 2003-04 was 15.1 percent (Table 1.
Strength of spot welding Because spot welding has generally replaced riveting in many applications, it is reasonable to compare these two processes for strength. Often, riveted
A 1.2 m diameter steel pipe carries oil of relative density 0.822 under a head of 70 m of oil. What minimum thickness of 120 MPa (yield stress) steel would be required for a safety
The crate A of weight W=27lb is being pulled to the right by the winch at B. The crate starts at x=0 and is pulled a total distance 15ft over the rough surface for which the coeffi
what is Next Generation Manufacturing Strategy?
cause effect remedies
Schedule Evaluation Each continuations of a partial schedule that are produced in step 1 are ranked as per to their respective cost function. This cost function might be dissim
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd