Determine the origin of step, Mechanical Engineering

Assignment Help:

Determine the Origin of STEP

Considerable progress has been made in vector data exchange over the recent past. Initially, some CAD/CAM vendors offered direct translator software. There are several disadvantages to this approach, which include :

  • A unique pair of translators is needed for every version of every combination of CAD/CAM systems available in the marketplace.
  • The user is dependent on software vendors to maintain this almost infinite combination of version applications.
  • The maintenance of all these combinations of transfer capabilities is costly, and that cost is ultimately passed on to the user.
  • As a general rule, these translators passed low-quality solid geometry that was not adequate for driving NC operations without the CAD/CAM user having to aid the transfer process by doing a lot of geometry clean-up. Also, no attempt was made to transfer parametric model dependencies/constraints.

 


Related Discussions:- Determine the origin of step

Determine the reaction at specific points, Determine the reaction at specif...

Determine the reaction at specific points: A light rod AD can be supported by frictionless pegs at B and C and rests against frictionless wall at A as shown in th

HW engineering Statics, Hello, I need some assistance in solving engineerin...

Hello, I need some assistance in solving engineering statics problems. In the following link, I have uploaded seven questions. I need help solving these problems step-by-step. I

Define edge joints, Edge joints: The flanged edge joint is suit- able for p...

Edge joints: The flanged edge joint is suit- able for plate 1/4 inch or less in thickness and can only sustain light loads. Edge preparation for this joint may be done.

Bund and dike capacity, Bund / dike capacity is typically covered by local ...

Bund / dike capacity is typically covered by local codes and regulations, however some general principles for liquid storage compounds are: • The net capacity of a bunded / dik

Rubber hoses services tips, Rubber Hoses: Fuel or vacuum hoses should be i...

Rubber Hoses: Fuel or vacuum hoses should be installed so that end is bottomed into its fitting which would ensure adequate area for the hose clip to grip the hose beneath the fla

Fluid mechanics, A cart is moving along a track at a constant velocity of 5...

A cart is moving along a track at a constant velocity of 5 m/s as shown. Water (? = 1000 kg/m3) issues from a nozzle at 10 m/s and is deflected through 180° by a vane on the cart.

Compute the displacement of the particle, Compute the displacement of the p...

Compute the displacement of the particle: The acceleration time diagram for particle is as specified below .Computed velocity of the particle at several time intervals, plot v

Calculate the heat supplied from the outer surface, Consider laminar flow i...

Consider laminar flow in a circular tubewith a fully developed velocity profile.Let the heat be added at a constant rate along the tube from  x+ =0  to  x+ =0.10 . Thereafter ,let

Implementation of material requirement planning, Implementation of Material...

Implementation of Material Requirement Planning: The total requirements for a material from an MRP schedule are given in the following table :

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd