Determine force exerted by the jet, Mechanical Engineering

Assignment Help:

(a) Describe the terms "Fluid jet" & "Vane" in Fluid Machine.

(b) What is impulse - momentum principal in analysis and design of turbo machines.

What are the assumptions made during calculation of force exerted by jet on the plate ?

(b) A jet of water which has diameter of 8 cm. issues with a velocity of 40 m/sec. and impinges on a stationary flat plate which destroys its forward motion completely. Determine force exerted by the jet on the plate and work done ? (take density f water 1000 Kg/m3).


Related Discussions:- Determine force exerted by the jet

Problems, Prlblems 1 & 3 can you provide accurate and clear solved out solu...

Prlblems 1 & 3 can you provide accurate and clear solved out solutions not done by computer either.

Scanning electron microscope, 1- Explain the rationale of using a small WD ...

1- Explain the rationale of using a small WD to improve resolution. 2- In a tungsten SEM , Why does a high accelerating voltage provide the potential for higher resolution?  Why

#title.scale, actual division 2km is shown as 1 cm in a map.construct a cle...

actual division 2km is shown as 1 cm in a map.construct a clean scale to measure km which can travel a distance upto 30 km.Show measurement of 18 km in the scale

Residual stress and deformation in aluminum, deformation and stress in alum...

deformation and stress in aluminum 6061 after extrusion

3D, the cable AB which connects two structures carries a tension of 400N. ...

the cable AB which connects two structures carries a tension of 400N. express the force F which acts on point A as a vector in terms of the unit vector.determine the project of F

Show dike heights and distance from containers, Wall-type bunds / dikes for...

Wall-type bunds / dikes for storage compounds should be from 0.5 m to 1.5 m high (1.5 ft. - 5 ft. - check local codes and regulations), depending on the required containment capaci

Modularization of steam generators, Q. Modularization of Steam Generators? ...

Q. Modularization of Steam Generators? Vendor shall design and fabricate the high pressure Steam Generators so that a minimum of field assembly will be required. Module ship

Takt time for sand blasting, Takt Time for sand blasting:            ...

Takt Time for sand blasting:             Tatk time is crucial in manufacturing process. It determines the speed of production to produce a product. Time is money toward prod

Process of steam generation unit, Q. Process of Steam generation unit? ...

Q. Process of Steam generation unit? BFW from water treatment area is sent to the BFW Booster pumps at temperature around 105°C. The BFW is then heated and fed to the HP BFW Pu

Illustrate working of double acting steam engine, Illustrate working of dou...

Illustrate working of double acting steam engine. What is its diagram factor and thermal efficiency?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd