Determine about the prestressed concrete, Civil Engineering

Assignment Help:

Determine about the Prestressed concrete

Prestressed concrete is a special type of concrete in which internal stresses of a suitable nature, magnitude and distribution are intentionally induced so that undesirable stresses, generated from external loads are counteracted upto a desired degree or are completely eliminated. As tensile stresses are undesirable for concrete, compressive stresses are, infact, introduced in concrete as per the requirements by the use of stretched reinforcement (which is called tendon in prestressed concrete terminology). It should be appreciated that the introduction of compressive stresses in concrete improves the apparent tensile strength of it because the tensile stresses (due to external loads), induced later, have to first nullify these compressive stresses first. So, tensile stresses are wiped out upto the extent compressive stresses are introduced in concrete due to prestressing.


Related Discussions:- Determine about the prestressed concrete

Road and traffic engineering(signal timing design), what are the basic assu...

what are the basic assumption of traffic flow model and capacity model used in signal timing design ? discuss

WMM, gradation of materials used in wet mix macadam

gradation of materials used in wet mix macadam

Determine the analysis of presress, Analysis of presress  In pre-stress...

Analysis of presress  In pre-stressed structural elements, stretched tendons are placed inside concrete. The tensile stresses of the tendons are transferred to concrete in the

Enumerate the variation in tendon stress, Enumerate the Variation in tendon...

Enumerate the Variation in tendon stress In post-tensioned construction, several tendons are simultaneously stretched and anchored at the ends. It is assumed that all tendons

Building, What quantity of cement will be needed to lay 2000 blocks of 9 in...

What quantity of cement will be needed to lay 2000 blocks of 9 inches using a mortar ratio of 1:6 with a thickness of 25mm in-between blocks.

Overtaking sight distance, Overtaking Sight Distance: Overtaking sight...

Overtaking Sight Distance: Overtaking sight distance is calculated on the assumption that the overtaking vehicle (i) travels behind the overtaken vehicle to perceive the clear

Determine the size of the standpipe which should be used, A sample in a var...

A sample in a variable head permeameter is 8 cm in diameter and 10 cm high. The permeability of the sample is estimated to be 10 × 10 -4 cm/s. If it is desired that the head in th

Describe the boussinesq theory, A raft of size 4 m-square carries a load of...

A raft of size 4 m-square carries a load of 200 kN/m 2 . Verify the vertical stress increment at a point 4 m below the centre of the loaded area using Boussinesq's theory. Compare

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd