Determine about the prestressed concrete, Civil Engineering

Assignment Help:

Determine about the Prestressed concrete

Prestressed concrete is a special type of concrete in which internal stresses of a suitable nature, magnitude and distribution are intentionally induced so that undesirable stresses, generated from external loads are counteracted upto a desired degree or are completely eliminated. As tensile stresses are undesirable for concrete, compressive stresses are, infact, introduced in concrete as per the requirements by the use of stretched reinforcement (which is called tendon in prestressed concrete terminology). It should be appreciated that the introduction of compressive stresses in concrete improves the apparent tensile strength of it because the tensile stresses (due to external loads), induced later, have to first nullify these compressive stresses first. So, tensile stresses are wiped out upto the extent compressive stresses are introduced in concrete due to prestressing.


Related Discussions:- Determine about the prestressed concrete

Shear and tensile strength, What is the difference between shear and tensil...

What is the difference between shear and tensile strength? Ans) Tensile Strength for a Bolt is explained by applying a Force along it long axis. Shear Strength for a Bolt is exp

Explain basic need of design of shock transmission unit, Explain the Basic ...

Explain the Basic requirement of Design of shock transmission unit? The STU must withstand the specified design load. The stroke of the piston must be bigger than the movement

Define installation of pot bearings, Define Installation of Pot Bearings? ...

Define Installation of Pot Bearings? In a sliding POT bearing, positive fixing to the main structure may not be required if the bearing is always subjected to adequate vertical

Permanent repairs to rail fracture, Q. Permanent Repairs to rail fracture? ...

Q. Permanent Repairs to rail fracture? (i) If the fracture is such that, wide gap A T welding ban be adopted, then the total length of fractured ends to-be cut shall be equal t

How will you pay, when i have solved the given assignment work then how wil...

when i have solved the given assignment work then how will you pay me for that work??

Sub-base layer be served as a drainage layer , Question Would a sub-bas...

Question Would a sub-base layer be served as a drainage layer to take away water from pavement? Answer As well providing load distribution in post-construction stage a

Structure analysis, In a cantilever truss it is very essential to find out ...

In a cantilever truss it is very essential to find out the reactions before analyzing it.

Sand layer underlying paving slab or interlocking blocks, Question What...

Question What is function of a sand layer underlying paving slab or interlocking blocks? Answer Normally after laying of sub-base layer of paving slab or interlocking

Determine the late start time for activity, For the project network shown, ...

For the project network shown, the late start time (day) for activity "Q" is most nearly: Solution:  List the paths leading to "Q" and calculate the duration for each.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd