Determine about the prestressed concrete, Civil Engineering

Assignment Help:

Determine about the Prestressed concrete

Prestressed concrete is a special type of concrete in which internal stresses of a suitable nature, magnitude and distribution are intentionally induced so that undesirable stresses, generated from external loads are counteracted upto a desired degree or are completely eliminated. As tensile stresses are undesirable for concrete, compressive stresses are, infact, introduced in concrete as per the requirements by the use of stretched reinforcement (which is called tendon in prestressed concrete terminology). It should be appreciated that the introduction of compressive stresses in concrete improves the apparent tensile strength of it because the tensile stresses (due to external loads), induced later, have to first nullify these compressive stresses first. So, tensile stresses are wiped out upto the extent compressive stresses are introduced in concrete due to prestressing.


Related Discussions:- Determine about the prestressed concrete

Retaining wall, whether the wall has adequate sliding resistance

whether the wall has adequate sliding resistance

Theory on the horizontal reactions of portal frames, Determine the horizont...

Determine the horizontal abutment reaction of a rectangular portal frame under increasing central concentrated load

Premix carpet open graded, what is premix carpet open graded and where is i...

what is premix carpet open graded and where is it used and what are its limitations ?

What is collocated network operation, What is Collocated network operation ...

What is Collocated network operation As wireless LANs become more popular, it is likely for two or more wireless LANs to operate in the similar area or in some area where inter

What is the meaning of compressive stresses, What is the meaning of compres...

What is the meaning of compressive stresses These intentionally induced stresses are compressive in nature and these compressive stresses reduce or completely remove the undesi

Break even point, Break even point: EM Electricals, Inc., contains fix...

Break even point: EM Electricals, Inc., contains fixed costs of Rs. 600,000 this period. Variable costs involved labour charges of Rs.100 per unit and material cost of Rs. 200

Length is constructed in first phase of construction, In construction of a ...

In construction of a two-span bridge (span length = L) by using span-by-span construction, why is the length of about 1.25L bridge segment is constructed in first phase of construc

Calculate the principal stresses for the state of stress, Calculate the pri...

Calculate the principal stresses for the state of stress: Calculate the principal stresses and principal planes for the state of stress shown in Figure. Figure

Assignment, do u do drawing assignment ( 3rd angle projection)

do u do drawing assignment ( 3rd angle projection)

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd