Determine about the prestressed concrete, Civil Engineering

Assignment Help:

Determine about the Prestressed concrete

Prestressed concrete is a special type of concrete in which internal stresses of a suitable nature, magnitude and distribution are intentionally induced so that undesirable stresses, generated from external loads are counteracted upto a desired degree or are completely eliminated. As tensile stresses are undesirable for concrete, compressive stresses are, infact, introduced in concrete as per the requirements by the use of stretched reinforcement (which is called tendon in prestressed concrete terminology). It should be appreciated that the introduction of compressive stresses in concrete improves the apparent tensile strength of it because the tensile stresses (due to external loads), induced later, have to first nullify these compressive stresses first. So, tensile stresses are wiped out upto the extent compressive stresses are introduced in concrete due to prestressing.


Related Discussions:- Determine about the prestressed concrete

Chemistry, discuss various chemical reactions involved in lime soda process...

discuss various chemical reactions involved in lime soda process ?

Foundation, why is the foundation failure?

why is the foundation failure?

Write short notes on abrasion test, Q. Write short notes on Abrasion Test? ...

Q. Write short notes on Abrasion Test? The abrasion test for ballast shall be carried out using Los-Angeles machine.The abrasive charge shall consist of 12 nos. cast iron or s

Building classification, Why I is the missing after h and J is written in t...

Why I is the missing after h and J is written in the classification of building

Measurement of surface runoff and infiltration, Surface runoff travelling o...

Surface runoff travelling over ground surface to reach receiving water involves the following events: i) Rainfall intensity exceeds soil's infiltration rate; ii) Excess water

Calculate the daily standard production rate of equipment, Calculate the Da...

Calculate the Daily Standard Production Rate of Equipment An excavator with a bucket capacity of 3-yd 3 has a standard operating cycle time of 40 seconds. The daily standard p

Lifting of girders, Q. Lifting of girders? Lifting of girders : For gre...

Q. Lifting of girders? Lifting of girders : For greasing the bearings girders are required to be lifted. But the gap between the bottom flange of plate girders and the bed bloc

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd