Determine about the prestressed concrete, Civil Engineering

Assignment Help:

Determine about the Prestressed concrete

Prestressed concrete is a special type of concrete in which internal stresses of a suitable nature, magnitude and distribution are intentionally induced so that undesirable stresses, generated from external loads are counteracted upto a desired degree or are completely eliminated. As tensile stresses are undesirable for concrete, compressive stresses are, infact, introduced in concrete as per the requirements by the use of stretched reinforcement (which is called tendon in prestressed concrete terminology). It should be appreciated that the introduction of compressive stresses in concrete improves the apparent tensile strength of it because the tensile stresses (due to external loads), induced later, have to first nullify these compressive stresses first. So, tensile stresses are wiped out upto the extent compressive stresses are introduced in concrete due to prestressing.


Related Discussions:- Determine about the prestressed concrete

How to calculate the combined stresses, Compute the stresses at top and bot...

Compute the stresses at top and bottom fibers in a simply supported pre-stressed concrete beam with a rectangular cross section, 250 mm wide and 450 mm deep, as shown in Figure, at

The covers of electrical machines are made of what materials, The covers of...

The covers of electrical machines are made of what materials ? Answer: It is made of  soft magnetic materials.

Define carbonation - underwater inspection of bridge, Define Carbonation - ...

Define Carbonation - underwater inspection of bridge? Carbon dioxide is present in the air and attacks the concrete directly. It has the effect of destroying the normal passivi

Proctor test for GSB material, what is the procedure for gsb proctor test f...

what is the procedure for gsb proctor test for matrial sampling for lab density

State the coulomb earth pressure theory, A masonry wall with vertical back ...

A masonry wall with vertical back has a backfill 5 m behind it. The ground level is horizontal at the top and the ground water table is at ground level. Measured the horizontal pre

Aggregates, list the properties of aggregates

list the properties of aggregates

Define dupuit equations for unconfined aquifers, Define Dupuit Equations fo...

Define Dupuit Equations for Unconfined Aquifers Using natural log: Q = ΠK((h 2 ) 2 - (h 1 ) 2 )/ln(r 2 /r 1 )     Using log 10 : Q = K((h 2 ) 2 - (h 1 ) 2 )/((1,055)l

Analyse the state of stress, Analyse the state of stress: For the cros...

Analyse the state of stress: For the cross-section shown in above figure, let us take b = 100 mm, d = 300 mm and M = 9 × 10 7 N mm and Q = 18 × 10 4 N and analyse the state

Necessity of air valves in pressurized pipelines, Q. Necessity of air valve...

Q. Necessity of air valves in pressurized pipelines? Air valves are broadly categorized into two major types: single air valves and double air valves. Single air valve comprise

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd