Design and implement company network infrastructure, Project Management

Assignment Help:

Network Infrastructure: This project will require replacement of major networking components throughout the office. Virtualization will result in increased speed and reliability for employees.

Current business needs revolve around making our company more efficient. Efficiency is currently held back due to aging and obsolete network components. These issues are highlighted by specific problems employees are experiencing such as slow network connections, spotty wi fi coverage within office building, and the fact that the current server has reached maximum capacity, no longer allowing any further users to authenticate with it.

Opportunities with this project are summarized by increased efficiency for employees which will result in greater productivity. These upgrades, if met with a successful implementation plan should translate to increased satisfaction with our customer base and the capacity to add to that base, making the company more profitable in the long run.

Details of the proposed infrastructure upgrade are as follows. Changing of the current backbone wiring to fibre optic cable will improve data transfer speed capabilities. Replacing hubs with switches will allow each individual network card to transmit data simultaneously rather than waiting its turn. Improving wi-fi coverage through the use of higher spec routers will increase the coverage and significantly reduce the likelihood of dropped connections. By upgrading the current servers we will expand the capacity of our network, allowing more users to authenticate.

Problems:
Issues with implementing this project include the downtime endured while the network is upgraded. When the components are being replaced the communications within the company will be significantly hindered. Therefore it is imperative that we have backup systems in place so that we can still utilize effective communications.

Project Objective:
Design and implement a company-wide, $100,000.00 network infrastructure upgrade to increase company performance and revenue, to be completed by April 1st, 2012.

Project Milestones:
• Define requirements
• Retrieve resources
• Set up backup network
• Cable new network with devices
• Configure devices
• Maintain network for each succeeding year

Main Project Success Criteria:
• Employees and customers can effectively utilize all network functions without any limitations.
• There is almost no network downtime


Related Discussions:- Design and implement company network infrastructure

What are the disadvantages of critical path analysis, What are the disadvan...

What are the disadvantages of critical path analysis? Disadvantages of critical path analysis (CPA): a. Supposes a trade off among time and money but most staff cost coul

Value engineering, Value Engineering Value Engineering is not a program...

Value Engineering Value Engineering is not a program but a process. It is a systematic method used to improve the "value" of the goods or the products and services through exam

Span of management-managerial function of organizing, Span of management ...

Span of management Span of management refers to the number of subordinates who directly report to one superior. If a manager has too many subordinates then his span is wide and

Risk process , Risk Process  An organisation faces many risk related is...

Risk Process  An organisation faces many risk related issues. To mitigate those risks we have risk management techniques. These steps assist an organisation to mitigate risk an

Estimation Activities in Project Management , i want some on in expert in I...

i want some on in expert in IT project management and follow exactly and carefully the structure sheet.

Verification and validation process, Verification is the process by which o...

Verification is the process by which one can ensure that a model is performing as expected or intended. The process of verification is a challenging one for the project concerned a

Organisational competences and core competences, Explain the relationship b...

Explain the relationship between organisational competences and decisions relating to the contracting out of activities. Organisational competences A competence is an mehod

What are necessary features of the earned value management, What are the ne...

What are the necessary features of the Earned Value Management? Necessary features of EVM systems: a. A quantified project plan which identifies work or activities to be

Directing-process management, Directing (leading) This is the function ...

Directing (leading) This is the function concerned with influencing organizational members to carry out their assigned roles and activities. This function includes motivation,

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd