Design and implement company network infrastructure, Project Management

Assignment Help:

Network Infrastructure: This project will require replacement of major networking components throughout the office. Virtualization will result in increased speed and reliability for employees.

Current business needs revolve around making our company more efficient. Efficiency is currently held back due to aging and obsolete network components. These issues are highlighted by specific problems employees are experiencing such as slow network connections, spotty wi fi coverage within office building, and the fact that the current server has reached maximum capacity, no longer allowing any further users to authenticate with it.

Opportunities with this project are summarized by increased efficiency for employees which will result in greater productivity. These upgrades, if met with a successful implementation plan should translate to increased satisfaction with our customer base and the capacity to add to that base, making the company more profitable in the long run.

Details of the proposed infrastructure upgrade are as follows. Changing of the current backbone wiring to fibre optic cable will improve data transfer speed capabilities. Replacing hubs with switches will allow each individual network card to transmit data simultaneously rather than waiting its turn. Improving wi-fi coverage through the use of higher spec routers will increase the coverage and significantly reduce the likelihood of dropped connections. By upgrading the current servers we will expand the capacity of our network, allowing more users to authenticate.

Problems:
Issues with implementing this project include the downtime endured while the network is upgraded. When the components are being replaced the communications within the company will be significantly hindered. Therefore it is imperative that we have backup systems in place so that we can still utilize effective communications.

Project Objective:
Design and implement a company-wide, $100,000.00 network infrastructure upgrade to increase company performance and revenue, to be completed by April 1st, 2012.

Project Milestones:
• Define requirements
• Retrieve resources
• Set up backup network
• Cable new network with devices
• Configure devices
• Maintain network for each succeeding year

Main Project Success Criteria:
• Employees and customers can effectively utilize all network functions without any limitations.
• There is almost no network downtime


Related Discussions:- Design and implement company network infrastructure

Project risk, Identifying Project Risk  Risk identification is a proces...

Identifying Project Risk  Risk identification is a process which determines the types of risks that have potential impact on a project. The risk identification is an ongoing pr

Develop a integrated management project, You are not expected to submit a f...

You are not expected to submit a formal proposal. However, you will be able to access Subject Tutors via HenleyConnect and you may seek feedback from them as to the suitability and

Describe incremental approach to testing by unit test, Describe the increme...

Describe the incremental approach to testing represented by the orderly unit (module) test. Unit (module) test: Along with the incremental approach to testing, every unit

Disadvantages of product layout - high overhead charges, Disadvantages of P...

Disadvantages of Product Layout - High Overhead charges Due to heavy investment, the overhead fixed charges also tend to be high. A decline in demand for the product will rend

Housekeeping, what is the thumb rule to calculate the housekeeping manpower...

what is the thumb rule to calculate the housekeeping manpower requirement in office

Determine the supporting project activities for estimate, Describe differen...

Describe different types of supporting project activities for estimating. Estimate the given supporting project activities are as follows: 1.    Project management 2.    Team lea

Discuss the project management knowledge areas, Question: (a) Project ...

Question: (a) Project Integration Management refers to the integration of the nine knowledge areas and project phases involved in coordinating project activities to ensure th

How do i best control cost, Q. How do I best control cost? Several peop...

Q. How do I best control cost? Several people think that they are controlling cost when they approve invoices or sign cheques. In fact the cost is already long since committed

What types of errors disclosed in trial balance, What types of errors discl...

What types of errors disclosed in Trial Balance? A Trial Balance discloses the given types of errors as illustrated follows: a. An item posted two times. b. A mistake int

Layout planning and analysis, Layout Planning and Analysis Designing a...

Layout Planning and Analysis Designing and installing a layout for the first time and subsequent revision may be looked after by the. Engineering or planning department. Not i

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd