Design and implement company network infrastructure, Project Management

Assignment Help:

Network Infrastructure: This project will require replacement of major networking components throughout the office. Virtualization will result in increased speed and reliability for employees.

Current business needs revolve around making our company more efficient. Efficiency is currently held back due to aging and obsolete network components. These issues are highlighted by specific problems employees are experiencing such as slow network connections, spotty wi fi coverage within office building, and the fact that the current server has reached maximum capacity, no longer allowing any further users to authenticate with it.

Opportunities with this project are summarized by increased efficiency for employees which will result in greater productivity. These upgrades, if met with a successful implementation plan should translate to increased satisfaction with our customer base and the capacity to add to that base, making the company more profitable in the long run.

Details of the proposed infrastructure upgrade are as follows. Changing of the current backbone wiring to fibre optic cable will improve data transfer speed capabilities. Replacing hubs with switches will allow each individual network card to transmit data simultaneously rather than waiting its turn. Improving wi-fi coverage through the use of higher spec routers will increase the coverage and significantly reduce the likelihood of dropped connections. By upgrading the current servers we will expand the capacity of our network, allowing more users to authenticate.

Problems:
Issues with implementing this project include the downtime endured while the network is upgraded. When the components are being replaced the communications within the company will be significantly hindered. Therefore it is imperative that we have backup systems in place so that we can still utilize effective communications.

Project Objective:
Design and implement a company-wide, $100,000.00 network infrastructure upgrade to increase company performance and revenue, to be completed by April 1st, 2012.

Project Milestones:
• Define requirements
• Retrieve resources
• Set up backup network
• Cable new network with devices
• Configure devices
• Maintain network for each succeeding year

Main Project Success Criteria:
• Employees and customers can effectively utilize all network functions without any limitations.
• There is almost no network downtime


Related Discussions:- Design and implement company network infrastructure

What are the examples of conformance management systems, What are the examp...

What are the examples of conformance management systems? Examples of conformance management systems: a. Staff training b. Specific instructions communicated c. Ordinar

Functional requirements for an exhibition management system, Question: ...

Question: (a) Consider the following quality goals and provide a way to make the goal more tangible such that it can be easily verified: i. Software should be user friendl

Strategic internatic international business management, 1. Identify a poten...

1. Identify a potential target market for BNP Paribas’ retail banking’s future international expansion strategy

How to measures defect removal efficiency for the product, Number of post-r...

Number of post-release defects (found by clients in field operation), categorized by level of severity Ratio of defects found internally prior to release (by inspections and tes

LIne balancing, Q3. What do you understand by “line balancing”? What happen...

Q3. What do you understand by “line balancing”? What happens if balance doesn’t exist?

Project management cycle, It is essential that you study the list below to ...

It is essential that you study the list below to ensure that you understand the terminology used in assignment and examination questions. The successful outcome of your assessment

Key stages to conduct a training needs assessment, Question 1: (a) What...

Question 1: (a) What is a TNA, and why is it conducted? (b) What are the key stages to conduct a Training Needs Assessment? (c) Having undertaken an organization-wide TNA

Perform a status assessment of the project iteration, Perform a status asse...

Perform a status assessment of the first project iteration (IIP1). DO NOT GENERALISE. Assess each activity separately and specifically against the intended outcome stated in the it

Critical path method, HyperAV is a Manchester based company which is a reta...

HyperAV is a Manchester based company which is a retailer of home cinema equipment. They sell a variety of products including speakers, amplifiers, Blu-ray/DVD players and cables.

Information software, what is project management information software

what is project management information software

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd