Design and implement company network infrastructure, Project Management

Assignment Help:

Network Infrastructure: This project will require replacement of major networking components throughout the office. Virtualization will result in increased speed and reliability for employees.

Current business needs revolve around making our company more efficient. Efficiency is currently held back due to aging and obsolete network components. These issues are highlighted by specific problems employees are experiencing such as slow network connections, spotty wi fi coverage within office building, and the fact that the current server has reached maximum capacity, no longer allowing any further users to authenticate with it.

Opportunities with this project are summarized by increased efficiency for employees which will result in greater productivity. These upgrades, if met with a successful implementation plan should translate to increased satisfaction with our customer base and the capacity to add to that base, making the company more profitable in the long run.

Details of the proposed infrastructure upgrade are as follows. Changing of the current backbone wiring to fibre optic cable will improve data transfer speed capabilities. Replacing hubs with switches will allow each individual network card to transmit data simultaneously rather than waiting its turn. Improving wi-fi coverage through the use of higher spec routers will increase the coverage and significantly reduce the likelihood of dropped connections. By upgrading the current servers we will expand the capacity of our network, allowing more users to authenticate.

Problems:
Issues with implementing this project include the downtime endured while the network is upgraded. When the components are being replaced the communications within the company will be significantly hindered. Therefore it is imperative that we have backup systems in place so that we can still utilize effective communications.

Project Objective:
Design and implement a company-wide, $100,000.00 network infrastructure upgrade to increase company performance and revenue, to be completed by April 1st, 2012.

Project Milestones:
• Define requirements
• Retrieve resources
• Set up backup network
• Cable new network with devices
• Configure devices
• Maintain network for each succeeding year

Main Project Success Criteria:
• Employees and customers can effectively utilize all network functions without any limitations.
• There is almost no network downtime


Related Discussions:- Design and implement company network infrastructure

The three flows in Supply Chain Management, Hi can you please provide info ...

Hi can you please provide info on referencing material and more detailed info on the three flows in supply chain management?

#title.Discountingw., what is the principle of discounting and what issues ...

what is the principle of discounting and what issues are critical in this process

How important are the stakeholders, Q. How important are the stakeholders? ...

Q. How important are the stakeholders? The most significant stakeholder of course is your client or customer. Conversely that perhaps in excess of one person that the sponsor a

Line balancing methods, Line Balancing Methods  The various line balan...

Line Balancing Methods  The various line balancing methods or techniques used are: Heuristic Methods Linear Programming Kilbride and waste Methods

Benefits of having a project and programme support office, What are the ben...

What are the benefits to an organisation of having a Project and Programme support office? The major advantages to an organisation by having a Project and Programme support off

Project management value initiative, Project Management Value Initiative ...

Project Management Value Initiative The project management initiative program is a six step process which is designed to bring about a measurement team from the introduction to

Small project, Q. If I only have a small project, do I really need to bothe...

Q. If I only have a small project, do I really need to bother with all of that? In any of project of any size all of these ten attributes requires some degree of attention. But

Business negotiation, Tony Taxpayer''s return case study. Question is to ap...

Tony Taxpayer''s return case study. Question is to apply general attribution theory to analyze and explain each parties attitude and conclusions.

Need for safety, Need for safety 1. Cost Saving: Two type  of costs ...

Need for safety 1. Cost Saving: Two type  of costs  are incurred by the management  when an accident  occurs. There are the  direct  costs in the  form  of compensation paya

Execution of the project, The researcher should see that the project is exe...

The researcher should see that the project is executed in a systematic manner and in time. If the survey is to be conducted by means of structured questionnaires data can be rea

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd