Design and implement company network infrastructure, Project Management

Assignment Help:

Network Infrastructure: This project will require replacement of major networking components throughout the office. Virtualization will result in increased speed and reliability for employees.

Current business needs revolve around making our company more efficient. Efficiency is currently held back due to aging and obsolete network components. These issues are highlighted by specific problems employees are experiencing such as slow network connections, spotty wi fi coverage within office building, and the fact that the current server has reached maximum capacity, no longer allowing any further users to authenticate with it.

Opportunities with this project are summarized by increased efficiency for employees which will result in greater productivity. These upgrades, if met with a successful implementation plan should translate to increased satisfaction with our customer base and the capacity to add to that base, making the company more profitable in the long run.

Details of the proposed infrastructure upgrade are as follows. Changing of the current backbone wiring to fibre optic cable will improve data transfer speed capabilities. Replacing hubs with switches will allow each individual network card to transmit data simultaneously rather than waiting its turn. Improving wi-fi coverage through the use of higher spec routers will increase the coverage and significantly reduce the likelihood of dropped connections. By upgrading the current servers we will expand the capacity of our network, allowing more users to authenticate.

Problems:
Issues with implementing this project include the downtime endured while the network is upgraded. When the components are being replaced the communications within the company will be significantly hindered. Therefore it is imperative that we have backup systems in place so that we can still utilize effective communications.

Project Objective:
Design and implement a company-wide, $100,000.00 network infrastructure upgrade to increase company performance and revenue, to be completed by April 1st, 2012.

Project Milestones:
• Define requirements
• Retrieve resources
• Set up backup network
• Cable new network with devices
• Configure devices
• Maintain network for each succeeding year

Main Project Success Criteria:
• Employees and customers can effectively utilize all network functions without any limitations.
• There is almost no network downtime


Related Discussions:- Design and implement company network infrastructure

Structure of people management system, Question 1: Explain the force Co...

Question 1: Explain the force Content and Structure of People Management System Explanation of structure Explanation of content Balance between content and struct

Network, charateristics of a good network

charateristics of a good network

Policies-planning function, Policies are general statements to guide...

Policies are general statements to guide subordinate thinking in the decision making process. policies define the area within which a subordinate may make a decision. In

Project organisational structures, Organisational Structures The projec...

Organisational Structures The project organisational structure facilitates coordination and implementation of project activities. It should be designed to include the essential

Basic control elements in generic projects, QUESTION Implementation sh...

QUESTION Implementation should focus on the achievement of agreed outcomes, so that if a problem is encountered with the plan, other courses of action will be employed. Wha

Process of packaging and labeling of the product, Q. Process of Packaging a...

Q. Process of Packaging and labeling of the product? Packaging of biscuits involves both the primary and secondary packets. These primary package should be laminated paper whi

Usage of risk breakdown structure , Usage of RBS  Once an organisation ...

Usage of RBS  Once an organisation defines a Risk Breakdown Structure (RBS), then it can be used in a number of ways. These RBS is relevant across the project and helps in the

Use of operational approach in development process, Q. Use of Operational a...

Q. Use of Operational approach in development process? It has been defined as the application of scientific methods, technology and tools to operation of system with optimum s

Analysis of line balancing problems, Analysis of Line Balancing Problems ...

Analysis of Line Balancing Problems The procedure involves the followings steps: Determine the number of work stations and time available at each work stations.

History of iso, ISO 9000 series of standards on quality system was formu...

ISO 9000 series of standards on quality system was formulated by international organization for standards in order to meet the requirements of internationally uniform q

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd