Design and implement company network infrastructure, Project Management

Assignment Help:

Network Infrastructure: This project will require replacement of major networking components throughout the office. Virtualization will result in increased speed and reliability for employees.

Current business needs revolve around making our company more efficient. Efficiency is currently held back due to aging and obsolete network components. These issues are highlighted by specific problems employees are experiencing such as slow network connections, spotty wi fi coverage within office building, and the fact that the current server has reached maximum capacity, no longer allowing any further users to authenticate with it.

Opportunities with this project are summarized by increased efficiency for employees which will result in greater productivity. These upgrades, if met with a successful implementation plan should translate to increased satisfaction with our customer base and the capacity to add to that base, making the company more profitable in the long run.

Details of the proposed infrastructure upgrade are as follows. Changing of the current backbone wiring to fibre optic cable will improve data transfer speed capabilities. Replacing hubs with switches will allow each individual network card to transmit data simultaneously rather than waiting its turn. Improving wi-fi coverage through the use of higher spec routers will increase the coverage and significantly reduce the likelihood of dropped connections. By upgrading the current servers we will expand the capacity of our network, allowing more users to authenticate.

Problems:
Issues with implementing this project include the downtime endured while the network is upgraded. When the components are being replaced the communications within the company will be significantly hindered. Therefore it is imperative that we have backup systems in place so that we can still utilize effective communications.

Project Objective:
Design and implement a company-wide, $100,000.00 network infrastructure upgrade to increase company performance and revenue, to be completed by April 1st, 2012.

Project Milestones:
• Define requirements
• Retrieve resources
• Set up backup network
• Cable new network with devices
• Configure devices
• Maintain network for each succeeding year

Main Project Success Criteria:
• Employees and customers can effectively utilize all network functions without any limitations.
• There is almost no network downtime


Related Discussions:- Design and implement company network infrastructure

Discuss importance of value management in project life cycle, Question: ...

Question: (a) Past projects have shown that cost escalation is a common phenomenon with respect to the amount by which actual costs increases overrun the initial estimated cos

Contract management, Contract Management  There are many things involve...

Contract Management  There are many things involved in a project risk policy. One of them is contract management. Various kinds of contract can have an impact on the success of

Explain the new performance management system, Question 1: (a) How does...

Question 1: (a) How does Training differ from Development? (b) Elaborate on the different training methods, highlighting their relative advantages and disadvantages. Ques

Estimation Activities in Project Management , i want some on in expert in I...

i want some on in expert in IT project management and follow exactly and carefully the structure sheet.

Design defect, However proving a design defect can be difficult. Some of th...

However proving a design defect can be difficult. Some of the factors used by the jury to asses s whether a product design is defective and unreasonably dangerous are: 1.The utili

Techniques of project management tools, Over the years, E has had a number ...

Over the years, E has had a number of business successes in the building trade and property development. Her latest venture is to build a hotel in YX town. E has already gained the

Greater possibility of space utilization, Greater Possibility of Space Util...

Greater Possibility of Space Utilization There will be a greater productive utilization of the floor area under this type of layout. Due to lesser need for temporary storage o

What are the disadvantage of top-down centralised approaches, What are the ...

What are the disadvantages of top-down centralised approaches? The disadvantages top-down centralised approaches: Project budgets can be imposed by using top-down which is c

Quality measurement procedure - tqm techniques, Quality Measurement Procedu...

Quality Measurement Procedure: Quality as a strategic issue implies (i) acceptance of the importance of customer requirements throughout the organization,  (ii) the identifica

Identify characteristics of effective project team members, Question 1: ...

Question 1: (a) Identify and explain the major roles of a Project Manager with illustrations where necessary. (b) Identify and Explain the different types of Project Organ

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd