VRU, HP and LP Flare systems are used to collect normal and emergency releases from the process and recycle or dispose of them in a safe manner.

The HP Flare system is responsible for collecting and disposing of process streams resulting from manual vents, emergency reliefs or upset conditions from diverse equipment throughout the facility.

Fluid from the flare header enters into the HP Flare Knockout Drum, where liquid and vapour are separated. The vapour flows to the HP Flare Stack where the HC gas is combusted into CO2 and H2O. The liquid from HP Flare KO Drum is sent to the Slop Tanks. Both the HP flare header into the drum and the line from the drum to the stack are sloped downwards towards the drum to prevent condensed liquid from accumulating in the flare header or entering the flare stack.

The VRU system is provided for all recoverable tank vapours and low pressure process vapours. Usually this includes vapours from the closed HC Drain Vessels, Evaporator Package, Surge Tank, Skim Tank, De-Oiled Water Tank, IGF Package, Desand Tank, Slop Tank, Dilbit Tank, Off-Spec Tank, Diluent Tank and Slop Treater Package (if any). The VRU Package increases the pressure of recovered vapours in order to mix them with the other vapours feeding the Mixed Fuel Gas Separator. (The description may be different in various SAGD plants). The VRU package may contain a VRU Suction Cooler, Scrubber, Scrubber Pumps, VRU Compressors, Compressor Cooler and Discharge Separator.

The vapour from VRU header flows to the cooler to cool down the vapour and collecting condensed liquids prior to compression. The liquid is pumped out to Slop Tank and vapour is sent to the compressor. The discharge gas flows to the Discharge Cooler and Separator (three phase) and the overhead gas is routed to the FG system and HC liquids are sent to Slop Tank.

The LP Flare Header collects gas from process sources that cannot withstand backpressure in excess of 3.45 kPag. Normally these vapours are recovered by the VRU but should the VRU System shut down or lack sufficient capacity for any reason, excess vapours are collected in the LP Flare header and sent to the LP KO Drum, where liquid and vapour are separated. Vapours flows to LP Flare Stack and liquids are removed from the LP KO Drum and sent to the Surge Tank or Slop Tank.


Related Discussions:- Define flare and vru system

Control of the qr engine, We provide you with some information about the co...

We provide you with some information about the control of the QR Instability Problem Cascaded P Control   PLEASE THE TASK We would like you to do an indepth

Fluid Question, If water is pumped from a pristine stream and piped to a st...

If water is pumped from a pristine stream and piped to a storage tank installed on a tower above the facility, a) What is the minimum dimension for "X" to achieve the required pres

Cam profile, sketch and discuss the uses and application of the following t...

sketch and discuss the uses and application of the following types of cam follower;knife edge,roller and flat ended.

Determine fluid pressure, 1 A hydraulic pump generates 240W and supplies hy...

1 A hydraulic pump generates 240W and supplies hydraulic fluid at a rate of 5.1l/min to a linear actuator which has a bore size of 50 mm and a double piston rod diameter of 20mm. I

Storage and handling of epoxy powder, Q. Storage and Handling of Epoxy Powd...

Q. Storage and Handling of Epoxy Powder? Coating materials shall be stored, handled and applied in strict accordance with procedures as outlined by the coating manufacturer, ex

LPP, (Hint Minimization problem -min X1 + X2, s.t. 2X1 + X2 = 12, X1 + 6X2 ...

(Hint Minimization problem -min X1 + X2, s.t. 2X1 + X2 = 12, X1 + 6X2 = 24, 5X1 + 8X2 = 24; X1, X2 = 0).

What is the spindle and drill, What is the spindle and drill The spindl...

What is the spindle and drill The spindle and drill head assembly the taper hole can be create on radial drilling machine with some special attachment likewise quill(The spindl

Design requirements, A steel member supported by a tie bar has a load of 15...

A steel member supported by a tie bar has a load of 15 000 lbs on it. If the force on the steel member of 1.2 in 2 cross section is 14,180 lbs and the force on the tie bar of diam

Vicker''s hardness test, V icke r ' s Hardness Test: This test is ...

V icke r ' s Hardness Test: This test is alike the Brinell test but uses different indenter. A square based pyramid of cone angle 136 ° is used. The applied load can be 5,

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd