Decision tree approach, Operation Research

Assignment Help:

Question:

Spencerville Products is expanding its operations west of the Mississippi.  Its first step is to build a manufacturing facility in Denver to satisfy demand on the West Coast.  Spencerville has an option to build either a large facility that has an annual output of 500,000 units per year or a smaller facility with an output of 250,000 units per year.  It must build one of these two facilities - it does not have any other options.

The expected demand for the company's products is shown as either high or moderate in the table below:

Demand Level                        Annual Demand (units/year)                       Probability

High                                        450,000                                                    0.4

Moderate                                 150,000                                                    0.6

The small facility has a profit of $5.00 per unit.  The large facility has a profit of $4.00/unit.

a) What size facility should Spencerville Products build based on expected values and using a decision tree approach?  You must also provide the decision tree using the appropriate decision tree symbols.

b)  Suppose that the company is not certain about the 450,000 projection for the High Demand scenario.  It could be higher than this projection.  How sensitive is the selection in a) to the High Demand projection.  In other words, at what annual demand for the High Demand scenario would the company be indifferent between the two size facilities?

 


Related Discussions:- Decision tree approach

Optimization, Find a minimum cost spanning arborescence rooted,

Find a minimum cost spanning arborescence rooted,

Solve the problem using simplex method, #question. A paper mill produces tw...

#question. A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grad

Solve the following Linear Programming Problem using Simple , Solve the fol...

Solve the following Linear Programming Problem using Simple method. Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = 2

Scope, Scope of operations research

Scope of operations research

Scientific research, Scientific research is building of knowledge throug...

Scientific research is building of knowledge through collection of empirically verifiable facts. The term verifiable here means which can be checked by others for accuracy

Experimental method, In this method variables beings studied are contro...

In this method variables beings studied are controlled by the investigator. In other the effect of one variable is observed while other relevant variables are held constant

LPP, A paper mill produces two grades of paper viz., X and Y. Because of ra...

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

Dina, Construct a two-variable LP model that: · Maximizes Z; · ...

Construct a two-variable LP model that: · Maximizes Z; · All coefficients in the objective function are greater than 500; · Includes at least 5 constraints;

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd