Data copy operations, Electrical Engineering

Assignment Help:

Data Copy Operations

Instructions which  are used  to copy data from  one location to another  location kept in  this category. The location from  which data  is copied  is called source and the location  to which  data is  copied  destination. During  this copy  operation the  previous  contents of destination are overwritten without  modifying  the content s of the source

Important : No flags  are modified  by any  of the data copy  operation.

These instructions are used to copy data.

a.From  one register to another  register.

b.8/ 16 bit data directly  from the  instruction to any  register/ register pair.

c.Data from any register to memory.

d.Data from  memory  to any  register.


Related Discussions:- Data copy operations

Automotive wiring harness, what are the design consideration for electrical...

what are the design consideration for electrical wiring harness routing

Illustrate the construction and working of thermistor, Illustrate the const...

Illustrate the construction and working of:- (i) Pressure Thermometer (ii) Selective Radiation Pyrometer (iii) Thermistor (iv) Laws of Thermocouple

Energy stored in a magnetic field , Energy stored in a magnetic field ...

Energy stored in a magnetic field Consider a circuit consisting of a voltage supply,  switch,  resistor  and  a  coil  of  N turns wound on a toroid of length l, all in series

Describe the phasor equations, Q. Describe the following phasor equations r...

Q. Describe the following phasor equations represented in the time domain: (a) ¯ E = K1e-¯ γz (b) ¯ E = K2e ¯ γz where z is the space coordinate, K1 and K2 are constants,

What is meant by a bus, A bus is a collection of conducting lines that carr...

A bus is a collection of conducting lines that carrier's data, address, & control signals. A bus is two or many wire communication technique. A bus which communicate among two

A Capacitor-Fed, A Capacitor-Fed, Voltage-Step-Down, Single-Phase, Non-Isol...

A Capacitor-Fed, Voltage-Step-Down, Single-Phase, Non-Isolated Rectifier

Activities to preparing long-term plans, Activities to Preparing Long-term ...

Activities to Preparing Long-term Plans 1. Data collection regarding existing loads, forecast of expected loads, operating conditions, and etc. from Grid substation up to cons

Semiconductors, Why do potential barriers breaks when a breakdown voltage i...

Why do potential barriers breaks when a breakdown voltage is application to semiconductor

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd