Cross drainage works, Mechanical Engineering

Assignment Help:

Cross Drainage Works:

Culverts

A large number of culverts are needed for taking care of the streams crossing the railway lines. The culverts can be one of the following types:

(a) Masonry arch

(b) Brick arch

(c) RCC slab

(d) RCC box

(e) RCC pipes

Bridges

Bridges are provided across rivers crossing the railway line. The types of bridges used are:

(a) RCC slab

(b) RCC T-beam and slab

(c) Pre-stressed Concrete beam

(d) Steel plate girders

(e) Steel truss girders (for long spans)

The foundations are either open foundations or well foundations (for long spans). The piers and abutments are constructed in masonry, mass concrete or RCC.

The waterway for the bridges is fixed carefully after calculating the maximum possible discharge. Adequate clearance is provided over the highest flood level upto the bearings to take care of floating trees.


Related Discussions:- Cross drainage works

Positive material identification testing, Q. Positive Material Identificati...

Q. Positive Material Identification Testing? Any physical evaluation or a test of a material to confirm that the material which has been or will be placed into service is consi

Magnetic alloy steels, Magnetic Alloy Steels: These steels are divide...

Magnetic Alloy Steels: These steels are divided into two sets. Such which retain their magnetism and that which do not. The steels which retain their magnetism are termed as

Plate clutch for warpage-clutch jerking, Plate clutch for warpage : Place ...

Plate clutch for warpage : Place plate clutch on surface plate and check for warpage. Ensure that 0.20 mm feeler gauge does not slide freely.

Conjugate Cams:, I require design procedure of Conjugate Cams

I require design procedure of Conjugate Cams

Form tool design, How to design a flat form tool when the form of the workp...

How to design a flat form tool when the form of the workpiece is given.

Calculate the cutting speed in drilling operation, Calculate the Cutting Sp...

Calculate the Cutting Speed in Drilling Operation Calculate the cutting speed if a drill of 0.04 m dia is operated at a speed of 250 rpm. Solution D = 0.04 m N = 25

Consider some publications of the bureau of standards, Consider some public...

Consider some publications of the Bureau of Standards. The following publications of the Bureau of Standards shall be read along with this section of footings. a. IS 456 in

Thermal Stresses in Tapered Section, A rigidly fixed circular bar 1.75mm lo...

A rigidly fixed circular bar 1.75mm long uniformly tapers from 125mm dia. at 1 end to 100mm dia. at other end. If the max. stress in the bar is not to exceed 108MPa. Find the tempe

Determine the thermal conductivity of the rod, One end of a rod, 35 mm in d...

One end of a rod, 35 mm in diameter, is diped into a furnace with the other end projecting in the outer air. After the steady state is obtained, the temperature of the rod is evalu

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd