Q. Corrosion protection of lifting anchors in precast concrete?
Corrosion of lifting anchors in precast concrete units has to be prevented since the corroded lifting units cause an increase in steel volume leading to spalling of nearby surface concrete. Subsequently steel reinforcement of the precast concrete units can be exposed and this in turns results in the corrosion of steel reinforcement and reduction in the load carrying capacity of precast units. To combat the potential corrosion problem, lifting anchors could be covered with a layer of mortar to hide them from possible external corrosion agents. Otherwise galvanized or stainless steel lifting anchors can be considered in aggressive environment.
I need q quote my homework no 2
Road Drainage and Maintenance: The life of a road depends upon how well and quickly the water is drained away from its various components. Similarly, regular and periodic insp
Find the normal stress: Figure 1 shows the projection of a rectangular prism ABCD, formed by adhesive bonding of two triangular prisms ABC and ACD. The state of stress in the
Question What is load transfer mechanism for paving blocks in pedestrian footway? Answer In Hong Kong, footway is as a rule designed with paving slabs or interlocking b
Define the Thiem Equations for Confined Aquifers Using natural log: Q = 2ΠKm(h 2 - h 1 )/ln(r 2 /r 1 ) m = aquifer thickness (ft) Using log 10 : Q = 2Km(h 2 - h
what are the advantages of linear programming?
what type of ethics is environmentel ethics
Determine the problems formed while design of pre-stressed concrete Two types of problems are encountered by the engineer engaged in the design of pre-stressed concrete membe
Sub-base for concrete carriageway - non-strength provider Essentially sub-base for a concrete carriageway is provided for the below reasons: (i) It provides aneven and smo
Q. Computation of Settlement? The settlement in any soil mass under an applied stress is given by s = s i + s c + s s where, S = total settlement, S i = imm
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd