Q. Corrosion protection of lifting anchors in precast concrete?

Corrosion of lifting anchors in precast concrete units has to be prevented since the corroded lifting units cause an increase in steel volume leading to spalling of nearby surface concrete. Subsequently steel reinforcement of the precast concrete units can be exposed and this in turns results in the corrosion of steel reinforcement and reduction in the load carrying capacity of precast units. To combat the potential corrosion problem, lifting anchors could be covered with a layer of mortar to hide them from possible external corrosion agents. Otherwise galvanized or stainless steel lifting anchors can be considered in aggressive environment.


Related Discussions:- Corrosion protection of lifting anchors in precast concrete

Highway economics, What is highway economics and what are its main contents...

What is highway economics and what are its main contents to study ?

Physical classification of stones, Physical Classification Based on the...

Physical Classification Based on the structure, the rocks can be classified as following: Stratified rocks Un -stratified rocks A.   Stratified Rocks: These ro

Vectors, applications of vectors

applications of vectors

Joint filler in concrete expansion joints - a must, Joint filler in concret...

Joint filler in concrete expansion joints - a must?? Presence of joint filler is required to the proper functioning of concrete joints however some may doubt its value. For a c

Acetylene gas cylinder for gas welding, Q. Acetylene gas cylinder for gas w...

Q. Acetylene gas cylinder for gas welding to be erected in upright position Acetylene gas is normally used for gas welding due to its simplicity in production and transportati

Hydraulics and Hydrology , A flow rate of 200 gpm of oil with u=1.5 x 10-3 ...

A flow rate of 200 gpm of oil with u=1.5 x 10-3 lb-sec/ft2 and p=1.7 slug/ft3 occurs in a 4-in pipe. Determine the Reynolds number. Classify the flow as laminar or turbulent. What

Bulking of sand, what is the permissible limit of sand

what is the permissible limit of sand

Disparities between regular precast and pipe jacking, Question What are...

Question What are main disparities in design between regular precast concrete pipes and pipes used for pipe jacking ? Answer For pipes used for pipe jacking, they h

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd