Construction of passenger terminal building, Civil Engineering

Assignment Help:

Construction of Passenger Terminal Building:

There are various concepts in planning and constructing passenger terminal buildings. These are :

(a)        The international and domestic traffic is segregated in separate buildings, or they are housed in one building with clear separation.

(b)       The arrival and departure are handled at ground level and passengers either walk to the aircraft or are transported in buses and use stairs.

(c)        The arrival and departure are handled at two levels. Passengers use aerobridges to board or alight from aircraft.

The terminal building should be functional in design, with no conflict of movement.


Related Discussions:- Construction of passenger terminal building

Millennium mills redevelopment project assignment, Millennium mills redevel...

Millennium mills redevelopment project assignment in group Presentation

Surveying, Distance ABC was measured with a 30m. Chain tested and found to ...

Distance ABC was measured with a 30m. Chain tested and found to be correct in the beginning of the work .after measuring AB=1.2 km chain was found to be 10 cm. To long chaining was

Dense bituminous macadam, Dense Bituminous Macadam: A Dense Bituminou...

Dense Bituminous Macadam: A Dense Bituminous Macadam (DBM) is a close-graded premix material having a voids content of 5-10 per cent. Two gradings are normally adopted :

Designing level of landings in piers, Question What is designing leve...

Question What is designing level of landings in piers? Answer Landings are designed as resting place for passengers throughout berthing and deserting of vessels. I

Test for determination of shear modulus, Test for determination of Shear Mo...

Test for determination of Shear Modulus Conditioning load : Bearings shall be preloaded with maximum horizontal load Htest (with Ntest or vertical load held constant) and un

Open foundation, what is savest foundation in the soft sanded earth

what is savest foundation in the soft sanded earth

Explain gap survey and adjustment of gap, Q. Explain Gap Survey and adjustm...

Q. Explain Gap Survey and adjustment of Gap? Gap survey and rectification of gaps is to be carried out, in stretches where track develops excessive creep jammed joints, sun kin

Syphon, what is the design of syphon

what is the design of syphon

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd