Connection of Shunt Capacitors at 11 kV Substations
11 kV automatic switched capacitor banks are installed on bus of 33 or 66 kV substations. This has the facility that the required number of capacitor banks could be put in or out of the service depending on the requirement.
The maintenance of voltage at customer premises inside statutory limits at all loads is the responsibility of utility. Series capacitors begin negative reactance within the line and improve the voltage that in turn also decreases the power losses. The major benefits of series capacitors is in which the quantum of compensation is highly responsive to load current and series capacitors could be remain in the circuit during the complete load cycle, without causing some adverse effect of over voltages, in during low load conditions.
Common Source Amplifier A common-source amplifier is one of three basic single-stage field-effect transistor abbreviated as FET amplifier topologies, commonly used as a volta
what happens when we apply DC supply to transformer primary
Discuss about signal distortion in optical waveguides Ans: The major reason for signal distortion within optical waveguide is dispersion. Dispersion of the transmitted
A signal stands for 0110 with positive logic in which low stands for 0 and high stands for 1. If negative logic (in which low stands for 1 and high stands for 0) is used, what digi
what is the purpose of superposition theorem
compensation techniques
what is speed governing frenqency control
What is extended data output RAM? EDO RAM: A slight modification to the DRAM structure changes the device in an EDO (extended data output) DRAM device. Inside the EDO memory, a
Q. What do you mean by Time consistent Busy Hour? (i) Busy Hour (ii) Peak Busy Hour (iv) Time consistent Busy Hour (v) Traffic intensity Ans: (i) Busy Hour: C
Ask question #Minimum 100 words accepteddelay line in cro#
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd