Concrete Mix Proportions

Concrete mix proportions should be chosen in such a way that concrete of adequate workability is obtained. Workability of concrete mix should be such that it can be compacted well using the available means of compaction. The recommended values of workability of concrete can be taken from IS  :  456-1978. Concrete should surround all the tendons and other reinforcement well and should fill the formwork space completely so that the maximum density is achieved. When concrete hardens, it should have the needed strength, durability and surface finish.

 


Related Discussions:- Concrete mix proportions

What is the role of sunfilter in building, QUESTION (a) Using an illu...

QUESTION (a) Using an illustration, describe what happens to sunrays when it passes through the atmosphere to reach the ground. (b) What is the role of a sunscreen/sunfil

Building Drawing, Illustrate by mean of single line drawing the difference ...

Illustrate by mean of single line drawing the difference between couple truss and couple close truss

Castellated beams – reasons for its widespread usage, Q. Explain about Cast...

Q. Explain about Castellated beams? Castellated beams refer to the type of beams which involve expanding a standard rolled steel section in such a way that a predetermined patt

Main principle of post-grouting for mini-piles, Question What is main p...

Question What is main principle of post-grouting for mini-piles? Answer During course of post-grouting , a tube with a hole at its base is lowered into pile and g

Shear and tensile strength, What is the difference between shear and tensil...

What is the difference between shear and tensile strength? Ans) Tensile Strength for a Bolt is explained by applying a Force along it long axis. Shear Strength for a Bolt is exp

Shear strength of concrete., why do we use effective depth ''d'' in calcula...

why do we use effective depth ''d'' in calculating the shear capacity of uncracked Concrete beam. If it is uncracked, why cant we use the full depth ''D''.

Water or hydraulic horsepower (whp), Water Or Hydraulic Horsepower (whp) ...

Water Or Hydraulic Horsepower (whp) The work performed by a pump is a function of the head added by the pump (h A ), the flow rate required (Q) and the mass of the fluid (accou

Monitoring state of reclamation, Question Geotechnical Instrumentation ...

Question Geotechnical Instrumentation is often employed for monitoring state of reclamation . From time to time two piezometers are installed inside same borehole. What is mai

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd