Conceptual engineering phase in project development, Mechanical Engineering

Assignment Help:

Q. Conceptual engineering phase?

During this phase, a conceptual engineering estimate will be prepared by Project Management with input from all disciplines.

Activities at this stage are primarily ‘Process Engineering' driven, with the other discipline providing support for process optimization purposes, leading to the development of the Design Basis Memorandum (DBM).

The deliverables for Mechanical Engineering normally include, but are not limited to, support for development of the following:

• Design Basis Memorandum (DBM) Input

• Plot plan

• Conceptual sketches

• Preliminary sizing and material selection

• Equipment layout sketches

• Conceptual studies

• Conceptual cost estimates

• Preliminary equipment list


Related Discussions:- Conceptual engineering phase in project development

Shear force and bending moment, Shear Force and Bending Moment: Shea ...

Shear Force and Bending Moment: Shea r Force (S.F.) Algebraic sum of all vertical forces at any section of beam to the right or left of the section is known as shear for

Estimate the machining time, Estimate the Machining Time A hollow work...

Estimate the Machining Time A hollow workpiece of 60 mm outside diameter and 150 mm length is held on a mandrel among centers and turned all over in 4 passes. If the approach

Complaints of engine starting by repairing of motorcycle , Complaints of En...

Complaints of Engine Starting: If there is a problem related to the starting of the bike, it can be due to mechanical as well as electrical reasons. The possible reasons could be

Compressive stress, Compressive Stress: The stress induced in a body, ...

Compressive Stress: The stress induced in a body, when subjected to two equal and opposite pushes as shown in figure (a) as a result of which there is an decrease in length

Define heat treatment and surface treatment processes, Heat Treatment and S...

Heat Treatment and Surface Treatment Processes Heat treatment processes are employed to improve of a work piece. The category includes the processes. Annealing, Normalizing,

Complete outer clutch lugs for deep cuts, Complete outer clutch lugs for de...

Complete outer clutch lugs for deep cuts: Visually check for any deep cuts formed on the outer complete clutch lugs.

Axis perpendicular to the vertical plane - square prism, Axis Perpendicular...

Axis Perpendicular to the Vertical Plane - square prism: Here a square prism, side of base 40 millimeter and axis 60 millimeter long is resting on the HP on its base along wit

Find cutting speed for prolonging tool life , Find Cutting Speed for Prolon...

Find Cutting Speed for Prolonging Tool Life A form tool machining at 24 m/minute requires re-sharpening after 30 minutes. What should be the cutting speed for prolonging tool

Weld defects, WELD DEFECTS The common defects encountered in submerged ar...

WELD DEFECTS The common defects encountered in submerged arc welding are: a. Slag inclusion b. Porosity c. Cracking of welds.   a). Slag Inclusion : Slag in

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd