Compute the power factor for zero voltage regulation, Electrical Engineering

Assignment Help:

A three - phase,wye - connected, 2500-kVA, 6600- V, 60-Hz turboalternator has a per-phase synchronous reactance and an armature resistance of 10.4 and 0.071 , respectively. Compute the power factor for zero voltage regulation on full load.


Related Discussions:- Compute the power factor for zero voltage regulation

Show silicon n-channel jfet, Q. Given that a silicon n-channel JFET has V P...

Q. Given that a silicon n-channel JFET has V P = 5 V and I DSS = 12 mA, check whether the device is operating in the ohmic or active region when v GS =-3.2 V and i D = 0.5 mA.

Find the largest current out, Q. Consider a BJT switch connected to the nex...

Q. Consider a BJT switch connected to the next stage, as shown in Figure, in which iout is likely to be negative when v out is high. Assume V CC = 5 V, R C = 1k, and the high r

Semiconductor diode, Semiconductor Diode: the semi conductor diode is ...

Semiconductor Diode: the semi conductor diode is formed by simply bringing n and p tripe material together (constructed from same base ge and si), at the instant the two mater

Auxiliary carry fla - registers, Auxiliary Carry Fla - Registers If ca...

Auxiliary Carry Fla - Registers If carry  is generated  from D 3   to D 4 in the accumulator after any arithmetical or logical  operations. Auxiliary  carry flag (AC) is set

State the principle of working of transformer, a) State the principle of wo...

a) State the principle of working of transformer. b) A 230/110 V, single-phase transformer takes an input of 350 volt-amperes at no load while working at rated voltage. The core

Cro, why is delay line used in vertical deflection on systems of CRO?

why is delay line used in vertical deflection on systems of CRO?

What are the different types of distributing frames, Q. What are the differ...

Q. What are the different types of distributing frames used in exchanges? Ans: Different distribution  frames  used  in  exchange  are  displayed in  figure.  Each subscribe

Points of verification, Points of Verification of Connection i) Phase...

Points of Verification of Connection i) Phase association ii) CT polarity iii) VT polarity iv) Phase angles v)  Phase sequence vi) System conditions - unbalanc

Crossmagnetisation, what is crossmagnetisation in dc generator

what is crossmagnetisation in dc generator

What is interrupt service routine, What is interrupt service routine? I...

What is interrupt service routine? Interrupt means to break the sequence of operation. Whereas the CPU is executing a program an interrupt breaks the normal sequence of impleme

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd