Closing and opening of expansion joints and contraction join, Civil Engineering

Assignment Help:

Question

In case of for unreinforced concrete carriageway, what will succession of closing and opening of expansion joints and contraction joints?


Answer

Take a case to illustrate sequence of closing and opening of joints. For example, an unreinforced concrete carriageway is constructed in winter. While temperature rises in following summer, section between expansion joints will expand as an entire single element resulting in closure of expansion joints. This part of concrete pavement will move away from mid-point between expansion joints.

 


Related Discussions:- Closing and opening of expansion joints and contraction join

Industrial steel floor fire proof, i want to know the construction details ...

i want to know the construction details of industrial steel floor?

Deflection, solving problems with their answer

solving problems with their answer

Classification of timber based on durability, Classification Based on Durab...

Classification Based on Durability: Durability tests are conducted by the forest research establishment. They cover test specimen of size 600 × 50 × 50 mm in the ground to hal

Raised check rails for obtuse crossing, Raised Check Rails for obtuse cross...

Raised Check Rails for obtuse crossing In order to provide guided path way in throat portion of 1 in 8 1/2 BG obtuse diamond crossing, the check rails are raised by welding of

Explain the coordinate system, Explain the Coordinate System 1. A Bench...

Explain the Coordinate System 1. A Benchmark provides only elevation data. 2. Coordinate System provides northing and easting coordinates within a defined system. 3. Coor

Surveying, what is compass survey and and its method

what is compass survey and and its method

Fluid mechanism, tell me something about velocity profile?

tell me something about velocity profile?

What is stilling basins, Q. What is Stilling basins? Stilling basins ar...

Q. What is Stilling basins? Stilling basins are usually introduced to convert supercritical flow to subcritical flow before it reaches downstream. A typical stilling basin comp

Culverts - causeway and bridges, Culverts, Causeway and Bridges: Roads...

Culverts, Causeway and Bridges: Roads have to cross several natural streams like - rivers and canals. They also have to cross railway lines and cross-roads. The structures nee

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd