Characteristics of the manufacturing system, Business Management

Assignment Help:

The natures of the production process the product design and production planning and plant layout have signification affect on inventory policy.

a. Degree of Specialization and Differentiation of the products at various stages: The degree of changes in the nature of the product from raw materials to final product at various stages of transformation viz, final assembly, assembly and packing determines the nature of inventory control operation for example f nature of product remains more or less same at various stages of production then economics can be achieved by keeping the right balance of stock of semi finished product.

b. Process Capability and Flexibility : Process capacity is characterized by processing time of various operations e, g, the replenishment lead time ( length of delay in execution after issuance of a replenishment order) directly influences the size of inventory.

Similarly how rapidly and economically a system can adjust is production rate, shift production facilities from one operation to another and change equipment from one product to another determines the magnitude of flexibility. Inventory policy should towards balancing the production flexibility capacity inventory levels and customer service needs.


Related Discussions:- Characteristics of the manufacturing system

Explain the steps in the control process, Problem 1: (i) (a) Using exam...

Problem 1: (i) (a) Using examples where appropriate, explain the four steps in the control process. (b) Mention the different types of control. Problem 2: Money is a

Benefits from preventive maintenance, a. Reduction of the total time an...

a. Reduction of the total time and consequent reduction in production losses. b. Reduction nin the number or major repairs and consequently reduced maintenance expens

Amount of protection against storages, There is always variation in dema...

There is always variation in demand and supply of product. The protection against such unpredictable variations can be done by means of buffer stocks. a. Changes

Hi, i have problem with my organisaion and management assighnment about art...

i have problem with my organisaion and management assighnment about article based on managerial ethics and social responsibility..

Build a simulation model using the distributions, If the waiting time cost ...

If the waiting time cost per hour for a FAST truck is $100 and the waiting time cost per hour for a non-FAST truck is $40. Build the following ARENA models to help you decide which

Marketing, what''s the fram works of a marketing plan

what''s the fram works of a marketing plan

Develop a complete remuneration plan, Most people do not have any comprehen...

Most people do not have any comprehension of the magnitude of the total costs to the firm resulting from a new hire. This assignment will provide the student with an understanding

Technology used for communication, Question 1 Since 2000, Tizil Company...

Question 1 Since 2000, Tizil Company Ltd manufactures Teddy bears which it exports to European countries. It has several factories located in Mauritius and in Rodrigues. With

Caselets, What should Mr. Sharma have done to avoid the misunderstanding?qu...

What should Mr. Sharma have done to avoid the misunderstanding?question #Minimum 100 words accepted#

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd