Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Q. Basic working of Star Topology?
In Star topology, all user nodes are connected to central node point that interconnects all individual users links and nodes. Data flows from one node, through star centre to desired receiving node. Central node is like a large switch which routes the data from the input line to the output line. Advanced central nodes can have multiple switching paths, so many paths exist at the same time. This topology is used in a telephone system central office. Addition of a new user node requires running just a single link from the star centre to user without disturbing any other node.
Explain the Bidirectional Shift Registers? A Reversible or A Bidirectional shift register is one in which the data can be shift either left or right. D flip-flops are used by
Q A beam containing two types of charged particles is moving from A to B. Particles of type I with charge +3q, and those of type II with charge -2q (where -q is the charge of an el
Q. A shunt generator gives full load output of 30 kW at a terminal voltage of 200V. The armature and field resistance are 0.05? and 50? resp.. The iron and friction losses are 10
Q. What is the basic principle of oscillators? In an oscillating circuit, the amplitude of voltage or current oscillations decays with time owing to the dissipation of energy
Explain Eddy currents. Eddy currents: Magnetic materials placed as in alternating magnetic fields have eddy currents also induced in them. It is because the material is subject
The Electrical Circuit sign convention Notice that current leaves a source at its high potential (positive) terminal but enters a load at its high potential (positive) ter
3-Phase 3 Wire Meter A 3-phase 3 wire meter has 2 elements of each category on the other hand of 3 elements as in the case of 3-phase 4 wire meter. The primary principle of op
Checking at Site - Testing of Meter The routine testing of meters should be carried out once in 3 years. Further, surprise checks should be conducted at the consumer's install
Q. Athree-phase, 600-kVA, 2300:230-V,Y-Ytrans- former bank has an iron loss of 4400 W and a full- load copper loss of 7600 W. Find the efficiency of the transformer for 70% full lo
Explain ferrites and its uses in high frequency devices. A group of magnetic alloys show the property of magnetisation that change, with percentage of various constituent atoms
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd