Q. Compare the basic COCOMO model with the detailed COCOMO model.

Ans. COCOMO contains of a hierarchy of three increasingly detailed and accurate forms.

  • Basic COCOMO it is a static single-valued model that computes software development effort (and cost) as a function of program size expressed in estimated lines of code.
  • Intermediate COCOMO it calculates software development effort as function of program size and a set of cost drivers that include subjective assessment of product and hardware and personnel and project attributes.
  • Embedded COCOMO it incorporates all characteristics of the intermediate version with an assessment of the cost driver's impact on each step (analysis, design and so on) of the software engineering process.

 


Related Discussions:- Basic cocomo model and the detailed cocomo model

State sandwich testing, Define sandwich testing. Testing combines the i...

Define sandwich testing. Testing combines the ideas of both bottom-up and top-down testing by defining a certain target layer in the hierarchy of the module. The modules below

Define the behavioural model, Define the Behavioural Model It defines o...

Define the Behavioural Model It defines operational behaviour of the system.  In this model, numerous operations of the system are represented in pictorial form. Tools used to

Explain the cardinality and optionally, Cardinality & Optionally Card...

Cardinality & Optionally Cardinality represents the relationship between two entities. Consider one to many relationship between two entities -student andclass. Here cardinal

State about the elementary modeling techniques, State about the Elementary ...

State about the Elementary Modeling Techniques A model illustrating bare minimum requirements is known as Essential Model. It has two components: a) Environmental model B)

What is crash, The sudden and finish failure of a computer system or compon...

The sudden and finish failure of a computer system or component.

What are the profits of vertical partitioning, What are the profits of vert...

What are the profits of vertical partitioning? i. These are very easy to maintain changes. ii. They decreased the change impact and error propagation.

Memory locations and registers pc-ir-mar, Assume 64 different op codes and ...

Assume 64 different op codes and 19-bit instruction word in a computer system. Two bits in the instruction are reserved to indicate the addressing mode.    a. Draw a box style ske

Identify all activity dependencies in the project, Question: The activi...

Question: The activities in a project are given the PERT chart below: a) Identify all activity dependencies in the project. b) Clearly distinguish between critical

What are the various testing activities, What are the various testing activ...

What are the various testing activities? i. Test planning ii. Test execution iii. Test case design iv. Data collection v. Effective evaluation

What is cmm and cmmi, CMM = 'Capability Maturity Model', now known as the C...

CMM = 'Capability Maturity Model', now known as the CMMI ('Capability Maturity Model Integration'), developed by the SEI. It's a model of five levels of process 'maturity' that ver

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd