Why does the newness of a project technology increase

Assignment Help Software Engineering
Reference no: EM13311304

Part -1

 

1. Completing the items on a punch list occurs during the _________ phase.

 

2. The ______ phase includes start-up activities and is called "starting the project" by PMI.

 

3. The phase in which the project work is mainly accomplished is the _______ phase.

 

4. How does the initiation phase differ from the planning phase?

 

5. What is a punch list and in which phase is it used?

 

6. What are the four phases of a project?

 

Part -2

 

1. Materials or services whose quality is standardized and that are usually purchased based on lowest price are __________.

 

2. Major components of a project that are specialized and that require the provider to help with solving problems and share in the profits are provided by ____________.

 

3. Worker benefits would be managed by the ________ function.

 

4. Tracking costs and comparing them to the project budget is handled by the ___________ function.

 

5. Buying concrete for a bridge project would be handled by the __________ function.

 

6. Checking to see that the work performed on the project is done consistently and up to specifications is managed by the ________ function.

 

7. The number of people who report to a manager is referred to as the _____ __ ______ (three words).

 

8. If employees are responsible for estimating costs, to whom would they report?

 

Project Organization Activity

 

Refer to the descriptions of the project functions and determine which manager would take care of each of the following problems. If you think the problem requires the attention of more than one function (manager), explain why.

 

1. One of the project team members has filed a sexual harassment suit against another team member of equal rank. ___________

 

2. A contractor is installing equipment that is substandard. ___________

 

3. The computer software used to make a step improvement in the client's operations has a significant bug in it. ___________

 

4. The client wants to use higher-quality materials in the project than was originally agreed on. ___________

 

5. Your organization has announced budget cuts but you cannot afford to lose anyone at this crucial stage in the project. ___________

 

6. A contractor has complained that the procurement manager has a conflict of interest with a competing contractor. ___________

 

Part-3

 

1. If a project is about 20 percent larger or smaller than projects previously done by most of the team members, it should be rated as a ____ for size complexity.

 

2. If the organizational structure is simple and involves few people and no new relationships need to be formed, the project rating for organizational complexity should be a ___.

 

3. If the technology is in an early testing phase, your organization is one of the test sites, and problems are expected, the technology newness complexity rating should be a ______.

 

4. If the technology is new to some of the team members who are not in key positions, but standardized training is available to teach them what they need to know about it to do their jobs, the technology familiarity complexity rating should be a ____.

 

5. Why does the newness of a project's technology increase its complexity?

 

6. The project controls manager decides to change the software his team uses to track project activities from Microsoft Project to Primavera. Few of the staff in that department are familiar with Primavera. How would this change affect the project technology complexity index score? Explain your answer.

Reference no: EM13311304

Questions Cloud

Calculate the limiting angle of resolution for the eye : Calculate the limiting angle of resolution for the eye, assuming a pupil diameter of 1.95 mm, a wavelength of 530 nm in air
What is the unkown mass : two strings with linear densities of g/m are stretched over pulleys, and attached to hanging blocks (string 1 is 20 kg=mass of block)-50 cm away. what is the unkown mass
Determine the wavelength of light : When light with a wavelength of 228 nm is incident on a certain metal surface, Determine the wavelength of light that should be used to double the maximum kinetic energy of the electrons ejected from this surface
What is the critical angle of a light ray : the speed of light in a material is 0.41 c. what is the critical angle of a light ray at the interfacce between the material and a vacuum
Why does the newness of a project technology increase : Why does the newness of a project's technology increase its complexity?Project Phases and Organization.
Determine the momentum of each car : Two cars of collide in a glancing collision and stick together. Before the colli- sion the first car (mass of 500 kg) is moving with velocity 25 m/s at an angle of 30%u25E6 North of East, Determine the momentum of each car in a suitable Cartesian c..
How far is the trip according to you : Sirius is about 9.0 light-years from Earth. How far is the trip according to you, To reach the star by spaceship in 16 years (ship time), how fast must you travel
Write programme that allows a user to enter distinct words : Write a programme that allows a user to enter three distinct words and returns them as a single string
What is the sprinters speed : A sprinter crosses the finish line of a race. The roar of the crowd in front approaches her at a speed of 351 m/s. What is the sprinter's speed

Reviews

Write a Review

Software Engineering Questions & Answers

  Sketch a dependency and er diagram

Sketch a dependency diagram. There are examples in reading assignments of dependence diagrams. In what normal form is this table?

  Approach to system development to define large project

Third approach to system development might be to define one large project which will use iterative approach to the SDLC. Briefly explain what you would include in each iteration.

  Explanations on spreadsheet concepts

A workbook can contain more than one worksheet. Provide an example of a spreadsheet application where it would be necessary to have more than one worksheet, can you describe how that works?

  Relationship of application development methodologies-models

Explain the relationships between application development methodologies, models, and tools. Compare and contrast the various generations of programming languages.

  Design conceptual diagram to identify hardware elements

Design a conceptual diagram which identifies the hardware elements present inall computer systems and their relationships?

  Write an report on a significant software security

Write an report on a significant software security

  Make unix scripts to compute student grades

In this script, change pseudocode that uses a decision structure into a shell script. The script then will accept 3-grades, compute an average, and then show a letter grade based upon the average.

  Create visual logic flow chart-calculate pay of employees

The user will then be able to continue calculating the pay for additional employees until the user decides to stop or until the maximum number of employees is reached. Create a Visual Logic Flow Chart.

  Draw the eerd for main entities of stock trading system

Draw the EERD to accurately represent this set of requirements. This will be Conceptual Design. Clearly specify any assumptions which you are making. You can use any tools (software) to draw EERD.

  Grassroots computing changes way software is designed

Describe how grassroots computing changes the way software is designed, developed, tested, and maintained in typical organization. Write dwon the advantages and disadvantages of grassroots computing?

  Draw a context diagram for the order system

Kitchen Gadgets sells a line of high-quality kitchen utensils and gadgets. When customers place orders on the company's Web site or through electronic data interchange

  Preparing final table list and rationale

Assume you are now going to construct the final table list for Fernando's Skate Shop. Use the following preliminary field list and list of subjects to get started.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd