The case international coalbob manchester is a busy bright

Assignment Help Operation Research
Reference no: EM13347689 , Length: 6000 Words

The case International Coal.

Bob Manchester is a busy, bright middle-manager, with an engineering background. He does not have a knowledge of or great interest in the details of linear programming or the academic literature! Think about what he needs to know in order to make the decisions necessary in his job, what closely-related issues arising from your modelling that he should be informed about, and how he would want to receive this information.

The report should cover:

  • The recommended schedule of burning and, if necessary, buying fuels
  • Input and output data used in developing your recommendation.
  • An insight into the method, logic and tools used
  • Information about the constraints to greater profit
  • Insights into the effect on the burning schedule of FGD
  • The impact of potential changes in the ROC payment rate
  • Suggestions for further work
  • Your models in electronic format, with some accompanying documentation, so that Bob Manchester and his team may do some checking, further 'what-if?' analyses and potentially develop them for further use

International Coal

Coal-fired Power Generation

Compared with other fossil fuels, burning coal produces relatively large amounts of atmospheric pollutants: carbon dioxide (CO2), nitrogen oxides (NOx), sulphur dioxide (SO2) and particulates. Therefore over recent decades there has been a decline in the use of coal for power generation. However, as supplies of other easily-accessible fossil fuels dwindle there remain vast deposits of coal, and the International Energy Agency estimates that coal will still be used to generate 38% of the world's electricity in 2020.

Within the European Union, environmental concerns have led to limits on emission of pollutants. A market has been established for trading CO2 emissions. A generator has to pay for CO2 emissions at the market rate, so they can be treated as an additional fuel cost. This may be extended to SO2, but currently generators are allocated a limit (a 'sulphur bubble') for a year running from October to October (the 'sulphur year').

Flue-gas desulpherisation (FGD) and 'scrubber' technology can reduce emission levels of SO2 and NOx respectively from the exhaust gases.

Coals from different regions of the world have different composition, with different calorific values and pollutant content. Combinations of coals are often used so that trade offs can be made between costs, energy and the various emissions produced.

Recently some coal-fired plants have started to 'co-fire', blending coal with biomass. Biomass includes waste products from forestry (e.g. wood chips), from paper production, and from agriculture. In the UK the Department of Trade and Industry (DTI) has set the target that by 2010 renewable sources should contribute 10% of the UK electricity supply, and generators are paid a supplement for each MWh of power generated this way (this is known as the Renewables Obligation Certificate, ROC, supplement). The DTI foresees the combustion of biomass, both domestic and imported, as being the fastest growing component of the renewable energy.

International Coal

International Coal (IC) operates a large (1,000 MW) coal-fired plant in the UK. They employ a team who purchase different fuels in order to maximise margin (profit) whilst keeping within environmental limits, especially on sulphur. IC has been allocated a sulphur bubble of 30 kilo tonnes for the year (to the end of October). CO2 emission is taken to be 0.8 tonnes per MWh of electricity produced.

Coal is typically bought three or more months ahead of planned burn and stockpiles are kept at the plant. Stockpiled coal is stored in mixed piles, however biomass has to be stocked separately. Transport costs are factored into the fuel prices. The plant has a 35% efficiency, i.e. 35% of the calorific energy released in a burn is converted to MWh of electrical power.

Power is sold to the electricity markets, and fuel buying is done on the basis of future prices in these markets. Each month is divided into four price bands: categorised by weekend or weekday, and peak or off-peak. (Peak periods consist of a 12-hour block). Thus there are four future prices for each month. Power is distributed by the National Grid Company which charges IC a transmission rate of 65p per MWh.

The Problem

The fuel-buying team at IC is led by Bob Manchester. The buying decisions have been relatively straightforward, but as the sulphur bubble has become more restrictive, pressure is increasing to show that the best fuels are being used. Bob thinks there must be a systematic way of considering the tradeoffs involved in the decisions being made.

It is now the end of May 2005. To test the feasibility of a modelling approach, Bob wants to investigate power generation to the end of October, considering the stockpile of mixed coals at the plant, three types of coal that can be ordered for burning in September and October, and wood-chip biomass which can be bought with short leadtimes. Fuel is to be paid for now, ignore discounting of any of the cashflows.

Biomass is more difficult to handle than coal, having more variable combustion characteristics (low density, extremes of particle shape, tendency to entangle and demix plus moisture has a large effect has on their behaviour), so may not provide more than 10% of the mix (by calorific value) in any of the generating periods.

Bob has provided future-price data (Table 2) and fuel characteristics (Table 1). The current coal stockpile at the plant (including coals previously ordered and en route) is 600,000 tonnes and there is 30% of the 'sulphur bubble' left this sulphur year. CO2 emission is trading at 15 Euros per tonne on the European market, which IP must pay for any CO2 produced. The ROC is £45 per MWh from renewables.

He has also mentioned a couple potential future issues. SO2 emissions are a major concern for IC. One possibility is to invest in FGD. There is also the possibility that SO2 emissions may become tradable (and so a direct cost) in the way CO2 currently is. Either of these is likely to have a major impact on operations at the plant, but Bob is unsure how to start quantifying the potential benefits.

Assignment

Your charge is to

  • Build and explain a prototype model
  • Use your model to recommend a schedule of burning and, if necessary buying, fuels
  • Use your model and its results to offer:
    • any further guidance on the impact of the costs of the fuels in particular, since these are futures prices,  the effects of any drops in price
    • any insights you can into the issues of FGD and sulphur-trading

Data

Table 1: Characteristics of Fuels

Fuel

Pricea

Calorific value

SO2

 

£/tonne

GJoules per tonne

%b

Coal: Stockpile

42.56

25.81

1.38%

Coal: Columbian

43.93

25.12

0.70%

Coal: Russian

43.80

24.50

0.35%

Coal: Scottish

42.00

26.20

1.72%

Wood chips

73.77

18.00

0.01%

- constant fuel prices for the period June- October 2005

- a coal with an SO2 rating of 1% will produce 0.01 tonne of SO2 for each tonne of the fuel burnt

Table 2: Future Electricity Prices

Electricity Market

Forward Prices

June

July

August

September

October

Period:

£ per MWh

£ per MWh

£ per MWh

£ per MWh

£ per MWh

Weekday Peak

36.00

36.35

37.65

38.35

43.70

Weekday Off-peak

27.00

27.00

28.20

28.50

31.70

Weekend Peak

33.50

34.30

35.65

35.80

38.70

Weekend Off-peak

26.20

26.30

27.50

27.65

30.10

Table 3: Currency Conversiona

British pound per US Dollar

1.0000

British pound per Euro

0.6667

- constant exchange rates for the period June- October 2005

Reference no: EM13347689

Questions Cloud

1 analysis of the bond issuea show that the price of the : 1. analysis of the bond issuea show that the price of the bond is equal to that of a portfolio which containsi a long
Write a step-by-step plan including comments that reflect : write a step-by-step plan including comments that reflect changes to the machine state to solvequestion 1. input a b
1 design a program that reads in a text file with drawing : 1. design a program that reads in a text file with drawing commands and then outputs a bitmap with all the items drawn
Problem 1 a 25 lbf block b is moving with a velocity vo of : problem 1 a 2.5 lbf block b is moving with a velocity vo of magnitude vo 6fts as it hits the 1.5 lbf sphere a which is
The case international coalbob manchester is a busy bright : the case international coal.bob manchester is a busy bright middle-manager with an engineering background. he does not
Implement functions using x86 assembly in addition to : implement functions using x86 assembly. in addition to implementing procedures this assignment requires to pass
Case analysis a brief outline of the firm and its industry : case analysis a brief outline of the firm and its industry is given as well as a few tips for your attention. you are
Question 1 a using the data from table calculate the : question 1. a. using the data from table calculate the elasticity of demand and elasticity of supply at each price
Questionin november 2010 each and every mzumbe university : questionin november 2010 each and every mzumbe university student had an income of 150000 per month facing the price of

Reviews

Write a Review

Operation Research Questions & Answers

  The problem of operating a warehouse

Consider the problem of operating a warehouse, by buying and selling the stock of a certain commodity, in order to maximize profit over four periods.

  Strategy for dimco related to external distributors

Recommend a strategy for DIMCO related to external distributors. Analyze the consequences of all your recommendations by identifying who is affected and explain how.

  Why did the insurance company raise the rates so much

Why did the insurance company raise the rates so much? How would you estimate a fair insurance rate and from the perspective of the consumer, how were the paybacks structured and how might they be restructured to entice you at an equal or lower cost ..

  Write a report on im operations governance

Write a report on IM operations governance

  Role of the investment banker in building project

What is the role of the investment banker in building project and for the hospital project described, what is the primary objective of the investment banker?

  Problem 1solve the following problem graphically please be

problem 1solve the following problem graphically please be neat suggestion use some graphing software such as

  Obtain a short-term loan to purchase materials

Identify three good investment opportunities for the organization. Obtain a short-term loan to purchase materials. Assess the level of inventory to be kept on hand.

  Explain the five legal theories you could use in an attempt

If the proposal passes, identify and explain the five legal theories you could use in an attempt to have the regulation declared invalid and overturned in court.

  Can the oligopoly market structure benefit both consumers

Can the oligopoly market structure benefit both consumers and businesses by forging common standards in industries that experience rapid technological change?

  Explain how effectively did tjx deal with these problems

Illustrate what was the business impact of TJX’s data loss on TJX, consumers and banks? Explain how effectively did TJX deal with these problems?

  Find expected backorder level and the ordering quantity

Find expected backorder level and the ordering quantity and to preserve the same service level, what order quantity would allow the company to carry no safety stock?

  Discuss the implications of service outsourcing on employees

Discuss the implications of service outsourcing on employees, stockholders, consumers and host country economy when a company outsource a call center oversees.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd