The case international coal

Assignment Help Operation Research
Reference no: EM131622 , Length: 6000 Words

The case International Coal. (Word Limit: 6000)

Reference : Required

Bob Manchester is a busy, bright middle-manager, with an engineering background. He does not have a knowledge of or great interest in the details of linear programming or the academic literature! Think about what he needs to know in order to make the decisions necessary in his job, what closely-related issues arising from your modelling that he should be informed about, and how he would want to receive this information.

The report should cover:

  • The recommended schedule of burning and, if necessary, buying fuels
  • Input and output data used in developing your recommendation.
  • An insight into the method, logic and tools used
  • Information about the constraints to greater profit
  • Insights into the effect on the burning schedule of FGD
  • The impact of potential changes in the ROC payment rate
  • Suggestions for further work
  • Your models in electronic format, with some accompanying documentation, so that Bob Manchester and his team may do some checking, further 'what-if?' analyses and potentially develop them for further use

International Coal

Coal-fired Power Generation

Compared with other fossil fuels, burning coal produces relatively large amounts of atmospheric pollutants: carbon dioxide (CO2), nitrogen oxides (NOx), sulphur dioxide (SO2) and particulates. Therefore over recent decades there has been a decline in the use of coal for power generation. However, as supplies of other easily-accessible fossil fuels dwindle there remain vast deposits of coal, and the International Energy Agency estimates that coal will still be used to generate 38% of the world's electricity in 2020.

Within the European Union, environmental concerns have led to limits on emission of pollutants. A market has been established for trading CO2 emissions. A generator has to pay for CO2 emissions at the market rate, so they can be treated as an additional fuel cost. This may be extended to SO2, but currently generators are allocated a limit (a 'sulphur bubble') for a year running from October to October (the 'sulphur year').

Flue-gas desulpherisation (FGD) and 'scrubber' technology can reduce emission levels of SO2 and NOx respectively from the exhaust gases.

Coals from different regions of the world have different composition, with different calorific values and pollutant content. Combinations of coals are often used so that trade offs can be made between costs, energy and the various emissions produced.

Recently some coal-fired plants have started to 'co-fire', blending coal with biomass. Biomass includes waste products from forestry (e.g. wood chips), from paper production, and from agriculture. In the UK the Department of Trade and Industry (DTI) has set the target that by 2010 renewable sources should contribute 10% of the UK electricity supply, and generators are paid a supplement for each MWh of power generated this way (this is known as the Renewables Obligation Certificate, ROC, supplement). The DTI foresees the combustion of biomass, both domestic and imported, as being the fastest growing component of the renewable energy.

International Coal

International Coal (IC) operates a large (1,000 MW) coal-fired plant in the UK. They employ a team who purchase different fuels in order to maximise margin (profit) whilst keeping within environmental limits, especially on sulphur. IC has been allocated a sulphur bubble of 30 kilo tonnes for the year (to the end of October). CO2 emission is taken to be 0.8 tonnes per MWh of electricity produced.

Coal is typically bought three or more months ahead of planned burn and stockpiles are kept at the plant. Stockpiled coal is stored in mixed piles, however biomass has to be stocked separately. Transport costs are factored into the fuel prices. The plant has a 35% efficiency, i.e. 35% of the calorific energy released in a burn is converted to MWh of electrical power.

Power is sold to the electricity markets, and fuel buying is done on the basis of future prices in these markets. Each month is divided into four price bands: categorised by weekend or weekday, and peak or off-peak. (Peak periods consist of a 12-hour block). Thus there are four future prices for each month. Power is distributed by the National Grid Company which charges IC a transmission rate of 65p per MWh.

The Problem

The fuel-buying team at IC is led by Bob Manchester. The buying decisions have been relatively straightforward, but as the sulphur bubble has become more restrictive, pressure is increasing to show that the best fuels are being used. Bob thinks there must be a systematic way of considering the tradeoffs involved in the decisions being made.

It is now the end of May 2005. To test the feasibility of a modelling approach, Bob wants to investigate power generation to the end of October, considering the stockpile of mixed coals at the plant, three types of coal that can be ordered for burning in September and October, and wood-chip biomass which can be bought with short leadtimes. Fuel is to be paid for now, ignore discounting of any of the cashflows.

Biomass is more difficult to handle than coal, having more variable combustion characteristics (low density, extremes of particle shape, tendency to entangle and demix plus moisture has a large effect has on their behaviour), so may not provide more than 10% of the mix (by calorific value) in any of the generating periods.

Bob has provided future-price data (Table 2) and fuel characteristics (Table 1). The current coal stockpile at the plant (including coals previously ordered and en route) is 600,000 tonnes and there is 30% of the 'sulphur bubble' left this sulphur year. CO2 emission is trading at 15 Euros per tonne on the European market, which IP must pay for any CO2 produced. The ROC is £45 per MWh from renewables.

He has also mentioned a couple potential future issues. SO2 emissions are a major concern for IC. One possibility is to invest in FGD. There is also the possibility that SO2 emissions may become tradable (and so a direct cost) in the way CO2 currently is. Either of these is likely to have a major impact on operations at the plant, but Bob is unsure how to start quantifying the potential benefits.

Assignment

Your charge is to

  • Build and explain a prototype model
  • Use your model to recommend a schedule of burning and, if necessary buying, fuels
  • Use your model and its results to offer:
    • any further guidance on the impact of the costs of the fuels in particular, since these are futures prices,  the effects of any drops in price
    • any insights you can into the issues of FGD and sulphur-trading

Data

Table 1: Characteristics of Fuels

Fuel

Pricea

Calorific value

SO2

 

£/tonne

GJoules per tonne

%b

Coal: Stockpile

42.56

25.81

1.38%

Coal: Columbian

43.93

25.12

0.70%

Coal: Russian

43.80

24.50

0.35%

Coal: Scottish

42.00

26.20

1.72%

Wood chips

73.77

18.00

0.01%

- constant fuel prices for the period June- October 2005

- a coal with an SO2 rating of 1% will produce 0.01 tonne of SO2 for each tonne of the fuel burnt

Table 2: Future Electricity Prices

Electricity Market

Forward Prices

June

July

August

September

October

Period:

£ per MWh

£ per MWh

£ per MWh

£ per MWh

£ per MWh

Weekday Peak

36.00

36.35

37.65

38.35

43.70

Weekday Off-peak

27.00

27.00

28.20

28.50

31.70

Weekend Peak

33.50

34.30

35.65

35.80

38.70

Weekend Off-peak

26.20

26.30

27.50

27.65

30.10

Table 3: Currency Conversiona

British pound per US Dollar

1.0000

British pound per Euro

0.6667

- constant exchange rates for the period June- October 2005

Verified Expert

Reference no: EM131622

Questions Cloud

Fixed income securities : Explain why the price of the putable bond approaches the price
Calculate the output value of problem : Design a program that reads in a text file with drawing commands and then outputs a bitmap with all the items drawn correctly
Intermediate programming : Design a program that reads in a text file with drawing commands and then outputs a bitmap with all the items drawn correctly
Evaluate the maximum height reached by the sphere : Evaluate the maximum height reached by the sphere, and the distance traveled by the block.
The case international coal : Write a report on International Coal
Implement functions using x86 assembly : Implement a procedure that mimics a logic unit
Case analysis: outdoor sports inc : Calculate the Du Pont ratio analysis
Calculate the elasticity of demand and elasticity of supply : Calculate the elasticity of demand and elasticity of supply at each price change in the market for financial calculators
Income adjustment : To maintain utility constant an income adjustment brought the student to consume the basket (61,92). What are substitution effects and the income ?

Reviews

Write a Review

Operation Research Questions & Answers

  Calculate annual rate of return

No additional fixed costs would be incurred if this proposal is accepted

  Prepare a research proposal

Prepare a Research Proposal based on a business issue.

  Project specification and plan

The Project Specification is a description of what you are working to achieve, and a Plan is the schedule proposed to achieve it

  Write a report on im operations governance

Write a report on IM operations governance

  Case study:the british airways story

Case study:The British Airways story

  Red brand canners

Red Brand Canners Gordon asked Myers about the demand for tomato products for the coming year. Myers replied that they could sell all of the whole canned tomatoes they could produce.

  Determine the probability distribution

Determine the probability distribution for demand using the given data.

  Compute the company''s predetermined overhead rate

Corporation bases its predetermined overhead rate on the estimated labor hours for the upcoming year

  Analyse the role of different stakeholders in tourism

Critically analyse the role of different stakeholders in tourism planning and policy

  Optimal translocation strategies

Optimal Translocation Strategies - use stochastic dynamic programming (SDP) to ?nd the optimal decisions

  Evaluate business value

How can internet technologies be involved in improving a process in one of the functions of business? Choose one example and evaluate its business value.

  Bioimetic vascular network design

What kind of material is needed for bioimetic vascular network design?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd