Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Suppose that Chatham Automotive (Problem 7.26) can get a $14 000 trade-in value for their current electric model when they purchase a new propane model. $hould they replace the electric forklifts now?
Problem 7.26:
Chatham Automotive purchased new electric forklifts to move steel automobile parts two years ago. These cost $75 000 each, including the charging stand. In practice, it was found that they did not hold a charge as long as claimed by the manufacturer, so operating costs are very high. This also results in their currently having a salvage value of about $10 000.
Chatham is considering replacing them with propane models. The new ones cost $58 000. After one year, they have a salvage value of $40 000, and thereafter decline in value at a declining-balance depreciation rate of 20%, as does the electric model from this time on. The ALARR is 8%. Operating costs for the electric model are S20 000 over the first year, rising by 12% per year. Operating costs for the propane model initially will be $10 000 over the first year, rising by 12% per year. Should Chatham Automotive replace the forklifts now?
a basketball of mass 0.570 kg is dropped from rest from a height of 1.25 m. it rebounds to a height of 0.734 m. a how
electrically heated draw batch furnaces are commonly used in the heat treatment industry. consider a draw batch furnace
Determine the amount of energy (Joules) and the power (Watts) required drilling a hole of 0.2 (5.08 mm) inches in diameter in a Titanium sheet 0.2 (5.08 mm) inches thick.
the atmosphere is stable with a lapse rate of -0.2 degree c100 m. the surfaces air temperature is 15 degree c. a parcel
two barges each with a displacement mass of 550 mg are loosely moored in calm water. a stunt driver starts his 1510-kg
Calculate the change in frequency, velocity amplitude, and acceleration amplitude if the maximum deflection remains 10 cm.
Design a rectangular beam (tension steel only). Determine bar cutoffs (use the graphical approach). Design the shear reinforcement and check bar cutoffs in tension zones if necessary.
Find the angular velocity and angular acceleration of the pulley at an instant when the bucket is going down at a speed of 20 cm/s and has an acceleration of 4.0 m/s2.
A 1m3 rocket propellant chamber is filled with combustion gases at 3000 K and 7 Mpa at the instant combustion ceases. The throat area of the nozzle is 0.1m2. Estimate the time it takes for the chamber pressure to drop to 0.7 MPa. Assume that the inst..
1. Compute the maximum mass fraction of proeutectoid cementite possible for a hypereutectoid iron-carbon alloy. 2. Is it possible to have an iron-carbon alloy for which the mass fractions of total cementite and proeutectoid ferrite are 0.057 and 0...
tin cans are made of a steel the inside of which is cated with a thin layer of tin. the tin protects the steel from
water density 1000 kgm3 flowing in a horizontal 25 cm diameter pipe at 8 ms and 300 kpa gauge enters a 90 degree
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd