Production management for construction

Assignment Help Civil Engineering
Reference no: EM131562607

Purpose of this Assignment

On successful completion of this assignment, you will able to:

Purpose of this Assignment on successful completion of this assignment, students will:

1. Understand the principles and application of effective site management.

2. Understand the importance of effective communication in planning and resource management.

3. Be able to apply cost forecasting control and reporting techniques.

4. Be able to create planning and programming charts for construction projects

5. Understand how quality issues and environmental considerations are addressed during the production process.

Part 1

Background Information

You are working with the senior project manager of ABC Construction Company (HK) and you have been instructed by the senior project manager to carry out training for the site supervisory teams to improve the site management of the current construction projects. The improvement drive will focus on both effective site management and communication in the planning and use of resources. As the trainer for the site supervisory teams, you need to prepare the training materials based on the following learning outcomes and deliver these to the project teams.

1 Understand the principles and application of effective site management:

1.1 The production teams will need to know the principles of site management and then how these principles are applied to their management of the projects that they are working upon. Explain to the site supervisory teams, a range of basic principles of site management and how these can be applied to the production phase of a project.

1.2 Good practice on site is essential in demonstrating the correct way to manage projects. This then is impressed on the workforce who learned by example. Using three basic principles identified in 1.1, justify each in turn to the site supervisory teams in how their application can be considered in terms of good site practice.

2 Understand the importance of effective communication in planning and resources management:

2.1 There are several techniques that can be used to communicate project information both onsite and offsite. Compare in detail how the project team members can achieve effective and efficient communications by using a range of communication techniques help to maintain good relationships and management of a building project from starting to completion stages. Supplement your answer with examples from your work or the industry.

2.2 There are several barriers that can exist in effective communication on projects which can cause several issues and problems. By analyzing a typical project evaluate the barriers in communication, with a range of examples, for typical construction projects.

2.3 Planning on projects is essential in meeting the client's deadlines and not occurring any penalty or liquidated damages, which would also affect a contractor's reputation. By using a range of examples explain the importance of having good planning and explain in detail how different planning techniques can help to achieve the purposes of control at different stages of a construction project. This should be in the form of an evaluation for a range of planning techniques outlining their advantages and disadvantages of each of them.

Part 2

Background Information

You are working with the senior project manager of Top Rank Construction Limited and are responsible for providing in-house training to the newly recruited project management and quantity surveying teams. In the training, you aim to enhance their knowledge in cost control, project planning, quality and environmental issues, which will contribute in their future service to the company. This is a main strategic direction that the senior management is taking and is of vital importance in maintaining the profitability of Top Rank Ltd.

3 Be able to apply cost forecasting, control and reporting techniques.

3.1 A number of different forms of costing can be used to control the budgets for a project. These include

- Unit costing

- Marginal costing

- Standard costing

- Absorption costing

By selecting any three from the above list evaluate each form of costing system that could possibly be adopted by the construction firm.

3.2 The senior project manager has asked you to write a report using the site data provided and a set of contractor's annual reports to explain the relationships between cash flow, profit, return cost and value.

3.3 Using the data with appendix A produce and explain in detail the cost and value reconciliation statement for the current position of this project for the two work items which are the costs to date and the foundation pour.

4 Be able to create planning and programming charts for construction projects.

4.1 The senior project manager is concerned that progress on site against the programme is not been measured and monitored and projects are 'slipping' against planned progress. Explain how progress can be measured. Illustrate with an example in your answer on how progress can be measured.

4.2 Several delays have occurred on your current project programme. Explain how remedial actions can be implemented in the case of a delay in the programme in bringing the activity back on target and on time to finish as planned.

4.3 The project manager has asked you to explain in detail how the sub-contractors' input can be incorporated into various stages of a project.

4.4 Produce a programme using two different methods and the data contained in appendix B. One of your methods needs to illustrate the critical path and both methods need to demonstrate key subcontractor trades.

5 Understand how quality issues and environmental considerations are addressed during the production process.

5.1 The manager responsible for quality on your projects is concerned that the finishes are not meeting the client's expectations. Explain how quality is assured on construction sites with reference to case studies or examples.

5.2 By selecting a recent project that you have worked upon or read a case study in Hong Kong, evaluate the use of environmental assessments for such construction projects.


Attachment:- Appendix.pdf

Verified Expert

The project is about the depth analysis of the research that had taken for effective site management and every research states different principles and application for effective site management. They all consist of number of practical guidelines and appear to have greatest value. it also adds types of cost for the construction site.

Reference no: EM131562607

Questions Cloud

What is the component cost of common equity for the firm : What is the before tax component cost of debt for the firm? What is the component cost of common equity for the firm?
What is new degree of operating leverage : What is the new degree of operating leverage? What is the operating cash flow at 77,000 units?
Loan agreement with the bank and begin taking the? discount : Should Simple? Simon's enter the loan agreement with the bank and begin taking the? discount?
Will brian be successful in his claims against dr james : Will Brian be successful in his claims against Dr. James? Will Kara be successful in her claims against Dr. Morgan?
Production management for construction : Production Management for Construction - importance of effective communication in planning and resources management
Calculate best-case and worst-case npv figures : We are evaluating a project that costs $1,120,000, has a ten-year life, and has no salvage value. Calculate the best-case and worst-case NPV figures.
What is the effective annual rate being charged : You credit card statement says that you will be charged 1.75% interest a month on unpaid balances. What is the Effective Annual Rate (EAR) being charged
What is the purpose of university education : To what extent do you think that institutions, traditions, culture, society, government, and so on,shape and control us and our conceptions of morality?
Determine the intrinsic value of one share of common stock : Given the following determine the intrinsic value of one share of common stock.

Reviews

inf1562607

9/25/2017 6:19:10 AM

Honestly, I really recommend this website. My turnitin rate is less than 5% and my grade is awesome. I am happy with the way the process of the solution was handled and wishing you all the luck for the good work, I am really satisfied with the expert's work, all the criteria were met and the writing style is very acedemic. thank you so much.

inf1562607

9/25/2017 6:18:17 AM

please find the requirement and questions in the file in google drive (too large to upload to your website) https://drive.google.com/file/d/-9YDfRNWFhfOTBhaEl5YXF2ckxrNVFCenREUkJUa1Jr/ single lined spaced 4 pages per part can include diagram and chart total should be 8 pages single line spaced, please revise price accordingly please change the deadline to 24th and i will pay now. thanks. Same requirement, total 8 pages.

len1562607

7/13/2017 1:08:08 AM

Distinction Criteria Use critical reflection to evaluate own work and justify valid conclusions Identify critical elements of the design and planning for construction project and make recommendations with justification on the optimal solution. Take responsibility for managing and organizing activities Produce a plan on how you will manage and produce evidence for a successful outcome to this assignment. Demonstrate convergent / lateral / creative thinking Explain the site constraints to the project and analyze the technical problems and the root causes in terms of environmental impact. The solutions should address to the root causes giving alternatives with innovative solutions to problems.

len1562607

7/13/2017 1:07:58 AM

Outcomes Possible Evidence M1 Merit Criteria Identify and apply strategies to find appropriate solution Explain the scope of the site management problem in terms of contractual and statutory liabilities and how these should be addressed. M2 Select/design and apply appropriate methods / techniques Analyse the different techniques and resources which to be applied in different large construction projects. Such as labour, plant, materials and sub-contractors. Make recommendation and justifications in the design stage M3 Present and communicate appropriate findings Your presentation techniques are in a report format with a range of sources quoted and referenced using the Harvard system

len1562607

7/13/2017 1:07:05 AM

P4.3 Explain how sub-contractors are incorporated into the overall programme Explain the integration of sub-contractors into main contract programs P4.4 Produce a programme of activities using at least two different planning tolls ( one of which must determine the critical path) including key dates for stub-contractor Production of two programs P5.1 Explain how quality is assured on construction sites with reference to case studies Explain the testing of materials and workmanship. Monitor and supervise of own and sub-contracted labour P5.2 Evaluate the use of environmental assessments for construction projects Analyse the law, national, local and company policies and evaluate an EA's impact on a project

len1562607

7/13/2017 1:06:56 AM

P3.1 Evaluate different forms of costing systems Analyse for example unit costing variable cost and break even analysis e.g. estimated costs, actual costs P3.2 Write a report on cash flow, profit, return cost and value and purchasing, using site data and contractors' annual report Forecasting cost control and writing report techniques. production a range of and value reconciliation statements for individual work sectors Production of cost reconciliation using the data within appendix A P4.1 Explain how progress is measured Explain the type of planning e.g. short term & long term planning, method statement etc and how progress is measured P4.2 Explain how remedial action is implemented in the case of a delay in the programme Review the resources, production control and monitor the sub-contractor.

len1562607

7/13/2017 1:06:50 AM

Unit 15 Production Management for Construction Grading & Evidence Sheet I Outcomes ja ) ,....- , N..,.. .., Possible Evidence 1 Ak 2c- 014 P1.1 Explain how the principles of site management are applied Forecasting, planning, organizating, motivating, controlling, coordinating, management of the workforce and subcontractor explained P1.2 Justify the principles of site management in terms of good site practice Advantages and disadvantages/ pros & cons justified for P 1. 1 P2.1 Compare communication techniques used on-site and off-site Comparison of communication such as written, oral, IT and visual, etc. P2.2 Evaluate the barriers to communication for typical construction project Physical barriers as applied to site communication e.g. site meetings, site diaries P2.3 Evaluate the planning techniques used in the construction and built environment sector Key dates and milestones and sub-contract organization

Write a Review

Civil Engineering Questions & Answers

  Calculate the temperatures of the object with the indicated

Calculate the temperatures of the object with the indicated solar albedo and IR emissivity placed out in the sun where solar radiation is 1100 W/m^2. Assume a rectangular shape of length 4 m and width 3m. Assume no conduction of convective heat loss...

  What type of aquifer material do you expect in the location

The elevation of water in well A is 300m above sea level and well B is 350m above sea level. The wells are 45m apart. A dye test reveals that the specific discharge between the two wells is about 2.75m/day.

  Determine the height of the step on the floor

A uniform flow of normal depth 6 ft is developed upstream in a rectangular channel 10 ft wideand laid on a slope of 0.004. The Manning's coefficient n is given as 0.0149. There is a smooth step on the floor.

  Define what is the federal express philosophy toward quality

What is the Federal Express philosophy toward quality? What specific elements/actions has FedEx implemented in its quality improvement history?

  What is the elevation difference between high point and pvt

An equal-tangent crest vertical curve has a 50 mi/h design speed. The initial grade is +3%. The high point is at station 33+37.43 and the PVT is at station 37+18.26. What is the elevation difference between the high point and the PVT

  Determine the bubble point pressure for a mixture

For a mixture 10 mol % methane 20 mol % ethane 70 mol % butane at 50 degrees Fairenheit determine the bubble point pressure

  Determine the allowable force f that may be applied

If the allowable shear stress in the 7/8" diameter bolt is 35 ksi, determine the allowable force F that may be applied.

  What is the dry unit weight, the saturated unit weight

What is the dry unit weight, the saturated unit weight, and the buoyant unit weight, of a soil having a void ratio of 0.5 and a value of Gs of 2.7?

  A well hit golf ball travels at a speed of 150 mph

A well hit golf ball travels at a speed of 150 mph ( 220 ft/s) as it leaves the tee. The golf ball has a diameter of 1.70 in and weighs 0.099 lb. Assuming standard atmospheric conditions (mu, u air = 3.74 * 10^-7 lb-s/ft2 and rho = 0.00238 slug/ft3) ..

  Show how you would provide adequate drainage

Use Rankine's method to calculate the lateral forces. Neglect the passive resistance at the front of the wall.

  Type of cement

What type of cement would you use in each of the following cases? Why?

  Determine the shear stresses at each of the points on beam

A 6 inch X 4 inch rectangular beam is subjected to a maximum shear force of 1900 lbf. Determine the shear stresses at each of the following points on the beam cross section

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd