Prepare a tender for the installation of steel street lamps

Assignment Help Other Subject
Reference no: EM131192163

(a) State what factors need to be considered when tendering an estimate for a contract.

(b) Before tendering as a contractor supplying materials and equipment specified by the client, state briefly some checks that should be made prior to compiling the tender in order to determine any contract clauses, contingencies or unforeseen circumstances that may affect future profits.

(c) Prepare a tender/estimate for the installation of 20 steel street lamps in 5 streets of a small town to replace ageing concrete lamp standards, using the following information:

The holes for the lamp standards have to be excavated using manual labour.  The old concrete lamps need to be removed using a lorry mounted crane or 'Hiab', which also serves as an extendable  high platform. 

The old lamps are first disconnected by the Supply Authority, which does not form part of the contract.  Removal of old standards to contractor depot is part to the contract.  The new lamp standards consist of the lanterns (lights) complete with the ballast, ignitor, capacitor and lamp already fitted.  The main materials then are the column, the lantern, the cable to wire it, a photo-electric cell, tarmas and the concrete.  The lamps are supplied by the contractor to the client's specification.  The lamp standards have to be erected then concreted (6 metre columns specified require a 1.3 m buried root depth) then the luminaires/lanterns fixed to the top and connected to the connection box at the base of the column.  In order to keep the street lighting disruption to a minimum during lamp standard replacement, arrangements are made with the supply authority to disconnect old standards and connect the 'tails' (i.e. loose cable one end of which is connected to the lamp standard to be used to connect to the supply cable) of new standards.

Connection and disconnection by the Supply Authority is not part of the project tender.  This means that the new standards have to be wired ready for connection.   In order to do this holes have to be excavated adjacent to the old standards to accommodate the new standards and they have to be concreted with tails brought out before connection can take place. 

When connection is complete, the old concrete standards are removed and temporarily stored for disposal in the contractor's depot and the holes of both new and old standards reinstated.  Generally the new standards can be placed within 2 metres adjacent to the old standards.

A mobile crane or 'Hiab' lifts the columns and sets them in the holes and is also used as a platform for working at height.   The lanterns, which contain an infra-red detector for automatic switch-on are pre-wired by the contractor to avoid damage during installation and are attached at height using the  'Hiab' lorry mounted crane to the columns after column installation.  Cables and wiring are passed from the lantern and threaded down the column to the connection box at the bottom.  The lamp standards have to be connected at the base connection box by cable 'tails' to an existing lighting cable run along the pavement.  Identification of existing underground cables is performed by the Supply Authority and drawings passed on to the contractor prior to work commencing.

Connection, made by the Supply Authority, is arranged by the client. Students may assume that the lamps are delivered to the contractor storage depot and are paid for or enter a cost for purchase and delivery in their tender.

Students are at liberty to assign their own labour, ordinary and overtime rates and costs/values for:

  • materials, such as concrete, cabling and accessories and paving stone replacement or tarmac reinstatement
  • hire of equipment, such as cranes, HIABs, concrete mixers, etc. or other hired equipment
  • times for excavating and the size of excavations
  • cable measuring, cutting, laying, connecting and testing of lantern and column cable connections prior and post erection
  • contractor overheads, including depot security, management, clerical (wages, etc.) and contract manager's time compiling tender document and so on
  • any contingencies (e.g. bad weather, vehicle breakdown, vandalism, strikes, difficult terrain, etc, production of As-Built drawings detailing position of new lights and connections underground etc, if any)
  • any other contractor costs that the student may consider necessary. Costs can calculated without considering VAT.

Students should endeavour to use sufficient labour to complete the work within three to four weeks and without interruption of street lighting availability.

All assumptions on which the tender is based regarding quantity of labour and type, duration of manpower employed, times for excavation, positioning and concreting of new standards, removal of old standards, etc.  should be stated.

Note: There are many options to consider when tendering.   For example, students may opt for excavation of all holes before commencement of new column installation as this will cut down on the duration of the Hiab hire.   Alternatively students may consider it more profitable for the contractor to excavate so many holes for old and new standards, then install the new and remove the old standards before proceeding with more excavations.  It should be remembered that the street lighting has to be maintained during the replacement of the standards and the Supply Authority will only disconnect two old and connect two new standards per day.  It is recommended that the best way to execute the contract is to leave as few excavations open as possible and to leave as many columns in lighting as possible.  Temporary reinstatement usually takes place after standard positioning and connection and permanent reinstatement of flags or tarmac in a street will be performed after street completion.   If costs for materials are estimated (for such as paving stones or tarmac, etc.) allowance should be made for some wastage.

The tender should include labour materials, overheads and contingencies, and need not include financial arrangements between contractor and client.   As the tender is a preamble to a project plan, these can be assumed to be interim payments with adjustments and final settlement and it is not necessary to prepare a cash budget, etc.

Constraints should be recognised, as for example the minimum time the Hiab will be required will be 2 weeks if it installs 2 new and removes 2 old standards per day.  All such modes of working should be clearly stated and reasons briefly given for the assumptions on which the tender is costed, for the benefit of the client. 

If a contractor has a long term arrangement as preferred contractor with a local authority or Highways Agency Area, there would usually be a rate or price agreed at the tender stage for the erection of a new column. There would also be a number of rates to cover the different lantern types and column sizes.  Alternatively some contractors tender on a 'cost plus' basis where the client is charged the material and labour cost plus a percentage for the contractor's overheads and profit.  This is the form the student's tender should take, which requires work activities, amounts of labour and rates to be specified and the costs of activities, equipment, contractor's overheads, etc.  to be estimated.   From this a project plan will emerge.

If a tender is pitched too high with profit it may lose out to another contractor.  If too low, it will lose money.  It's a fine line.

(d) A Project plan is required to be prepared for the work tendered for in part (c) using Microsoft Project 2000 Software, or later, or any other suitable project software.   Notes should accompany the project assignment describing the details and thinking behind the project form.

The project should show such features as:

  • Gantt chart with tasks, dates, bar charts, etc. showing linked tasks with any lead or lag times
  • critical path
  • resources list completed
  • resources usage
  • task usage
  • tracking Gantt chart
  • resource fixed and task costs
  • project % completion and cost report(s)
  • tasks that can start simultaneously or prior to the finish of their predecessor, if any.

Task usage with associated costs (resource and task costs) should be simulated for the project at 100 % completion and reports produced.

Verified Expert

This report present information and guideline for tendering for 20 street light at 5 different street. It is also discuss about the factor affected for tendering for contractor. Which are factor need to consider while tendering for contract. Discuss about contract clauses and contingencies which affect future profit of project. Demonstration of tendering with consideration of USA standards. The report is prepare in Microsoft word file with APA reference style.

Reference no: EM131192163

Questions Cloud

What is the first step in performing risk management : What is the first step in performing risk management? What is the exercise called when you are trying to gauge how significant a risk is? What practice helps address a risk? What ongoing practice helps track risk in real time?
Biggest dangers of bring your own device : What do you think are the biggest dangers of bring your own device (BYOD)? What are the best ways for a company to protect against this threat? Justify your answer
Prevalent mobile computing limitations : What do you think are the most prevalent mobile computing limitations? Justify your answer
Information assurance capstone : 1. In the connection of data preparing, PC security and trusted frameworks, clarify what is implied by the accompanying terms and why we need to utilize them:
Prepare a tender for the installation of steel street lamps : Prepare a tender/estimate for the installation of 20 steel street lamps in 5 streets of a small town to replace ageing concrete lamp standards
Programming in a language : When you are programming in a language, which of the following CANNOT be used as a variable name?
Important for a network architect to work : Why is it important for a network architect to work in the office as opposed to working at home?
Which have been recognized globally as an important public : Domestic violence has unwanted effects on the physical and psychological well-being of women, which have been recognized globally as an important public health problem. What supporting statistical data from the article did you find interesting tha..
Discuss the expected effect on income : Discuss the expected effect on income (1) in the year that Wal-Mart makes the changes in its revenue recognition policy, and (2) in the years following the change.

Reviews

inf1192163

2/14/2018 5:04:38 AM

Thank you for the work, Since I know how you measure pages I am all the more clear about expert's paper. That is not an issue. I appreciate the work your conversation has offered to me amid the past school year. I anticipate proceed with the relationship.

inf1192163

1/5/2018 5:21:55 AM

HI. Will this answer give example solutions for all the sections of the question that i have stated and not just part of it. Please do mentioned timescales or equipment to be used and length of time to be used or labour man-hours.

Write a Review

Other Subject Questions & Answers

  Aversion to hamburgers

Meliza very soon developed an aversion to hamburgers, however not to the television program, because of what?

  Industrial relations system of trinidad and tobago

Compare the Industrial Relations system of Trinidad & Tobago with that of Jamaica and make recommendations as to how you believe the two systems can be harmonized or integrated to reflect a move towards becoming a single CSME.

  A black hole

A black hole is a __.

  Company a produces and sells a popular pet food product

the following are the instructions for the task. there is a simulated excel graph providing the specifics. can i email

  Prepare functional specifications for the companys use

In what other ways might the company use the Internet for its own benefit - Prepare functional specifications for the company's use of the Web and the Internet.

  Geographic and geological features of the pacific realm

Name and describe some of the Geographic and Geological features of the Pacific Realm.

  Physiological components of physiological psychology

Many Americans believe that they are overweight, by a few pounds to a few hundred pounds. Because of this, weight loss systems are big business. For this assignment, you are to select a weight loss system and evaluate it in terms of the informatio..

  Te second option requires you to choose a movie from the

the second option requires you to choose a movie from the following list to view. choose a character fromnbspthe movie

  What knowledge about writing the writing process andor

what knowledge about writing the writing process andor yourself as a writer did you learned that has helped you to

  Goal of decision analysis

Which of the following is a goal of decision analysis?

  Compute the measures of central tendency

What kinds of things might happen if a user group and an information systems group worked for a few months on a new health record system without some clear project management - Why is it important to know whether a research article is from a peer-r..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd