Reference no: EM132533039
Quantity Surveying - Principles Measurement Assignment - Leeds Beckett University, UK
Brief -
Substructure - With reference to Drawings No: M (300) measure all items required for a Contractor to price the Works instructed below. Measure all Substructure items (i.e. DPC level and below) from the following work sections, any assumptions must be clearly stated in the query sheet.
Question 1: Groundworks
5 Excavating and Filling
14 Masonry
11 Concrete
Question 2: Floor finishes
28 Floor, wall, ceiling and roof finishes
In accordance with the Internal floor Finishes Schedule, measure all internal floor coverings for the Beckett Lodge. Refer to Beckett Lodge drawings 1 and 2, and Specifications and Schedule.
Set-out your take-off following all standard conventions. Use the take-off paper provided.
Use the provided Query Sheet as necessary.
Follow all relevant NRM2 Tabular Rules and note in your work, the Work Classification of each item, and all applicable information required.