Leading-edge telemetry and control facilities

Assignment Help Software Engineering
Reference no: EM13807382

Part -1:

You have been retained as a Software Engineering consultant to the Muddy Springs Bottled Water Company. The company runs a water bottling plant which is currently undergoing dramatic improvements in equipment and capacity. As part of these improvements an Automated Monitoring and Control System (AMAC) is being developed as specified below. Your job is to oversee development of the real-time software required for the AMAC.

AMAC will allow a single plant operator to oversee and control all aspects of the plant's operations from a central control room. To achieve this AMAC requires new leading-edge telemetry and control facilities.

Below is schematic diagram of the plant.

The bottling plant consists of two integrated systems: the water supply system and the bottle washing, storing and filling system. The water supply system pumps the spring water from the holding reservoir to a special header tank which supplies water to both the bottle washing and filling plants. The header tank must operate within a narrow band to supply the correct pressure to the filling plant. New bottles arrive at the washing plant and are cleaned and rinsed to ensure strict quality controls are met. After cleaning the bottles are transported via conveyor belt (C1 on the schematic) to the bottle storage facility. The bottles are then supplied to the filling plant by the conveyor C2 as required.

The AMAC system will be the hub of the overall system with all data, control and display functions directed through AMAC to the appropriate external devices. The operator's console consists of a mimic board and control panel which exist within the operators room. You can consider the mimic board and control panel as external entities for your analysis. All information displayed on the mimic board and all operators control panel inputs are channelled through AMAC.

Your task is to do a Real-Time Structured Analysis for the AMAC. You are to present your analysis including the following information:

1. An External Entity-Relationship Diagram (ERD) indicating relationships of the AMAC and the other external entities in the system. Note you do not need to include attributes of the entities on the ERD. Just the relationships and their cardinality and modality.

2. Data and Control Flow Diagrams (DFD/CFDs) - to sufficient detail that only a single task is carried out by each process at the lowest level. You should show the control events that occur on the same diagrams. Use the real-time extensions for control flows etc shown in the lecture notes on slide 17 from week 3. You need to determine when and where events will occur. For example, whenever a piece of data becomes available it may need a control event to let the system know that it is available. These events must be clearly shown in these DFD/CFD diagrams and then handled in the CSPEC.

3. Process specifications (Pspecs) - a psuedo-code or similar design language specification is required for each process at the lowest level. Note a narrative description alone will not be considered sufficient.

4. Control Specifications (Cspec) - use combinational or sequential FSMs as required, presented in an appropriate format. The idea is that the Cspec will completely describe how each and every event or control flow is handled in the system. Note you need to provide both "Process Activation

Table" and "State Machine Diagram".

5. A Data Dictionary is required to adequately describe each name or special term used in the analysis, note this includes process names, data flow names, control flow names etc.

Reference no: EM13807382

Questions Cloud

Determine the critical path : From your activity network, determine the critical path and identify any slack within your project. As you develop your project network be sure to think critically about each activity and use your best estimate of the time for the activity. How ha..
The linear programming problems : Find the upper and lower limit for unit profit of Mahogany (M) given a unit profit of Cherry (C=$22).
What is the projects net present value : East Coast Television is considering a project with an initial outlay of $X (you will have to determine this amount). It is expected that the project will produce a positive cash flow of $44,000 a year at the end of each year for the next 13 years. T..
Network configuration including hardware and software : This assignment will bring together concepts and skills you learn in the course into a cohesive project. Select one of the choices below to focus on. Characteristics to address: Hardware (input and output) and Network configuration including hardwa..
Leading-edge telemetry and control facilities : AMAC will allow a single plant operator to oversee and control all aspects of the plant's operations from a central control room. To achieve this AMAC requires new leading-edge telemetry and control facilities.
Corporate governance-finding the best buy : Analyze the three internal governance mechanisms (ownership concentration, boards of directors, and executive compensation) and recommend a possible fourth mechanism that would help align the interests of managerial agents with those of the firm's..
Calculating operating cash flows : (Calculating operating cash flows) Assume that a new project will annually generate revenues of $2,100,000 and cash expenses (including both fixed and variable costs) of $600,000, while increasing depreciation by $180,000 per year. In addition, the f..
Using the yield curve to estimate future interest rates : Assume that the real risk-free rate is 2.1% and that the maturity risk premium is zero. Also assume that the 1-year Treasury bond yield is 6% and a 2-year bond yields 6.5%. Calculate the yield using a geometric average. What is the 1-year interest ra..
What is the expected inflation rate : Using the expectations theory, what is the yield on a 1-year bond, one year from now? Calculate the yield using a geometric average. What is the expected inflation rate in Year 1?

Reviews

Write a Review

Software Engineering Questions & Answers

  Explain about software life-cycle model

Your customized software development company describe which software life-cycle model you would use. You can use the models as described in the book, or from another source, or, alternatively define your own process.

  Define erp and describe its functionalities

Explain the role of MIS in enterprise resource planning (ERP). Conduct research to address the following items. Write a two-page report to the CEO in which you: Define ERP and describe its functionalities

  Identify current trends in terms of life cycle modeling

In software engineering, one can find various life cycle models. Some examples include the waterfall model, agile processes, and iterative and incremental models. Identify current trends in terms of life cycle modeling

  Create a complete limited entry decision table

Create a complete limited entry decision table

  How you plan to monitor and control the risks

Create a 3-5 page memo to the project stakeholders, including your matrix, detailing how you plan to manage and control these risks. Your paper must include the following elements - Brief responses to each risk, including how you plan to monitor a..

  How an array could be used to implement a queue

How does software engineering differ from other, more traditional fields of engineering such as electrical and mechanical engineering?

  Steps to follow in evaluation of software packages

Top Sail's owner read an article about software packages, and she asked you, as an IT consultant, for your advice. When you evaluate software packages, what steps will you follow?

  Investigate and analyse the effect of applying cmmi practice

ITECH3501- 6501 Principles of Software Engineering:  Investigate and analyse the effect of applying CMMI practices/processes in an Agile environment in terms of business performance improvement and the limitations/restrictions of using both, and writ..

  Explain the importance of software testing

Evaluate the issues and challenges associated with software engineering.  Compare and contrast software development process models.

  What are four types of cardinality constraints

What are four types of cardinality constraints? Provide personal examples of each

  Prepare a report explaining the possible methods

Prepare a report explaining the possible methods that can be adopted in this particular scenario, resources required for the methods chosen for this investigation, approximate budget to conduct the investigation

  Discourage vendors from attempting to build products

discourage vendors from attempting to build products add complexity to the purchase, setup and proper operation of peripherals from multiple vendors

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd