Is it economically better to make or buy the component

Assignment Help Management Information Sys
Reference no: EM132148079

Discussion 1

1) Using expected value, is it economically better to make or buy the component?

A lot of factors play an important role when it comes to planning and implementing. All these factors play a key role in project management. All the phases of planning, design, development and implementation are like the basic blocks to a successful project. All these steps are essential and they solve any kind of a problem if they are properly considered.

In this case, the expected value of the product is $650,000 and there have been many proposals which includes purchasing a new item which will lead to the total of $720,000 if it is to be done by other manufacturing company. But, manufacturing in the own company for the first time would cost approximately $450,000 and it saves a lot of money comparatively. So, economically it is better to risk and manufacture it in the own company which would save a lot of money but nobody can tell if it will be successful as the time is already wasted because it was discussed in the design phase that additional requirements are to be met.

2) Strategically thinking, why might management opt for other than the most economical choice?

If it is considered seriously and strategically, the management might definitely opt for something other than the economic factor because the own company has not manufactured it till now and it could very well be a failure. This will waste the time and also money. So, both the factors will not be satisfied and the budgeting and planning might totally go in waste.

Already a lot of time was wasted. The planning phase was already over and they were in the design phase so they will not waste time by again getting back to the planning phase and instead should move ahead and get it done by another company eve when the expenditure increases little. Wasting $70,000 is better than wasting the entire $650,000 according to me.

Discussion 2

1) Using expected value, is it economically better to make or buy the component?

Utilizing the normal esteem, it is more practical to purchase fabricate the required segment. Passing by the scientific articulations for this situation, we understand that buying the segments results to a cost overwhelm which influences the advance of the group and the sum planned for the venture.

Such a circumstance is constantly alluded to as settle on or-purchase choice. Before getting, you need to consider and contrast the aggregate cost it takes with purchase and to make. Looking at the two, you will land at the best choice. For our case, fabricating the part is the best choice. This is claiming, the cost of assembling 10,000 units includes a use of $100,000 setup cost, $40 per segment and $120 for cost of repairing imperfect parts. So, on the off chance that there are no flawed items, at that point the consumption will be $500,000.

Assume 1000 parts are observed to be damaged, the aggregate cost will be $620,000 which is yet less expensive contrasting with purchasing. Purchasing costs $72 per segment, which implies delivering 10,000 segments will be $72,000. In getting, you additionally need to consider different factors, for example, stockpiling and transportation which will in any case be spent on.

Components are cheaper by $38,000

Total cost of repair = 120(2150) = $258,000

Cost of repair of defective units = $100,000 + $400,000 + $258,000 = $758,000

2) Strategically thinking, why might management opt for other than the most economical choice?

The administration may take after the approach that appears to be costlier because of the accompanying reasons.

To have the part being provided from various merchants (different sources), Multi-sourcing has benefits on evaluating and rivalry henceforth getting the best items. For example, the providers will contend as far as conveying quality parts. This will respect a general accomplishment of Teloxy towards addressing its customer's needs.

Multi-sourcing likewise has the advantage of empowering to organization to grow and access new market areas, for case, when the administration group concludes that they will purchase the segments from various providers, this have a constructive effect as they will get the opportunity to interface with various individuals subsequently extending their connections and systems administration the market of the Teloxy.

The administration may decide on the costlier approach might be because of the way that they may not have specialists in Teloxy to do the assembling. This is so considering the way that Teloxy has never occupied with assembling of these segments previously. In this way, the administration should likewise make sense of the conceivable dangers, for example, fabricating items with deformities and low quality. They likewise considered the way that repairing items with abandons costs very.

The administration may settle on the costly way (that is purchasing) will be claiming in purchasing, they have the privilege to scrutinize the nature of the parts and when not fulfilled the provider can simply supplant them with the right segment they require not at all like assembling where when the items are as of now produced, it can't be switched. This empowers the administration group to wash their hands off particularly to capacities that are basic and troublesome capacities/forms that they can't oversee or control.

The last reason the administration group would choose the costlier decision is time. In purchasing the segments, the procedure is somewhat straightforward and takes a brief period. This is from the way that the parts are prepared and sitting tight for its clients not at all like assembling which will adopt time in the strategy, the procedure itself, repair of blemished items and so forth. In this way the speediest way will purchase.

Reference no: EM132148079

Questions Cloud

Standard deviation of the sampling distribution : A sample of 175 randomly selected students, found that the proportion of students planning to travel home for thanksgiving
What is the sample size for studies with moe : What is the sample size for studies with MOE of +/-3.5% and +/-2.8%, with a confidence level of 95%, sample statistics of 50.
Describe the two methods used to access the tunnels : What is the SPF cost from R1 to R4 and Show your calculation - What is the cost from R5 to R2? Show your calculation. Submit your answer as Q14.pdf
What team leader management style would be most effective : As a junior congress person you have been asked to help promote a bill to allow casino gambling in your state. There is much opposition to this bill.
Is it economically better to make or buy the component : A lot of factors play an important role when it comes to planning and implementing. All these factors play a key role in project management.
Improvement and risk mitigation strategies associated to fdl : Purpose of this risk assessment report is to basically identify and outline all threats, weaknesses and vulnerabilities in regards to Fiji Directories Limited
What is the sample size for studies with moe : What is the sample size for studies with MOE of +/-3.5% and +/-2.8%, with a confidence level of 95%, sample statistics of 50.
Simple random sample of consumers : She would like to conduct a simple random sample of consumers interested in using the services of the company. She thinks that a sample of 750 would be plenty.
What is the sample size for studies with moe : What is the sample size for studies with MOE of +/-3.5% and +/-2.8%?, with a confidence level of 95%, sample statistics of .50? Please show work.

Reviews

Write a Review

Management Information Sys Questions & Answers

  Information technology and the changing fabric

Illustrations of concepts from organizational structure, organizational power and politics and organizational culture.

  Case study: software-as-a-service goes mainstream

Explain the questions based on case study. case study - salesforce.com: software-as-a-service goes mainstream

  Research proposal on cloud computing

The usage and influence of outsourcing and cloud computing on Management Information Systems is the proposed topic of the research project.

  Host an e-commerce site for a small start-up company

This paper will help develop internet skills in commercial services for hosting an e-commerce site for a small start-up company.

  How are internet technologies affecting the structure

How are Internet technologies affecting the structure and work roles of modern organizations?

  Segregation of duties in the personal computing environment

Why is inadequate segregation of duties a problem in the personal computing environment?

  Social media strategy implementation and evaluation

Social media strategy implementation and evaluation

  Problems in the personal computing environment

What is the basic purpose behind segregation of duties a problem in the personal computing environment?

  Role of it/is in an organisation

Prepare a presentation on Information Systems and Organizational changes

  Perky pies

Information systems to adequately manage supply both up and down stream.

  Mark the equilibrium price and quantity

The demand schedule for computer chips.

  Visit and analyze the company-specific web-site

Visit and analyze the Company-specific web-site with respect to E-Commerce issues

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd