How would you expect the nonoperation time to be affected

Assignment Help Electrical Engineering
Reference no: EM131258314

The average part produced in a certain batch manufacturing plant must be processed through an average Six machines. Twenty (20) new batches of paris are launched each week. Average operation time = 6 min, average setup time = 5 hr, average batch size = 25 parts. and average nonoperation time per batch = 10 hr/machine. There are 18 machines in the plant. The plant operates an average of 70 production hours per week. Scrap rate is negligible. Determine:

(a) Manufacturing lead time for an average part,

(b) Plant capacity.

(c) Plant utilization.

(d) How would you expect the nonoperation time to be affected by the plant utilization?

Reference no: EM131258314

Questions Cloud

Which is the highest rated of the four european cities : Which is the highest rated of the four European cities under consideration, using the table? - Why does Hard Rock put such serious effort into its location analysis?
What is the journal entry made by company : On January 1, 2016, Company P purchases 100% of Company S voting stock for $800,000 cash, and Company P maintains Company S as a subsidiary. At the date of purchase, Company S reavealed the following: assets $900,000, liabilities $100,000, common sto..
Father of modern social psychology : If you want truly to understand something, try to change it." Kurt Lewin, who's often called the father of modern social psychology (a discipline that uses scientific methods to "understand and explain how the thought, feeling, and behavior of ind..
Who will provide updates and corrections to the system : What hardware will Kelly need to install at Kelly's Salon in order to implement the solutions? What kind of telecommunications will be needed for the solution, including local connectivity inside Kelly's Salon and Internet access? How will she a..
How would you expect the nonoperation time to be affected : The average part produced in a certain batch manufacturing plant must be processed through an average Six machines. Twenty (20) new batches of paris are launched each week. Average operation time = 6 min, average setup time = 5 hr, average batch s..
Prepare an income statement using absorption costing : From the following prepare an income statement using absorption costing and then variable costing. There are no WIP inventories and also no finished goods beginning inventory.
Find the average level of work-in-process in the plant : Determine the average level of work-in-process (number of parts- in-process) in the plant
What is grants allowable casualty loss deduction : In 2013, Colin's personal residence was damaged by fire. Colin was insured for 80% of his actual loss, and he received the insurance settlement. Colin had adjusted gross income, before considering the casualty item, of $40,000. Pertinent data with re..
What are potential sources of risk in fitter supply chain : Metrics are used to measure improvements in supply chain management. What are the benefits of tracking metrics? How often should they be calculated and recorded? Does it depend on the industry? Does it depend on the competitive environment? Why?

Reviews

Write a Review

Electrical Engineering Questions & Answers

  Lithium ion battery technology

The paper includes Lithium ion battery technology with its advantages and disadvantages. The paper discusses about the Lithium air battery in which detailed reactions of Lithium with air including nonaqueous as well as aqueous are given.

  Power transformers and tariffs

Construction of different types of power transformer, significant energy savings

  Paper on orthogonal frequency-division multiplexing

This document is shown a paper on Orthogonal frequency-division multiplexing with advantages, disadvantages and uses.

  Function of the hmi in a scada system

This assignment contains electronics engineering questions like State the commonly found components of a SCADA (Supervisory control and data acquisition) system. and decribe the function of the HMI in a SCADA system.

  Resultant waveform of the odd harmonic series

Prepare an Excel graph showing the individual components and summated resultant waveform of the odd harmonic series resulting in an approximate square wave.

  Explain scada system

Explain the function of the HMI in a SCADA system.

  Design a 2-digit 24 second shot-clock

Design a 2-digit 24 second "shot-clock" countdown timer with pushbutton controller.

  Model a discrete-time system

To understand di erent signal models To be able to model a discrete-time system and design simple signal processing algorithms.

  Draw a relay construction diagram

Draw a relay construction diagram and briefly explain the operation of a relay.

  Frequency division multiplexing

Write a short technical report on Frequency Division Multiplexing

  Impact of electron energy

Briefly discuss the impact of electron energy, electron current and target on the Bremsstrahlung generated.

  Traffic light controller

The schematic of the traffic light controller

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd