Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
How many standard hours are needed to run an order of 200 pieces if the setup time is 1.3 hours and the run time 0.3 hours per piece? How many actual hours are needed at the work center if the efficiency is 130% and the utilization is 70%?
two boys push on the gate as shown. if the boy at b exerts a force of fb 30 lb determine the magnitude of the force fa
Steam at 3 MPa,400 degree Celsius is expanded to 30 kPa, 92 percent isentropic efficency.The mass flow rate is 2 kg/s. Determine (a)the power output.
Compare and contrast the heat capacity pcp of common brick, plain carbon steel, engine oil, water, and soil. Which material provides the greatest amount of thermal energy storage per unit volume? Which material would you expect to have the lowest ..
If the annual equivalent cost of the levee is less than the annual expectation of flood damage, the levee should be built. The annual expectation of flood damage is (1/8)x 20,000 = $2,500. Compute the annual equivalent cost of the levee.
Calculate the expected evaporation rate (kg/h · m2) for a test with water and air under the foregoing conditions, using the known value of DAB for the vapor-air mixture.
The viscosity, µ of a liquid can be measured by determining the time, t, it takes for a sphere of diameter, d, to settle slowly through a distance, l, in a vertical cylinder of diameter, D, containing the liquid. Use dimensional analysis to show h..
1. calculate the 1d atomic packing fractions or apfs in the 100 110 and 111 directions in the fcc structure2. calculate
determine the change in the specific internal energy of solid aluminum as it is heated at atmospheric pressure from 300
the largest couple that can be transmitted
Compute the local convection coefficient at the leading and trailing edges of the heated plate with and without an unheated starting length of t = 1 m.
it is proposed to generate electrical power by installing a hydraulic turbine-generator at a site 70 m below the free
Design the formwork for a 12-ft-high reinforced concrete wall. Concrete will be placed at a rate not to exceed 5 ft/h and will be internally vibrated.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd