Question 1. Outline 2 ways to reduce the environmental impact of civil projects.

Question 2. What is the advantage of incorporating demand operated ventilation in civil designs?

Question 3. In designing stair placement, what would you do to encourage use?

Question 4. How would you develop a sustainable procurement strategy to be implemented during construction?

Question 5. Where relevant to the proposed development, what engineering information at should be provided?

Question 6. What does it mean to have uniquely identified requirements? Why should requirements be uniquely identified?

Question 7. What is the term used for the processes required to ensure that the project include all the work required, and only the work required, to complete the work successfully.
(a) Project Scope Management
(b) Bill of Materials
(c) Work Breakdown Structure
(d) None of the above

Question 8. Project Scope Management has following processes:
a. Collect Requirements
b. Plan Scope management
c. Define Scope
d. Create WBS
Arrange them in the correct sequence.

(a) a-b-c-d
(b) c-d-b-a
(c) b-a-c-d
(d) a-c-b-d

Question 9. How does scope creep happen?

Question 10. What happens during concept design stages?

Question 11. What should a completed detailed design include?

Question 12. Outline a strategy to facilitate collaboration on an engineering project.

Question 13. What is Computer Aided Design?

Question 14. What should happen after the design review?

Question 15. What does it mean to actively listen?

Question 16. How is the client included in design concept development?

Question 17. What is the purpose of design evaluation?

Task 1 - Civil Works Design

You are required to undertake a civil construction design project as outlined below. Your Assessor will take the role of the client for the purposes of this assessment task.

Design Specifications

The Problem
You are a civil designer working for the state department of transportation. You have been assigned responsibility for the design of a truss bridge to carry a two-lane highway across the river valley shown below.

1147_Design Objective.jpg

Design Objective
Satisfy all of the specifications listed below, while keeping the total cost of the project as low as possible.

Bridge Configuration
The bridge may cross the valley at any elevation from the high water level to 24 meters above the high water level.

If the elevation of the bridge is below 24 meters, excavation of the river banks will be required to achieve the correct highway elevation.

To provide clearance for overhead power lines (shown above), the highest point on the bridge may not exceed an elevation 32.5 meters above the high water level (8.5 meters above the top of the river banks).

The bridge may consist of either standard (simple supports) or (arch supports). If necessary, the bridge may also use one intermediate , located near the centre of the valley. If necessary, the bridge may also use cable , located 8 meters behind one or both abutments.

Each main truss can have no more than 100 and no more than 200 .

The bridge will have a flat, reinforced deck. Two types of concrete are available:

Medium-strength concrete requires a deck thickness of 23 centimetres (0.23 metres).

High-strength concrete requires a deck thickness of 15 centimetres (0.15 meter).

In either case, the deck will be supported by transverse spaced at 4 metre intervals. To accommodate these floor beams, your must have a row of joints spaced 4 meters apart at the level of the deck. These joints are created automatically when you begin a new design.

The bridge deck will be 10 meters wide, such that it can accommodate two lanes of traffic.

Member Properties
Materials. Each member of the truss will be made of either carbon steel, high-strength low-alloy steel, or quenched and tempered steel.
. The members of the truss can be either solid bars or hollow tubes. Both types of cross-sections are square.
Member Size. Both cross-sections are available in a variety of standard sizes.

Loads
The bridge must be capable of safely carrying the following loads:
Weight of the deck.
Weight of a 5-cm thick , which might be applied at some time in the future.
Weight of the steel floor beams and supplemental bracing members (assumed to be 12.0 applied at each deck-level joint).
Weight of the main trusses.
Either of two possible truck loadings:
Weight of one standard H25 truck loading per lane, including appropriate allowance for the dynamic effects of the moving load. (Since the bridge carries two lanes of traffic, each main truss must safely carry one H25 vehicle, placed anywhere along the length of the deck.)
Weight of a single 480 kN Permit Loading, including appropriate allowance for the dynamic effects of the moving load. (Since the Permit Loading is assumed to be cantered laterally, each main truss must safely carry one-half of the total vehicle weight, placed anywhere along the length of the deck.)

Structural Safety
The bridge will comply with the structural provisions of the state specified standards, to include:
Material densities
Load combinations
Tensile strength of members
Compressive strength of members

Cost
The cost of the design will be calculated using the following cost factors:
Material Cost:
Carbon steel bars - $4.50 per kilogram
Carbon steel tubes - $6.30 per kilogram
High-strength steel bars - $5.00 per kilogram
High-strength steel tubes - $7.00 per kilogram
Quenched and tempered steel bars - $5.55 per kilogram
Quenched and tempered steel tubes - $7.75 per kilogram
Connection Cost: $500.00 per joint
Product Cost: $1000.00 per product
Site Cost:
Reinforced concrete deck (medium strength) - $5,150 per 4-meter panel
Reinforced concrete deck (high strength) - $5,300 per 4-meter panel
Excavation - $1.00 per cubic meter (See the Site Design Wizard for excavation volume)
Supports (abutments and pier) - Cost varies (See the Site Design Wizard for specific values)
$6,000 per anchorage

Required:
1. Make a detailed list of all constraints and requirements to the bridge design.
2. Prepare functional specifications
3. Present at least 2 designs to meet the design specifications. The designs are to include, as relevant:
calculations, which may include:
loads
sheer forces
bending moments
stresses
construction materials and services quantities
construction cost estimates
recommended sizing of components
recommended materials
recommended reinforcement sizing and location
drawings
risk assessment of:
the existing conditions
the application of the design
maintainability of the works
health, safety and environmental requirements
contribution to ancillary documentation, which may include:
design notes
construction notes
supplementary drawings
input to the specifications

Note: The designs, and their development, should comply with relevant requirements including:
legislative, organisational and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
Code of practice
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation

Reference no: EM133169466

Questions Cloud

What is burberry company diluted earnings : Burberry Company had 200,000 ordinary shares issued and outstanding at December 31, 2022. What is Burberry Company diluted earnings
Identify whether each of the amounts should be expensed : dentify whether each of the above amounts should be expensed or capitalised as an intangible asset. Justify your treatment using the requirements of AASB138
Prepare a monthly manufacturing overhead flexible budget : Prepare a monthly manufacturing overhead flexible budget for the year ending December 31, 2022, assuming production levels range
Prepare all related journal entries to record the franchise : Prepare all related journal entries to record the franchise of Medhealth Bhd for the year ended 30 June 2020 and 30 June 2021
How is the client included in design concept development : Outline a strategy to facilitate collaboration on an engineering project - What should happen after the design review
Compute the selling price per unit : Compute the selling price per unit if the company uses the variable cost method and plans a markup of 250% of variable costs
Recommended reinforcement sizing and location : Undertake a civil construction design project as outlined below. Your Assessor will take the role of the client for the purposes of this assessment task
What would total recruiting cost be for baldwin next year : The goal of this additional investment is to improve the quality of applicants. What would the total recruiting cost be for Baldwin next year
Prepare the journal entry to record income tax expense : Prepare the journal entry to record income tax expense, deferred income taxes, and income taxes payable for 2023, assuming taxable income of $325,000

Reviews

Write a Review

Other Subject Questions & Answers

  Cross-cultural opportunities and conflicts in canada

Short Paper on Cross-cultural Opportunities and Conflicts in Canada.

  Sociology theory questions

Sociology are very fundamental in nature. Role strain and role constraint speak about the duties and responsibilities of the roles of people in society or in a group. A short theory about Darwin and Moths is also answered.

  A book review on unfaithful angels

This review will help the reader understand the social work profession through different concepts giving the glimpse of why the social work profession might have drifted away from its original purpose of serving the poor.

  Disorder paper: schizophrenia

Schizophrenia does not really have just one single cause. It is a possibility that this disorder could be inherited but not all doctors are sure.

  Individual assignment: two models handout and rubric

Individual Assignment : Two Models Handout and Rubric,    This paper will allow you to understand and evaluate two vastly different organizational models and to effectively communicate their differences.

  Developing strategic intent for toyota

The following report includes the description about the organization, its strategies, industry analysis in which it operates and its position in the industry.

  Gasoline powered passenger vehicles

In this study, we examine how gasoline price volatility and income of the consumers impacts consumer's demand for gasoline.

  An aspect of poverty in canada

Economics thesis undergrad 4th year paper to write. it should be about 22 pages in length, literature review, economic analysis and then data or cost benefit analysis.

  Ngn customer satisfaction qos indicator for 3g services

The paper aims to highlight the global trends in countries and regions where 3G has already been introduced and propose an implementation plan to the telecom operators of developing countries.

  Prepare a power point presentation

Prepare the power point presentation for the case: Santa Fe Independent School District

  Information literacy is important in this environment

Information literacy is critically important in this contemporary environment

  Associative property of multiplication

Write a definition for associative property of multiplication.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd