This assignment has two parts.

Risk Register in Excel - Part 1

Using your team's ITP WBS, develop and submit a project risk register in MS Excel:

• A project risk register, from the textbook, from the classroom material, from www.pmi.org, or from other valid research, that meets the following requirements.

• In MS Excel, the risk register should be populated with the risks for at least 3 tasks of different types and categories at EACH level of the decomposition in the WBS (no fewer than 12 tasks must have risks identified -- 3 major tasks, 3 sub-tasks, 3 lowest level leaf node tasks or sub-sub tasks, and also at least 3 risks at the overall project level (Level 0)). (Note that this is minimum required, along with the other things below, to earn a satisfactory score. To earn a better score, you would want to include more risks at each level, and some of the additional things mentioned below.)

• Risks may include, for example, technical IT risks, external risks that impact the project but which are outside the PM's control, project management risks, risks of project changes, and so forth.

• Please note that a task could have more than one risk! The risk register must include MITIGATION strategies to avoid/eliminate or minimize the risk and contingency plans (what you will do if the risk happens). If the format you are using does not include these columns, please add them, then be clear on the difference between mitigation and contingency. Address what aspect of the project will be affected by each mitigation action - cost, schedule, or scope. Provide a recommendation for whether or not the mitigation action should be implemented, remembering that EACH mitigation will impact the project's scope, cost or schedule.

• The risk register should also include:

o Title or description of item or TASK at risk. (This is the WBS task in which the risk occurs, not the risk itself.)

o Also include the WBS ID and a designation of which WBS level the task is at. Each risk in the Risk Register should show the WBS level of the task that it refers to. I urge you to let the computer do this for you, since doing it by hand seems error prone for some reason. Either import the field from MS Project or use an Excel formula to calculate the level for you.

o Description of the RISK (What is the risk? What is at risk of happening?) (This identifies the nature of the risk itself, not the task.)

o Risk category or type (e.g., technical risks, quality risks, financial risks, external risks, organization risks, project risks, quality risks, other risks, etc)

o Consequences, impact, or cost at risk (adjectival or numeric)
o Likelihood or probability (adjectival or numeric)
o Initial risk score (or "risk product", consequence times likelihood)
o Risk handling category (avoidance, mitigation, transfer, acceptance, etc.)
o Risk handling / control / action plan, including

- The mitigation action that, if taken, would minimize the impact of the risk.
- Cost and time to mitigate.
- Contingency plan - what the team will do if the risk actually happens

o Designation of risk "owner" or risk manager (best designated by title or role rather than by individual's name)
o For additional points, you may include such things as:

- Additional risks
- Risks for additional tasks
- Results of handling each risk after controls are implemented:
- Consequences or cost at risk
- Likelihood or probability
- Final risk score or product (consequence times likelihood)
- Quantitative numerical consequences, probabilities, and risk scores (rather than subjective, qualitative, or adjectival assessments)

- Additional narrative discussion of each risk, handling method, etc.

- Total of all the risk scores (risk products) for the entire project after risk controls are implemented, in dollars.

• Also include some risks associated with the general ability to complete the project successfully. (You might consider these risks at Level 0, the root level, of the WBS, affecting the entire project.)

• Finally, if you quantitatively calculated the risk product in those terms, then what is the total of all the initial risk scores (risk products) for the entire project, in dollars.

Text Document - Part 2

Please include the Executive Summary with appropriate changes

Questions: In an accompanying Word doc or text submission, answer the following questions:

1. Which risks (and associated tasks) would be the most threatening to the success of the project and why? This discussion should be very specific to tasks and their associated risks.

2. Which top THREE mitigations (and associated tasks) and risk handling plans should be implemented, and why? Remember that mitigation actions will affect cost, schedule and/or scope - so discuss what can you AFFORD to do based on the likelihood and impact of the risk?

3. What are the TOTAL impacts on cost, schedule and scope for the project if the recommended risk controls and mitigation actions are taken? If you use costs, how did you calculate the cost? Will the risk handling improve things or make them worse? That is, will the project cost more and/or be less successful because of risk handling, or will it cost less and/or be more successful because of risk handling? How so? Explain.

4. How did you determine those costs and impacts? Please describe. What is the benefit of mitigating risks that are identified for mitigation?

5. If your project could only afford $20,000 for mitigation actions, which risks (identify associated tasks) would be implemented?

6. If your project could only tolerate a 5 day delay related to mitigation actions, which risks (identify associated tasks) would be implemented?

7. What would be the most expensive (time and or schedule) contingency action/plan? Identify the associated task and explain why this contingency would be the most expensive in terms of time or schedule.

8. How did you determine those costs and impacts? Please describe.

Submit the Excel and the Word document(s) to the Assignment Area.

Attachment:- assign.rar

Reference no: EM131130264

Questions Cloud

About the organization financial health and performance : In this Project You will discuss factors that may affect current and future performance of Apple company. Based on what you know about the organization’s financial health and performance, you will then forecast future performance of Apple company for..
What is the consultant assuming about your firm : Concerning the cost effect of a price hike, what is the consultant assuming about your firm and its customers?
Cost of common equity-the future earnings and dividends : Cost of Common Equity The future earnings, dividends, and common stock price of Carpetto Technologies Inc. are expected to grow 4% per year. Carpetto's common stock currently sells for $30.00 per share; its last dividend was $2.50; and it will pay a ..
How do varied membrane composition contribute to membrane : How do varied membrane composition and the structural features of molecules in different cells contribute to membrane function?
How did you determine those costs and impacts : Which top THREE mitigations (and associated tasks) and risk handling plans should be implemented, and why? Remember that mitigation actions will affect cost, schedule and/or scope - so discuss what can you AFFORD to do based on the likelihood and..
What is percentage of debt in the firm capital structure : What is the percentage of debt (to be used in the WACC equation) in the firm's capital structure?  Assume that the book value of the firm's debt approximates its market value and ignore other liabilities and deferred long-term liability charges
What is the whole exome sequencing : What is the Whole Exome Sequencing (WES)? What is the goal of it? Applications of exome sequencing. What is comprised? Motivation and comparison to other approaches.
Cost of common equity-equity comes from retained earnings : Cost of Equity with and without Flotation Javits & Sons' common stock currently trades at $28.00 a share. It is expected to pay an annual dividend of $1.00 a share at the end of the year (D1 = $1.00), and the constant growth rate is 3% a year. What i..
Draw two sets of supply-demand curves : In the case of more elastic supply, is the deadweight loss larger or smaller?

Reviews

Write a Review

Management Information Sys Questions & Answers

  Dependent and independent demands on the supply chain1 what

dependent and independent demands on the supply chain1 what is the difference between dependent and independent demands

  The main parts of the frame for analysis of is

The field of MIS deals with ____ issues as well as technical issues. The main parts of the FRAME for analysis of IS are

  How has the manuscript deepened my conceptualisation

Overall Assessment of the paper under review - Significance of findings for IT and Business Alignment practice. How has the manuscript deepened my conceptualisation of some aspect of IT and Business Alignment

  Why have personal navigation devices become popular

Why have Personal Navigation Devices become popular? What technologies are required to facilitate the success of PNDs

  Identify an appropriate purpose for the presentation

Identify an appropriate purpose for the presentation. Identify an appropriate audience for the presentation. Explain the significance of the chosen topic

  What concerns and potential actions the virtual company take

Write a no more 1,200 Persuasion paper discussing what concerns and potential actions the virtual company "Huffman Trucking" should take, Huffman's Trucking information

  Draw a single erd and identify primary and foreign keys

Draw a single ERD - clearly identify Primary and Foreign keys (state any assumptions made) and Create a view that would list all MIS required courses

  It softwarehardwarecase scenariomy ceo wants to know why

it softwarehardwarecase scenariomy ceo wants to know why expensive it softwarehardware are needed in the retail store.

  What type of entertainment events are the most popular

How much the consultation income has been received for organizing the event in past 5 years? What is the average time spent for consultations on each event - Designthe star schema for any Data Marts you have identified, ensuring your Dimensions ar..

  Define a subquery and discuss its use in sql

Define a subquery and discuss its use in SQL

  Developing global information systems

Developing Global Information Systems - challenges a company faces when developing global information systems

  Explain the use of structured english in process description

Why would one use a decision tree and/or decision table in a process description? Explain the process of balancing a set of DFDs. How are mutually exclusive data flows (i.e., alternative paths through a process) depicted in DFDs?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd