How are indirect costs involved in the preparation

Assignment Help Cost Accounting
Reference no: EM131220600

Part 1

Maintaining and Controlling Projects

How does EVM operationalize or put into practice the management of trade-offs implied by the triple constraint discussed since the beginning of the course? Does it allow a balanced appraisal of all three parameters? Why or why not?

EVM has become especially popular as a mandatory contractual reporting methodology between contractors and vendors in very large projects. But it has come under attack in some circles. What would the two sides of the argument be?

Part 2

A. Read "Three Perceptions of Project Cost." (https://www.pmi.org/learning/library/three-perceptions-project-cost-5210

Based on your research and reading, answer the following questions:

•What are the differences in the ways project managers, accountants, and financial comptrollers perceive the expenses of a project?

•How are indirect costs involved in the preparation of the budget for a project?

•Using the typical profit and loss statement included in the Directed Reading, does it surprise you that a $1,000,000 project will generate only the Net profit shown on the bottom line of that statement? Why or why not?

B. You are going to be the project manager for the construction of a large warehouse for a major international company. Of course, there are many elements involved in constructing such a large facility, but this assignment will consider only one, the laying of the facility's foundation (which is obviously preceded by site preparation and followed by the actual construction of the building).

In preparation for completing of this element of the project-laying the facility foundation-complete the following:

•Locate a source of data for the hourly wages that will need to be paid to those who will pour and finish the concrete foundation (the Bureau of Labor Statistics of the United States government is a good source for such information). Be sure to document the source of your hourly wage data for such concrete workers.

•Locate a source of data for the cost of a cubic yard of reinforced concrete. Be sure to document the source of your reinforced concrete cost data.

•Assuming that eight workers will be needed for the completion of the project, that they will work five days per week for 10 hours per day, and that it will take them three full weeks to complete the pouring of the foundation, what is your estimate (based on the hourly wage data that you located) of the labor expense of pouring the foundation?

•Assuming that the foundation will require 400 cubic yards of concrete, what is your estimate (based on the hourly wage data that you located) of the cost of the materials needed for pouring the foundation?

•How would "Overhead charges" (review the Budgeting chapter if you do not remember learning about this term) impact the two estimates that you have calculated?

•How would an increase in the cost of steel (one of the components of reinforced concrete) impact the budget that you had developed?

•If the construction site was impacted by a hurricane during the preparation of the foundation (meaning that work had to be temporarily stopped), how would the overall schedule of the construction project be impacted?

Please provide your answers in a 3- to 4-page Microsoft Word document.

Support your responses with examples.

Cite any sources in APA format.

Reference no: EM131220600

Questions Cloud

Write a class with one virtual and one non-virtual function : Write a class with one virtual function and one non-virtual function. Inherit a new class, make an object of this class, and upcast to a pointer of the base-class type. Use the clock( ) function found in to measure the difference between a virtual ..
Identify why obesity is considered to be a health risk : Define obesity and identify why it is considered to be a health risk. Identify and discuss one feedback system from either sex and identify the hormones and structures/organs involved.
Which two organs do the oviducts effectively connect : Which two organs do the oviducts effectively connect? In males where specifically are androgens produced? What function is performed by the seminiferous tubules? Name the primary sex organs (gonads) for males and females.
Explain the difference between innate and adaptive immunity : Explain the difference between innate and adaptive immunity. Identify one physical and one chemical barrier of the body to infectious pathogens. What type of white blood cells may become pus following response to an infection?
How are indirect costs involved in the preparation : What are the differences in the ways project managers, accountants, and financial comptrollers perceive the expenses of a project? How are indirect costs involved in the preparation of the budget for a project?
Determine what your position is with dealing with terrorists : Write your own thesis statement. See "Draft and revise a working thesis statement" (page 9-12 in A Writer's Reference) - Why this topic? Briefly explain why this topic interests you.
Discuss factor that enhances physical development in chidren : Biology Assignment: Discuss any factor that enhances physical development in chidren under age 8 a page. no need for formatting.
How is the technology applied to the real world : In this section, provide background about the topic. Provide an overview of the topic in general, answering the following questions: How does it work? What is the purpose? How is the technology applied to the real world?
Describe the type of cancer you selected : Describe the type of cancer you selected. Describe thediagnosis: symptoms, diagnosis, staging,andprognosis. Discuss treatment options,including medicines/alternative treatments. Discuss causes/risk factors.

Reviews

Write a Review

Cost Accounting Questions & Answers

  Prepare analysis on per unit basis showing finished bookcase

Variable finishing costs are expected to be $7 per unit with no increase in fixed costs. Prepare an analysis on a per unit basis showing whether Chudrick should sell unfinished or finished bookcases.

  Calculate predetermined overhead rate and product margins

Calculate the predetermined overhead rate and using this traditional approach, compute the product margins for X100 and X200.

  Differences between ordinary income and statutory income

Explain using examples and relevant sections of the act, what the differences between Ordinary Income and Statutory income are

  Evaluate the product factory overhead costs

Evaluate the product factory overhead costs, using (a) the direct labor hour plant wide factory overhead rate and (b) the machine hour plant wide factory overhead rate.

  What is the unit product cost for the month

Hadlock Company, which has only one product, has provided the following data concerning its most recent month of operations: Selling price

  What was per unit conversion cost of the sofas transferred

If 3,000 sofas were started into production on May 1 and 2,500 sofas were transferred to Upholstering. Using the data in (a) above, what was the per unit conversion cost of the sofas transferred to Upholstering?

  Determine the amount of gain or loss

Assume the truck was sold on January 1, 2013, for $15,000. Determine the amount of gain or loss that would be recognized on the asset disposal.

  When oprah gave away pontiac g6 sedans to her tv audience

when oprah gave away pontiac g6 sedans to her tv audience was the value of the cars taxable?on labor day weekend in

  The cost of issuing and tracking a work order

The cost of issuing and tracking a work order would best be classified as what type of activity?

  What will be your periodic cash receipt

What will be your periodic cash receipt, to earn a 12 percent return, if payments are received from the purchaser: at the end of each week.

  Compute the equivalent units of production for each input

Compute the equivalent units of production for each input.

  Calculate the adjustment to finished goods inventory

Assume that the ending inventory of finished goods valued at standard cost is $158,780. Calculate the adjustment to finished goods inventory that would be appropriate because of the erroneous standards.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd