Question: The following scenario pertains to Questions 1-5.

A project consists of the following 5 elements. Assume that the CapEx (capital expenditure) takes place at the beginning of each element, that there are 40 working hours in a week, and that labor is charged at $100/hr. The precedents are given in the second column.

Element Dependencies       CapEx         Duration      Total hrs

A Can start immediately     $5,000      4 weeks        160

B Can start immediately     $10,000     4 weeks        160

C B needs to be complete  $8,000      2 weeks         80

D A and C need to be complete   $12,000 1 week     40

E C needs to be complete   $9,000     2 weeks         80

Question 1:

Using PlanBee scheduling software set up a project (AoN) for the project shown above,

then display a PERT chart for the project. Simply capture the screen with something like Snagit and paste the JPG in here. I am suggesting PlanBee, because it is easy to learn. If you already have MS Project on your computer, you may use that instead.

Question 2:

Create the Gantt chart for the project and paste it in here.

Question 3:

Give a cost estimate for the project, without contingencies.

Question 4:

Using the software Projrisk supplied, calculate the additional contingency for this project so that you will have a 90% confidence of having sufficient funds. Please ensure YOU provide the answer from the software. The examiner will NOT interpret any software pastings you include. However - please paste a copy of the data you have entered and also any relevant backups to support your answer. Also paste a copy of your S-curve in here.

Assume the following, based on past experience:

Expected variation on all materials -5%, +10% triangular distribution

Expected variation on labor -5%, +5% [10]

Question 5:

At the end of the third week you are compiling a progress report.

Task A is proceeding as per plan. However, B is a problem. You have only completed 50% of the work, and you have already booked 140 hours on the job. All CapEx has already been done.

Calculate the following (IF THERE ARE ERRORS - I CAN TRY AND GIVE MARKS BUT ONLY IF FORMULAE ARE SUPPLIED AS WELL):
BAC
BCWS
BCWP
ACWP
SPI
CPI
CV
SV
ETC
EAC

Reference no: EM13978980

Questions Cloud

What are the portfolio weights for a portfolio : What are the portfolio weights for a portfolio that has 154 shares of Stock A that sell for $50 per share and 120 shares of Stock B that sell for $25 per share?
Continuous dividend-continuously compounded risk-free rate : Suppose a company’s $50 stock pays an 8% continuous dividend and the continuously compounded risk-free rate is 6%. Calculate the following: the price of a prepaid forward contract that expires 1 year from now. the price of a forward contract that exp..
Determine the structure of this compound : When the 2-methoxyethanol was redistilled, a higher-boiling fraction (bp 162 °C) was also recovered. The mass spectrum of this fraction showed the molecular weight to be 134. The IR and NMR spectra are shown here. Determine the structure of this c..
The best drinks company in hayward : As manager of the Best Drinks Company in Hayward, you would like to sell drinks at a booth during the major celebration in the Hayward's Central Park. The following table provides information about the drinks that you will be selling:nYou estimate la..
Give a cost estimate for the project : Create the Gantt chart for the project and paste it in here - Give a cost estimate for the project, without contingencies.
Compute macaulay and modi?ed durations for the bonds : Compute Macaulay and modi?ed durations for the following bonds:
Write a paper on sales and use tax issues : Write a paper on Sales and Use Tax Issues in digital age 4 pages for accounting internship
Compute the effective annual rates : Compute the effective annual rates for the following:
What is present value of his contract if money can earn : Icahn Tackel just signed an $11.5 million, four year contract with an NFL team. He received a signing bonus of $2 million; $1.5 million at the end of year one; $3 million at the end of year two; $3.5 million at the end of year three; and 1.5 million ..

Reviews

Write a Review

Mechanical Engineering Questions & Answers

  A paper plant replaces an aged and worn 150 ho engine with

a paper plant replaces an aged and worn 150 ho engine with an efficiency of 90 with an updated model with an efficiency

  Inside air temperature when outside air temperature

Assuming that the occupants' body heat provides a continuous source of 320 W within the igloo, calculate the inside air temperature when the outside air temperature is Too  = -40 C. Be sure to consider heat losses through the floor of the igloo.

  If a cylindrical rod 15 cm long is loaded in tension until

a bronze alloy exhibits a yield strength of 350 x 106 pa and a modulus of elasticity of 150 x 109 pa. if a cylindrical

  Voigt model can be applied for this mechanical behavior

A plastic was stretched initially from 30 mm to 35 mm and then released at room temperature. The length changes with time were obtained as the following. Assume the Voigt model can be applied for this mechanical behavior.

  Determine the automobiles braking distance from 60 mph when

if an automobiles braking distance from 60 mph is 150 ft on level pavement determine the automobiles braking distance

  If the pu needs to be compressed to 25gcm3 to explode what

the atomic bomb dropped on nagasaki in 1945 used 14lbm of plutonium pu that was in a subcritical state meaning it would

  Verify the law for parallelogram of forces

To Verify the law for parallelogram of forces, law for triangle of forces and law of polygon of forces. These laws are very useful to calculate unknown forces in very short time.

  Composition cells-stress cells

Please include images of: composition cells, stress cells, concentration cells, coatings, inhibitors, sacrificial anodes, impressed voltages, anodic protection, cold worked grain structure and recrystallized grain structure.

  At approximately what temperature would a specimen

At approximately what temperature (in Kelvin) would a specimen of an alloy have to be carburized for 1.8 h to produce the same diffusion result as at 930°C for 14 h? Assume that values for D0 and Qd are 2.8 × 10-4 m2/s and 137 kJ/mol, respectively.At..

  Preliminary drawings of a passenger railway carriage

Figure 1 (a) & (b) show some preliminary drawings of a passenger railway carriage that was supplied to a design engineer to confirm the thickness of Aluminium sheets needed to fabricate the superstructure of the carriage.

  Determine the shearing stress in the glued splice

Determine the shearing stress in the glued splice, when the splice angle is 30 degrees instead of 60degrees. P = 1400lbs.

  Obtain a plot of the approximate transfer function model

the volume of a hemispherical storage tank as a function of its height is given by vt pirh2t - pi3h3t where r is the

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd