Future gas production from the marcellus shale field

Assignment Help Financial Management
Reference no: EM132024473

The reason your company is exploring options to build a power plant in the Philadelphia area is that they control large amounts of Pennsylvania based natural gas reserves. Since prices are currently so low, the company has decided to invest in secondary commodities produced from natural gas like electrical power and plastics to increase their profit margins.

Your company is making a decision as to whether to go forward with one of two proposed natural gas pipeline construction projects (or none at all). The first option known as “PennEast” would link the north central Pennsylvania Marcellus Shale fields with the Philadelphia via a direct northerly route (120 miles). The second option, “Atlantic Sunrise”, would connect the same gas field with Philadelphia via a less direct, but easier southerly route (180 miles). The construction and right of way costs for PennEast are expected to fall within the range of $300,000 to $450,000 per mile due to the more difficult terrain, and construction costs for Atlantic Sunrise are estimated to be within the range of $200,000 to $250,000 per mile. Consider uniform distributions for both.

Future gas production from the Marcellus Shale field is uncertain. The quantity of gas that our analysts expect we could transport can be described by a triangle distribution with the following parameters.

Marcellus Field Gas Production (MMBTU of natural gas per day):

Min: Mode: Max:

40,000 60,000 70,000

Future gas prices are also uncertain and the amount that the company will save by transporting their own gas to turn it into electricity is given by the uniform distribution parameters described below. Like the power plants, the pipeline is planned to have a life of 30 years. The amount of gas required each year you calculated in the previous assignment. Comment on how this compares with the production quantities. The value of transport along the pipeline per MMBTU has been calculated and since this number is uncertain depending on other energy sources and competing bids for the gas, it should be assumed to follow a normal distribution with a mean of $0.50 / MMBTU transported and a standard deviation of $0.30 / MMBTU transported.

Conduct a Monte Carlo simulation of these financial outcomes of these two projects, and make a recommendation to management of which option to pursue (if any) based on the NPV of the projects. You should still use a discount rate of 12% to evaluate the projects.

The unit benefits and total annual gas production should be assumed to remain constant on an annual basis for each iteration of your simulation. For any distribution shapes not explicitly defined, uniform distributions should be assumed.

Also, clearly communicate the risks associated with your recommended choice. Use the last paragraph of your memo to convey carefully crafted risk communication statements from you to your company’s board of directors based on your analysis of all currently available information on the pipeline project.

Directions:

1) You may calculate the NPV of two projects and compare them.

2) Note that we will have distribution for NPVs.

3) So, you need to find the ways for comparing the two distributions.

Reference no: EM132024473

Questions Cloud

Identify health care policies : Identify health care policies that use cost shifting. Argue the benefits of cost shifting. How might the Affordable Care Act decrease cost shifting
What is zero latency real-ime premise : What is zero latency real-ime premise when it related to and affects a business intelligence programs. With example
How will the environmental analysis support the marketing : Examine the strategic plan of the HCO you have chosen for your Final Project and the results from the SWOT analysis that you performed in Week Two.
Basic description of events and event procedures : Please provide a basic description of events and event procedures? How do you invoke an event procedure?
Future gas production from the marcellus shale field : Future gas production from the Marcellus Shale field is uncertain. Conduct a Monte Carlo simulation of these financial outcomes of these two projects
Involved in the process of assessing security requirements : What is involved in the process of assessing security requirements and defining the security structure with policies?
Configure pc and mobile device hardware and components : Create process documents that explain the steps to install and configure PC and mobile device hardware and components.
Calculate the corporate value for each capital structure : calculate the levered beta, the cost of equity, and the WACC. Now calculate the corporate value for each capital structure.
Describe the social situation of social psychological theory : Thinking Journal To prepare for this journal, watch Social Thinking (Links to an external site.)Links to an external site. (2017).

Reviews

Write a Review

Financial Management Questions & Answers

  Foreign company acquisition

Acquisition by a foreign company and the effects of that decision and the results of foreign exchange in Euro and the exchange rate differences.

  Financial management for profit and non profit organizations

In this essay, we are going to discuss the issues of financial management in a non-profit organisation.

  Method for estimating a venture''s value

Evaluate venture's present value, cash and surplus cash and basic venture capital.

  Replacement analysis

This document show the Replacement Analysis of modling machine. Is replacement give profit to company or not?

  Business finance task - capital budgeting

Your company is considering using the payback period for capital-budgeting. Discuss the advantages and disadvantages of this technique.

  Analysis of the investment

In this project, you will focus on one of these: the additional cost resulting from the purchase of an apple press (a piece of equipment required to manufacture apple juice).

  Conduct a what-if analysis

Review the readings and media for this unit, including the Anthony's Orchard case study media. Familiarise yourself with the Anthony's Orchard company and its current situation.

  Determine operational expenditures

Organisations' behaviour is guided by financial data. In the short term, such data will help determine operational expenditures; in the long term, historical data may help generate forecasts aimed at determining strategic plans. In both instances.

  Personal financial management

How much will you have left over each half year if you adopt the latter course of action?

  Sources of finance for expansion into new foreign markets

A quoted company is considering several long-term sources of finance for expansion into new foreign markets.

  Long term financial planning

This assignment is designed for analyze Long term financial planning begins with the sales forecast and the key input in the long term fincial planning.

  Explain the role of fincial manager

This assignment explain the role of fincial manager, function of manger. And what are the motives of financial manager.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd