Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Design the combinational 3 bit gray to binary code converter for conversion angular position of a shaft into binary code.
1) Complete the truth table
2)obtain the minimal solution with a K map
3) draw the circuit diagram, labels the inputs and outputs
4) Find the critical path and determine the propagation delay
5) list the input transitions creating the maximum propagarion delay
A serial transmission is set up for 8 bits with odd parity. The first two bytes of data are 01110111 with parity bit 1 and 01101010 with parity bit 0. From this we know that there are no errors in transmission.
Assume a block size of 256 bytes, a clock rate of 1GHz, an L1 miss rate of 2%, and that main memory takes 100ns of overload and then delivers 16 bytes per clock cycle. What is the AMAT
In a power supply, a 150 microfarad capacitor was connected in parallel with a 200 kOhm resistor. The capacitor was maintained at a charge level of 350 volts DC. After power was removed for ten seconds, someone god a shock from touching the termin..
Determine the response of the system when aunit step is applied at input.
A star connected synchronous motor at 187 kVA, 3-V, 2300V, 47A, 50Hz, 187.5 rpm has an effective resistance of 1.5 ohm and a synchronous reactance of 20 ohm per phase. Determine internal power developed by the motor when it is operating at rated c..
If we define the resolution of a Digital-to-Analog Conversion (DAC) device to be the reciprocal of its number of logic states in percentage, what will be the resolution of an 8-bits DAC device
A circuit consists of a battery connected to three resistors (60ohm , 30ohm , and 180ohm ) in parallel. The total current through the resistors is 1.9A . Find the emf of the battery.
a carrier wave is frequency-modulated using a sinusoidal signal of frequency fm and amplitude Am. (a) determine the values of the modulation index beta for which the carrier component of the fm signal is reduced to zero. see the appendix for calcu..
c) Write the SOP boolean equations as obtained directly from the partial truth table above and sketch a logic circuit diagram for them. d) Reduce the above equations step-by-step into the simplest form that would use only NAND gates.
A 15 hp, 209V,three-phase,six pole, Y-connected induction motor has the following parameter values per phase: R1= 0.128 ohm, R'2=0.0935 ohm Xeq- X1 + X'2 = 0.49 ohm. The motor slip at full load is 3%, and the efficiency id 90%.
Looking at feedback and some Opamp problems, If the unity gain frequency is 5 MHz and the midband open-loop voltage gain is 200,000, what is the cutoff frequency?
modify the Very Simple CPU to incorporate a new 8-bit register,R, and two new instructions. MVAC performs the transfer Râ†AC and has the instruction code 1110 XXXX; MOVR performs the operation ACâ†R and has the instruction code 1111 XXXX.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd