Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
when an AC source is connected accross a 12.0 resistor,the rms current in the resistor is 8.00 A find (a) the rms voltage accross the resistor,(b) the peak voltage of the source , (c) the maximum current in the resistor ,and the average power delivered the resistor.
If someone presses the 1 or First floor button, the elevator should go to the 1st floor, open the door and remain in this state for a small amount of time, then close the door. Assume the elevator takes one clock cycle to travel.
Let x(t) be a signal with x(t)=0 for t
Calculate the amount of work done if the process is considered to be polytropic. Assume the temperature to be 273K and the value of k for the process to be 1.4. All losses are neglected.
average velocity of v meters/second. If the concentration of free electrons is 10^{29} electrons per cubic meter and if they are uniformly dispersed throughout the wire, then what is the average velocity of an electron
calculate the average signal-to-noise (SNR) in decibels (dB) Assume equal numbers of binary 0s and 1s.
If the data stream is transmitted using a bandwidth of 64 kHz in an ordinary system (without spread spectrum), what is the SNR that could be tolerated without experiencing significant errors
A single phase two winding transformer having rating: 20 KVA,480/120 V, 60 Hz A source connected to the 480 V winding supplies an impedance load connected to 120 V winding. The load absorbs 15 KVA at 0.8 pf lagging when load voltage is118 V.
Need to use multisim and proteus and have build the circuit diagram on multisim and proteus, also have the program written, all u need to do its simulate it and take the necessary results.
A certain three-port network is lossless and reciprocal, and has S13 = S23 and S11 = S22. Show that if port 2 is terminated with a matched load, then port 1 can be matched by placing an appropriate reactance at port 3.
The axis of the cylinder is along the z axis, and the electrons are moving with a velocity vector v in the positive z direction. The velocity of the electrons is 0.1c where c is the speed of light (2.99792458 ´ 108 [m/s]). The magnitude of the cur..
Describe the steps in the keypad polling routine. Draw a flow chart for the keypad LCD software code. Discuss challenges experienced in developing the keypad LCD software code.
A three phase generator is connected to a three phase load via a step up three phase transformer, a short three phase transmission line and a step down three phase transformer.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd