Explain finding metal removal rate

Assignment Help Mechanical Engineering
Reference no: EM13135289

Finding Metal Removal Rate

In an electrochemical machining operation, the frontal working area of the electrode is 2.5in squared. The applied current=1500amps, and the voltage=12volts. The material being cut is pure aluminum, whose specific removal rate is 1.26 x 10^-4 in^3/amp-min.

If the electrochemical machining process is 90 percent efficent, determine the rate of metal removal in in^3/hr.

Reference no: EM13135289

Questions Cloud

Covers of topological spaces : Here is an example of what: In space Reals with the "usual topology.", call it X, the covering A={(-n, inf) | n natural number} of X contains no finite subcollection that covers X.
What is the engineer concern about the overhead rate : ABC Inc., a specialized equipment manufacturer, uses a job order costing system. The overhead is allocated to jobs on the basis of direct labor hours. The overhead rate is now $2,000 per direct labor hour.
Basis of the new barn : A barn, destroyed by fire, had a basis of $40,000. The owner received $50,000 in insurance proceeds. The barn was replaced by another barn costing $45,000. The basis of the new barn is:
What is cottons capital balance after this new investment : Bishop has a capital balance of $ 120,000 in a local partnership, and Cotton has a $ 90,000 balance. These two partners share profits and losses by a ratio of 60 percent to Bishop and 40 percent to Cotton. Lovett invests $ 60,000 in cash in the pa..
Explain finding metal removal rate : Finding Metal Removal Rate In an electrochemical machining operation, the frontal working area of the electrode is 2.5in squared
What is neary capital balance after kansas investment : The capital balance for Bolcar is $110,000 and for Neary is $40,000. The two partners share profits and losses 70 percent (Bolcar) and 30 percent (Neary). Kansas invests $50,000 in cash into the partnership for a 30 percent ownership. The bonus me..
Basics of manufacturing overhead budget : All other fixed manufacturing overhead costs represent current cash flows. The January cash disbursements for manufacturing overhead on the manufacturing overhead budget should be:
Write a convincing letter of where you would like to visit : Write a convincing letter of where you would like to visit, states the names of the places and what experience it will serve you and convince them you will return in Indirect format by mentioning your ties if possible.
Constructing two equal angles : Construction- To construct two angles the same measurement Please construct the following. Please make it large enough. Draw an acute angle. Label the vertex P.

Reviews

Write a Review

 

Mechanical Engineering Questions & Answers

  Define aeroplane dynamics

Aeroplane Dynamics, Determine the steady thrust that would enable a 200-tonne airliner to reach its take-off speed (75 m sâ?'1), from rest, in 30 s

  Automatic control system

Classify the sections of the components in automatic control system.

  Develop a dynamic model of a trebuchet

Analysis of the motion of swing including velocity and acceleration plots of all moving parts and projectile analysis of projectile eg: flight path, horizontal distance, deceleration and launch velocity

  Alternative methods for casting the concrete for the wall

Compare the time and cost of using the following three alternative methods for casting the concrete for the wall: 1) direct chute 2) pumped 3) crane and bucket.

  Automatic control

DOF system and Find the differential equation describing the system

  Module fea - finite element analysis

Module FEA - FINITE ELEMENT ANALYSIS ,  Provide answers to all questions. Note that assignment part 2 carries 60% of the marks for the course.

  Define a jack-screw has a handle inches long

A jack-screw has a handle 35 inches long and a pitch of 7/32 inches. If a pull of 15 lbs. is required at the end of the handle to lift a 3,000 lbs.

  Capabilities of solidworks motion manager

Prepare a power point presentation and a short report relating to the capabilities of Solidworks Motion Manager.

  Computing electrical power from a geothermal resource

Calculating electrical power from a geothermal Resource, A geothermal well is producing 9000kg/second from a hot water basin at 200 ºC [enthalpy of 800 KJ/Kg].

  Manufacturing processes-determine the velocity of shearing

Determine the velocity of shearing along the shear plane and the velocity of sliding at the tool-chip interface and find the work done per minute in shearing the metal and against the friction.

  Draw free body diagram - shear and moment diagrams

Determine if the shaft has infinite fatigue life. If not, determine the number of cycles to failure. Also determine the safety factor for first cycle yield and draw a free body diagram, shear and moment diagrams, and graph the loads on the shaft..

  How to create a directory called class

make a text file that contains what is your absolute path, and call it paths.txt

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd