Reference no: EM132119568 
                                                                               
                                       
BUSINESS PROCESS ANALYTICS AND CHANGE ASSIGNMENT
CASE STUDY - Crater Lakes Caravan and Camping Park
Requirements      - In this assignment, you will be required to form   learns of      approximately four (4) people. One team member is to be   elected the      learn leader for the duration of the assignment Teams will   prepare a      business report based on a process -case study and should use    their     own initiative regarding arty assumptions and cycle times if     needed.
The report should contain details of the following tasks:
a) Provide a description and application of a process categorisation model (e.g. Porter or Earl).
b) Provide a description and application of the Capability Maturity Model (CMM).
c)      Apply Dijkman et al's (2011) technique discussed in lectures to        prepare a case function matrix and identify all associated processes.
d) Using appropriate software, model any two (2) of the processes identified in part (c).
e)      Provide an explanation of how each of the models created in part   (d),      adhere to Mendling el al's (2010) 7PMG guidelines discussed in        lectures.
f)      Consider each model produced in part (d), calculate the process   cycle      time for each of the two (2) processes modelled. Any assumptions      made   should be documented in the report.
g) Use      redesign techniques by Reljers and Mansar (2005) discussed in        lectures, to identify any two (2) design flaws in the as-is models        created in pert (d). Use heuristics and any appropriate product-based        design approaches and display the Impact of any heuristic measures  on       the Devil's Quadrangle. Any assumptions made should be  documented  in   the    report.
h) Draw the architecture of your BPMS. Identify and describe all it components.
A suggested template for the above report is provided. You can use it as a guideline for presenting your business report.
A suggested report structure is as follows:
Title page
Executive summary
Table of contents
1. Introduction
2. Business Process Modelling Report for: [insert case study name]
2.1 Process categorisation model
2.2 Capability maturity model
2.3 Case function matrix
2.4 Process Model for: [insert process name 1]
2.5 Process Model for: [insert. process name 2]
2.6 7PGM discussion for: [insert process name 1]
2.7 7PGM discussion for: [insert process name 2]
2.8 Cycle time for: [Insert process name 1]
2.9 Cycle time for: [insert process name 2]
2.10 Redesign for: [insert process name 1]
2.11 Redesign for: [insert process name 2]
2.12 BPMS architecture
3. Conclusion
4. References
Points to remember: 
- Assignment should be similar as of assignment data.
- Firstly, read the case study which attached below.
- All the answer is based on case study.
- Please follow the report structure as well as marking criteria.
- Avoid complicated words.
- In-text reference
- Full references using end note
use draw.io to make bpmn diagrams.
Attachment:- case study.rar