Discuss challenges of earned value analysis in industry

Assignment Help Other Subject
Reference no: EM131461142

Course Project Assignment

Overview - Last week we completed our extensive work on Earned Value Analysis with the submission of two essays.

Each of you:

  • Wrote an essay on the advantages and challenges of Earned Value Analysis in industry
  • Wrote an essay on the use of earned value for forecasting, and your own EVA forecast for your project.

As your final assignment for PROJ592, this week you will be performing one of the basic functions of cost and schedule control that is modifying our project to bring it back into line with our project plan.  You also will be writing your lessons learned from this entire multi-phase course project effort and the course in general.

  • You will be utilizing the techniques and approaches we have covered in class to make appropriate changes to your project to bring it back in line with your baseline.
  • You will document those efforts in a 2-page Executive summary and a longer essay, explaining what you found and what you did about it.
  • In a third essay, you will document your lessons learned for this course including going through the multiple phases and activities we've covered in our 7-part course project assignment (I hope and expect a lot of learning took place that I'm sure you can write about it extensively).
  • You will be submitting your final version of your project plan with all the changes you made to correct deficiencies in cost and schedule, for review.

Assignment 1 - Executive Summary

As the primary audience for this work is executive management (for whom time is an ongoing concern), the custom is to provide an Executive Summary to give that audience a quick but factual high-level view of the project status both current and projected. The notion is, executive management will only look at the summary unless for particular items or issues they want to dive into the detail which you will provide in a separate essay.

The most effective way to write the executive summary is to first to write the detailed essay (see Assignment-2 below) and then summarize that material into this shorter more high-level document, but one still containing the pertinent data and proposed direction.

  • Your executive summary will highlight the current status of your project and your current EVA numbers.
  • Your executive summary will highlight any issues or problems you found with the project in terms of schedule and cost.
  • Your executive summary will then explain, in summary, the steps that you are taking to bring the project back to baseline, or if that is not completely possible, what will be the effect by project completion.
  • You will be using a template named "add your name here- Final Project Essays" for your Essay (you will be using the same template for all essays).
  • At LEAST 2 pages long in length with appropriate references (you didn't invent the strategies for project control).

Formatting:

  • Double-space (no additional space between paragraphs)
  • One-inch margins
  • Times Roman12-point font size
  • Left justified

Assignment 2 - Controlling Your Project Essay

We had you mess with your project plan by forcing a 40% completion with 60% schedule progress, and several other common issues (schedule slippage, cost overruns etc.). You have done your EVA forecast last week and now it's time to take steps based on what you found to bring the project back to baseline or as close to it as you can get. You may not simply back out the changes we had you put in.  For the purposes of our educational goals, we are going to say those things happened, and the current percent complete of your project is 40%, and we are 60% into your schedule (that is your status date is that 60% calculated date.)So MAKE SURE your STATUS DATE in the PROJECT INFORMATION Window is the 60% calculated date NOT BLANK or all your EVA numbers will be bogus! Make sure your % complete is still 40% or you have changed the scenarios starting point.

In theory, we always need to balance project scope, with project budget, and the project schedule. In practice, that seldom happens. Usually, something has to give. My normal prescription is freeze one, (for example scope), manage another (for example budget) and float the third - which in this example,that would be schedule.

So, in this example, we would guarantee to deliver to the original scope PERIOD! We will try to stay as close to the original budget as possible - but the schedule may move out a bit (or a bunch).

You may not be facing such dire consequences - or you might be. At a conceptual level facing such issues, I don't know what your stakeholders would want to do in terms of the triple constraints.  That is, which to freeze, to manage, or to float.  You have to figure that out.

We've talked about the fundamental things you can do in such circumstances (Resource leveling, get schedule/scope/budget relief, swap to more productive resources, FastTrack, Crashing, etc.).  Now it's up to you to analyze where you are and come up with a plan to fix the problems. You will be documenting your plan and implementing portions of it by modifying a version of your .MPP file and seeing what happens to your numbers. You will also be submitting that modified project plan (without any overall located resources) for review.

  • You will write an essay on what the possible options are when a project is at odds with its baseline. What are the options available?
  • You will then document how you plan on bringing your project back in-line with your baseline
  • You will explain in detail what your forecast numbers reveal as to your cost and schedule issues before corrective actions are taken.
  • You will explain in detail the changes you plan to make to task durations, resources, budget values, project scope, etc. to bring your project back in line.
  • You will be using a template named "add your name here- Final Project Essays" for your Essay (you will be using the same template for all essays).
  • At least 3 pages or longer in length.

Formatting:

  • Double-space (no additional space between paragraphs)
  • One-inch margins
  • Times Roman12-point font size
  • Left justified

Assignment 3 - Lessons Learned Essay

You have been working on your course project. You have selected what I hope has worked out to be an effective project subject, constructed a detailed project plan, and gone through a whole series of analysis and modifications, including simulating common project concerns and issues.

We have also covered a myriad of topics and ideas in our reading and in our threaded interactions.  We have practiced multiple skills for example creating AIB's, crashing projects at the least cost, calculating pertMean's, calculating, interpreting, and leveraging Earned Value statistics, etc.

It is my hope, that wherever you sit in the range of prior project exposure, from rookie to experienced professional, that this course and these activities have produced moments of insight, and learning. Here is your chance to document your journey from Week-1 to Week-7 in terms of that educational achievement.

The expectation is that you will write your detailed review of your insights and takeaways inclusive of the large list of topics and concepts we've covered from week one all the way through week seven. What concepts, skills, tools, etc. have you learned, and why are they important.  Your essay should include your experience with your seven-part course project.  What would you do again? What is on your list of things never to repeat? What insights and realizations have you reached on the challenges of real world project management (even in our simplified and highly manipulated theoretical environment).

Formatting:

  • Double-space (no additional space between paragraphs)
  • One-inch margins
  • Times Roman12-point font size
  • Left justified

Assignment 4 - Final Version of your Project Plan

You've updated your Microsoft project plan to implement some of the ideas expressed in your essay in your effort to bring your project back to your baseline. Now let's take a look at your final plan product.

What changes you made to the final plan?

  • Did you eliminate all over allocated resources?
  • Maybe you Fast-Tracked some tasks?
  • Maybe you de-scope some deliverables?
  • What does your TCPI look like now?

Attachment:- Assignment Files.rar

Reference no: EM131461142

Questions Cloud

Write professional business letter to company as you search : Your assignment is to search professional organizations' websites and write a professional business letter to a company as you search for employment.
Consequences of policy decision to outlaw alcohol : Describe two specific consequences of this policy decision to outlaw alcohol.
How cultural considerations affect child welfare policy : explain what your responsibilities, as a social worker, might be in supporting the Hernandez family in addressing
Find the purchase price of this perpetuity : Given the effective interest rate is 9% annually, find the purchase price of this perpetuity.
Discuss challenges of earned value analysis in industry : Wrote an essay on the advantages and challenges of Earned Value Analysis in industry
Assess the validity of the spokesmans claims : Harvard University has recently revolutionized its financial aid policies, aimed at easing the financial strain on middle and upper-middle income families.
First part of the nineteenth century : The various reform communities that sprang up throughout America during the first part of the nineteenth century typically understood the meaning of freedom
What weighted average cost of capital : what weighted average cost of capital (WACC) should it use as it evaluates this project?
What do you consider to be biggest challenge : What do you consider to be biggest challenge or largest obstacle that must be overcome? Would this challenge, or obstacle, be same for all international market?

Reviews

len1461142

4/13/2017 5:25:01 AM

These Instructions should explain it all but just to clarify the MSP project is already 95%done it needs to be put back on track as it is over budget and over shceduled. Once the project is back on track it just needs to be written about and how you were able to put it back on track. Thank you. NOTE: As previously mentioned - You can have your essays reviewed and critiqued via our “Smarthinking” tutoring service prior to submission for a grade, and I recommend you do - BOTH for the general writing AND your use of APA formatting. In the course shell, at Course Home select the Tutor Source link, then click on the Smarthinking link embedded in the Smarthinking Virtual Tutorial paragraph. They can really help you out!

len1461142

4/13/2017 5:24:51 AM

PROJ-592 Lessons Learned Essay - Student effectively and thoroughly documents their insights and key takeaways from week-1 – 7 of the course and the seven-part course project. What concepts, skills, tools, etc. have they learned, and why are they important. Final Version of Your Project Plan - Student provides their latest MSP Project Plan file which implement the changes documented in their controlling your project essay, and includes all requested modifications. As always, the quality of writing will be appropriate for a Master’s level University course, with suitable tone and clarity expected of communication to corporate executives, and appropriate references to refereed sources.

len1461142

4/13/2017 5:24:40 AM

Executive Summary – Student will provide an Executive Summary which effectively, clearly, and with appropriate tone, summarizes the project status, the Earned Value statistics, and the plan steps to bring in the project at baseline cost and schedule values. Controlling Your Project Essay - Student documents and explains the potential options available when a project is at odds with its baseline. Student explains, in detail, what the EVA forecast numbers reveal as to their project cost and schedule issues before corrective actions are taken. Student documents, in general, how they plan on bringing the project back in-line with the project baseline. Student documents, in detail, the changes made to task durations, resources, budget values, project scope, etc. to correct project performance.

Write a Review

Other Subject Questions & Answers

  Capacity for language among living apes

What is your stance on the capacity for language among living apes? Would you say they have language? Why or why not?

  Successful with intense interaction among project managers

Successful with intense interaction among project managers

  Determine the three-year total crime rate per institution

What crimes were most commonly committed on Minnesota campuses between 2009 and 2011? Based on the data, would you say the crime rates decreased or increased from 2009 to 2011?

  What is state terrorism

What is state terrorism? What are some examples of state terrorism from the last 50 years?

  Identify the effects of this pollution on human health

Create a 5-to 8-slide PowerPoint presentation or a 350-to 525-word proposal. Identify the effects of this pollution on human health and the environment. Explain the causes of this pollution

  What might diminish positive organizational behaviors

When viewed from such a systems perspective, what might diminish positive/productive organizational behaviors? For example, how might technology negatively affect human behavior?

  Essay on teachers and parents need to allow students to fail

We must review the threat of flunking see it as it really is---a positive teaching tool." do you agree with Sherry's claim that teachers and parents need to allow more students to fail in order for them to succeed

  Companys safety performance and safety program

Difference between using lagging indicators and leading indicators and how each of these aid in measuring a company's safety performance and safety program.

  Develop a fact-finding plan including interviews

Review the organizational model above and list the individuals you would like to interview. Prepare a list of objectives for each of the interviews you will conduct.

  How each growth curve

In each graph in figure 6.5, the culture was incubated at 30 degrees celsuis in glucose minimal salts broth, aerobically. the bacterium is a facultative anaerobe with an optimum temperature of 37 degrees and can metabolize glucose and lactose.

  What you know about swot to come up with a plan

Use the information from your policy planning interviews and what you know about SWOT (use this table for more info-- http://www.umt.edu/it/strategicplan/swot.php ) to come up with a plan using your existing IT infrastructure to make your own plan..

  Describe the activities in a typical day in your job

Describe the activities in a typical day in your job. How many hours do you work in a typical week? Tell me about your background, including education and experience.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd