Discuss about the design team and project logistics

Assignment Help Mechanical Engineering
Reference no: EM131405706

Design Project Description

1 Motivation

Your task, should you choose to accept it (and you will) will be to design, build, and analyze a solar oven.Even in a cold climate such as Flagstaff, the amount of sunlight is more than sufficient for cooking.

2 Design Team and Project Logistics

You will conduct this project in teams of 3-4 students. If you are co-enrolled in ME495, you should use the same project team for both classes. If you are not enrolled in ME495, you may form a group with other non-ME495 students, or you will be placed onto a team of non-ME495 students.

3 Design Requirements

Note that some of these requirements leave some flexibility in how they are interpreted. Feel free to propose ideas you have that might bend the rules to Dr. Nelson,who may or may not allow your idea. You should obtain approval in writing from Dr. Nelson if you are bending a rule.

• The complete heating system must be able to fit within a 27 cubic foot space, with a maximum linear dimension of 5 ft. The weight of the ovenshould allow it to be manually handled (i.e. moved around a house) by only one person without assistance.

• Projects may not be left on campus overnight (this may impose an additional size/weight restriction)

• Design must cost less than $30 (see bill of materials description under project report)

• No electrical or exothermic chemical heating

• No use of any lenses or concentrators (such as satellite dishes or Fresnel lenses) unless you make them yourself

• Must be able to produce a fully-cooked, safely edible, baked good within 50 minutes (see demonstration details) that has a minimum dimension of 1" and has a total volume of at least 30 in3. Note that:

o Automatically acceptable baked goods include brownies, breads and cakes. Additional goods will be considered, but must be approved by Dr. Nelson.

o To be "fully-cooked", no liquid dough/batter may remain and any internal ingredients must be cooked after beginning in an uncooked state.

o Everything that the food touches must be safe for human consumption.

• Your design may utilize moving parts, but you must move them manually (i.e. no electrical actuation)

4 Analysis Requirements

In order to demonstrate and apply your heat transfer knowledge, you will be required to describe and estimate some thermal parameters for your design (see project report requirements below).

5 Timeline of Deliverables

See "Deliverables" section for full information about each deliverable

• 2/21/17: Memo 1 Due in Class

• 3/28/17: Memo 2 Due in Class

• 4/10/17: Final Device Construction Deadline

o Email a picture of your completed project to Dr. Nelson by the end of the day

• 4/18/17: ME450 Project Report Due

• 4/18/17 (if sunny): Project Demonstration Day

6 Demonstration Details

6.1 ME 450 Demonstration Details (4/18/17 - if sunny)

• If not sunny, demo will occur on next sunny lecture day

• Demonstrations will be in the grass bowl to the north of the engineering building

• You may leave your ovens outside in the sun to heat up all day, but the oven must be at the demonstration site by 3:30pm

• 3:30-4:00Design reviews, hang out, prepare baked goods

• 4:00Place baked good in oven

• 4:50-5:15 eat baked goods!

7 Deliverables

7.1 Preliminary Memos. ALL MEMOS MUST INCLUDE YOUR ASSIGNED TEAM #

• Design Project Memo 1. Include the following:

o 2 page maximum

o At least 3different design ideas you considered for your project, including schematics/diagrams. NOTE: you must have 3 DIFFERENT designs - not combinations of each other

o A finalized physical design for your project, including:

Explanation of why you chose your selected design over the other options

Description of your absorber surface

Description of your insulation approach

Identification of materials/items to be used in your design

Listing of where/how you will obtain the materials in your design

• Design Project Memo 2 (Note that you should discuss your memo 2 with Dr. Nelson before submitting the final reports). Include the following:

o A sketch/schematic of your design

o A list of the key heat transfer paths from your absorber to the ambient

o A thermal resistance network for each of the heat transfer paths, identifying what EACH thermal resistor represents (equations not necessary)

o An estimate of the rate at which solar energy is absorbed in your design

7.2 ME450 Project Report

The project report will be due on the originally scheduled demonstration date regardless of weather. If a lack of sunny conditions causes the demonstration to be postponed, the report will still be due!

The project report should be brief and concise, containing the sections described below:

• Cover Sheet: Grade Sheet (see appendix)

• Section 1: Design Description (<2/3 page)

o Describe your design, including a SCHEMATIC, a PHOTOGRAPH, and a description of materials/items used

o Describe why you chose your design

• Section 2: Analysis (onlyas much length as is necessary to clearly communicate your analysis). Note that scanning handwritten resistance networks may be faster/easier than creating digital figures.

o Estimate the rate in Watts at which sunlight is absorbed by your design (assume a solar flux of 1000 W/m2)

o Show a thermal resistance network for each heat transfer path for the heat loss from your design. Calculate/estimate all thermal resistances. For all convection correlations, list the assumed geometry, the equation being used, and the calculated ‘h' value.

o Identify the dominant mode of heat loss, and discuss why this is the case.

o STATE AND JUSTIFY all assumptions and estimates in the analysis. And by "justify" I mean "PROVE to me that your assumption is reasonable"

• Section 3: Reflection (<1/2 page)

o Suggest TWO design modifications that would significantly reduce the heat loss from your design. One modification must be a low-cost modification that would fit within your project budget, and the other modification must be a modification using commercially available materials/technologies that would be realistically used in industry (i.e. without an absurd cost constraint). Note that you will have to perform some independent research on available materials and technologies to complete this.

• Section 4: Bill of Materials

o List ALL materials in the design (automatic 20% grade reduction for any material I find in your design that is unaccounted for in your bill of materials)

o Can treat scavenged items as zero cost only ifanyone could reasonably attain them freely (for donated items you must count the full purchase cost)

o For structural materials, you must use the minimum UNIT COST, not a portion cost (i.e. if you buy an item in its smallest available quantity and only use 10% of the item, you still must include the TOTAL item cost)

o For fastening/assembly/filler materials, you may use portion costs (e.g. glue, nails, screws, etc). If in doubt, ask me.

o You must include the cost of any specialty tools required for your assembly that are not available in the machine shop (even if they are your own)

• Peer Evaluation: your project grade will be scaled by a peer evaluation from your teammates, who will rate your contributions to the group. See the peer evaluation document for additional details. Your project grade will equal (team project grade)*(peer evaluation score).

9 Appendix

This appendix contains four items:

• A cover sheet for your ME450 report, which must be included as the top page

• A peer evaluation form that should be emailed to Dr. Nelson ONLY if you want to give yourself and your teammates something other than 1.0 (if giving your teammates all 1.0, you need not do anything). If you wish to give a teammate a score below 0.9, you can only do so if you have consulted with Dr. Nelson beforehandin attempts to resolve the issue.

• A list of useful tips and radiation Basics

Peer Evaluation

Assign a score for yourself and each group member in ME450 between 0 and 1.05. A score of 1.0 corresponds to fulfilling the required responsibilities for the project. If you are not assigning any scores other than 1.0, you do not need to turn in this form. If you assign a score other than 1.0, you must email the form to Dr. Nelson and justify the score in the comments. If you do not justify your scores (other than 1.0) or give yourself a blatantly dishonest score (i.e. above 1.0 when all teammates rate you below 1.0) I may decrease your own score.

The peer evaluation scores will scale the individual project grades. Your score should consider theindividual's contributions, level of effort, ease of working with, and reliability. In order to give a score lower than 0.9, you must communicate with me beforehand and demonstrate efforts to resolve the problem. You may not give everyone on the team a score above 1.0.

Reference no: EM131405706

Questions Cloud

For a percent increase in risk what is the relative risk : For a relative risk of 1.53, what is the percent increase in risk?- For a percent increase in risk of 140%, what is the relative risk?
What was the company taxable income for the year : Delectable Parsnip, Inc.'s, net income for the most recent year was $10,112. The tax rate was 34 percent. The firm paid $3,687 in total interest expense and deducted $5,473 in depreciation expense. What was the company's taxable income for the ye..
What is relative risk of death for the two groups : Of those who said no to both, about 1 in 5 died within 6 months after their operation. What is the relative risk of death (within 6 months) for the two groups? Write your answer in a sentence or two that would be understood by someone with no trai..
What is the future equivalent : What is the future equivalent of $1000 invested at 8% simple interest per year for 2.5 years?
Discuss about the design team and project logistics : ME 450 : You will conduct this project in teams of 3-4 students. If you are co-enrolled in ME495, you should use the same project team for both classes. If you are not enrolled in ME495, you may form a group with other non-ME495 students, or you..
Effect of merger on market concentration ratio : a. What would be the effect of the merger on the market's concentration ratio? On the HHI?
What additional information needed to make determination : Is this enough information to determine whether male smokers or female smokers are more likely to contract the disease? If so, make that determination. If not, explain what additional information would be needed to make that determination.
Conduct an analysis of macro-environmental forces : BSBMKG506 and BSBMKG507 Assessment. Conduct an analysis of macro-environmental forces using the PESTEL model. From your analysis, outline the opportunities and threats in this market. (Hint: You need to outline changes in PESTEL forces that may im..
Medicare access and chip reauthorization act : The Medicare Access and CHIP Reauthorization Act (MACRA) of 2015, is another layer of federal legislation enacted to govern clinician payment process. MACRA is intended to promote value, outcomes and quality. Review the provided resources as it r..

Reviews

Write a Review

Mechanical Engineering Questions & Answers

  Package design

Package Design Brief: Assume you are the packaging engineer for a large consumer products company. In this company, the Packaging Design Briefs are initiated by the marketing group and forwarded to the Package Engineering group.

  Mechanical engineering questions

Define dynamic viscosity, Determine the centroid, Pressure due to the height of liquid, Advantage of changing the liquid, Calculate the total moment about the hinge of the seal gate.

  Automatic control

DOF system and Find the differential equation describing the system

  Write a paper on boyle''s law

Write a paper on Boyle's law and describe Compression and Combustion stroke . Also explain Charles's law and illustrate SI engine and CI engine.

  Verify the law for parallelogram of forces

To Verify the law for parallelogram of forces, law for triangle of forces and law of polygon of forces. These laws are very useful to calculate unknown forces in very short time.

  Discharge pressure of the compressor

What is the discharge revised discharge pressure of the compressor.

  The Case for Global Accounting Standards

The role of IFRS in both developing and developed capital markets.

  Wind turbine

Wind turbines are becoming more and more common as a method of energy production, wind turbines by their very nature are dynamic and are subject to and create their own internal and external kinematics and kinetics.

  Advanced design methodologies

8 x product engineering and design review (week 2 – 12), ~3 pages per item which must contain a brief description of the product then delve into concepts such as materials selection, manufacturing methods, life cycle analysis, recyclability and overa..

  Design of absorption column and the cooler

Design of absorption column and the cooler. Process design of other units should be completed along with pipe sizes.

  Determine the maximum total bending moment

Determine maximum total bending moment (static plus dynamic) of the beam under steady-state conditions.

  Force of the water on the gate

Determine the magnitude of the horizontal and vertical components of the force of the water on the gate.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd