Reference no: EM133921505
Enterprise Resource Planning
ERP Group Project
Topic - Developing an Integrated ERP System for Sunny Queen Egg Company
This is a team-based assignment with five members per team. Teams are required to develop an ERP system for a real life organisations using real data. The company you chose could be based located in overseas. You are required to consider at least 5 functional units of that the selected company to develop the ERP system. You must develop a working ERP package using programme/software of your choice. Get expert-level assignment help in any subject.
You can use Matlab, Microsoft Access, Microsoft Excel, Java or any other platform you feel comfortable with. However, microsoft access is considered most suitable for this project. If, for any unavoidable reason, you are unable to get data from real industry, you can collect data from other sources like internet, case studies, journal papers, theses, books etc. in some cases, you may need to make expert assumptions.
Below are some suggested organisation for you to consider.
a) Library (e.g. QUT library)
b) A Charity organization ( e.g. Church, Mosques)
c) A meat factory
d) A food processing factory
e) Manufacturer of agricultural dryers
f) Dairy Industry
g) Manufacturer of an electrical transformers
h) Apparel manufacturing company
i) Egg industry
j) An Energy consulting firm
k) A primary school
l) Or any other case industry of your choice.
In order to give you more specific idea about this group project, the list of the projects student completed last year is shown below.
1. Enterprise Resource Planning for Massam Noodle Ltd
2. ERP for a BICYCLE ASSEMBLY
3. Implementation of an ERP System for a construction company "Green Valley"
4. Implementing an ERP solution in retail - Aldi Australia
5. ERP for manufacturing and sales of a mattress company
6. Development of enterprise resource management for Australian dairy industry-Dairy Australia Ltd case study
7. Improvement of an Existing ERP System of a Meat Producing Company -JBS Australia Pty limited
8. Developing an ERP system for Sunny Queen Egg Company
9. ERP system for manufacture of electrical transformer
10. Enterprise Resource Planning Goodyear Tire Manufacturing
11. Enterprise Resource Planning System for a Fertilizer manufacturing company
12. ERP System for McGrath Foundation
13. ERP System for a Manufacturer of Electrical Transformers
14. Enterprise Resource Planning Software Development for Girnar Dairy
15. Enterprise resource management of Sofa Manufacturer
Final Report Format
Suggested format of the final report is:
1. Cover page with names and student numbers of team members
2. Summary of the report (maximum one page)
3. Documentation of the business process using block diagrams, figures, photos and texts
4. Identification of the functional units for this study with proper justification.
5. Framework of the proposed ERP system.
6. Collection of documents, data, and information
7. Development of the software package.
8. Demonstration of the ERP package developed
9. Analysis of results for managerial decisions.
10. Discussions and conclusions (including limitations and scope for future work related to this study).
11. References
12. Appendix (copy of data used for problem definition)
• Report size (as a general guide line around 4000 words limit, Font size 12, single space)