Develop a risk management plan for a reliable power

Assignment Help Risk Management
Reference no: EM131037672

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009.

Please ensure that you:

• Establish the context clearly, in accordance with the Standard;
• Define your system boundaries carefully;
• Show evidence of consideration of alternatives for risk management1;
• Clearly state the risk tolerability criteria employed;
• Include relevant literature review and discussion; and
• Consider aspects beyond the texts and lecture material (ie value added discussion).

The problem of investigate can be a past or current one. You may need to simplify and define the boundaries carefully in order to achieve the word limit. Relevant project information to prepare the risk management plan needs to be identified by the student (literature research). You must choose one project from the following list:

Project 1- Implementation of electric vehicles within Australia under the aspect of functional safety

Project 2- The Wheatstone Project in Western Australia - one of Australia's largest resource projects. Develop a risk management plan for the implementation of the upstream - offshore infrastructure.

Project 3- Introduction of enforced traffic regulations: lowering the speed limit tolerance and increasing fines. Develop a risk management plan considering the impact on road safety.

Project 4- Decentralised control of power stations. Develop a risk management plan for a reliable power control system.

Project 5- Risk management plan for the construction of the Azerbaijan Tower.

Project 6- The construction of wave power plants or wave power offshore farms (for example the Langlee wave power plant in New Zealand);

Project 7- Development and operation of a nuclear power plant (with regards to the catastrophe in Fukushima);

Project 8- Space missions - a manned mission to Mars.

Identify a problem that occurred or may occur during the life of your chosen project and prepare the risk management plan.

Reference no: EM131037672

Questions Cloud

Case - brunninghausen v glavanics : The written assignment and presentation slides must be in the IRAC method. This is the case: Brunninghausen v Glavanics (1999)
Briefly provide a historical background on scheins theorys : Briefly provide a historical background on Schein's theory's and describe an organization you were or are a part of in terms of these 4 factors: myths/symbols/ritual/language.
The rail infrastructure and food transportation : What are the main advantages of each of the transportation means in each city? And Which transportation means do you think is the most efficient in terms of cost and time taken for travel and do you think anyone mode could eliminate the other?
How can organizational change managed to prevent its failure : How can organizational change be managed to prevent its failure? Response the problem first. Then answer why, mainly the homework should be answering why.
Develop a risk management plan for a reliable power : 49006 RISK MANAGEMENT IN ENGINEERING, Assessment Task 1 - Autumn 2016. Introduction of enforced traffic regulations: lowering the speed limit tolerance and increasing fines. Develop a risk management plan considering the impact on road safety. Dece..
Benefit of monopolistic competition : One of the benefit of monopolistic competition over perfect competition is
Consider the cd-cg amplifier : 8.100 Consider the CD-CG amplifier of Fig. 8.48(c) for the case gm= 5 mA/V, Rsig= 500 kΩ , and RL = 10 kΩ Neglecting ro, find Gv .
The signing of the affordable care act : Please view the video Sickness Across America. After viewing the video, please state your reaction to the video. This video was made PRIOR to a lot of changes in our healthcare system. What aspects of this video have changed since the signing of the ..
Understand the concept of sql : List  all the student Id and teacher Id where GPA is 3 or more than 3. List all the students of the teacher whose name is 'John Eric'. List student Id, name, and address of all the students whose date of birth is 1983. List all the Course Code  where..

Reviews

Write a Review

Risk Management Questions & Answers

  Calculate the level of inventory and receivables

Hypothetical Manufacturing Ltd provides you with the following details: Current assets of $12m. Current liabilities of $6m. Calculate the level of inventory and receivables.

  Explain how the credit portfolio study would facilitate

Explain how the credit portfolio study would facilitate or assist the liquidity management of the financial institution or bank.

  What is the implied breadth of the strategy

What information ratio would you expect to find from applying this model to industries only? If the full application exhibits an information coefficient of 0.05, what is the implied breadth of the strategy?

  What are the usual types of collateral securities

What are the usual types of collateral securities? Explain different methods of taking securities. What is structural subordination risk? Is credit evaluation of a corporate guarantor required? Please elaborate.

  Determine control measures to treat risks for all the risks

Determine control measures to treat risks for all the risks you identified and evaluated in Assessment 1. You may include: Prepare a treatment plan for implementing your recommended control measures. Some of the control measures you recommended are p..

  Explain how implied repo rate on a spread transaction differ

Explain how the implied repo rate on a spread transaction differs from that on a nearby futures contract. A major bread maker is planning to purchase wheat in the near future.

  You are about to take over moneyplays bank a small but

you are about to take over moneyplays bank a small but lucrative financial institution. you have hired new staff and

  How would you assess the financial viability of the project

How would you assess the financial viability of the project? Explain the relevance of DSCR, LLCR and PLCR in credit appraisal of a project.

  Similarities and differences between threat and risk

Assess the similarities and differences between threat, risk, hazard, and peril? Assess how threat, risk, hazard, and peril impact your organization

  Provide a qualitative description of intels transaction risk

Provide a qualitative description of Intel's transaction exchange risk. If Intel chooses not to hedge its transaction exchange risk, what is Intel's expected dollar revenue?

  Conduct an ergonomic assessment on an office workstation

conduct an ergonomic assessment on an office workstation either at uni your home workplace etc. conduct your assessment

  What is the correct name for each of these losses

Peter Bubba is driving home from a bar when he runs off the road and hits a telephone pole.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd