Develop a comprehensive alternative plan

Assignment Help Mechanical Engineering
Reference no: EM131065195

MURPHY MANUFACTURING

When Joe Vollbrach, vice president of operations for Murphy Manufacturing, was given the CEO's directive to investigate the lean production concepts and to implement them if appropriate, he was slightly apprehensive. Everyone knew, he thought, that MRP was the best way to run a manufacturing operation, and they had been pretty successful with their MRP system. Once he read a couple of books and a magazine article or two about JIT and lean production, however, he thought maybe there was something to it and it sure seemed simple enough. Dozens of companies had reported great reductions in inventory cost and other forms of waste, and with Murphy Manufacturing having only five to six inventory turns per year, the prospect of significant inventory reductions was very appealing.

Encouraged with the success stories and very mindful of the CEO directive, Joe wasted no time. He put out the directive to all his people to implement lean production the way it was working in the book examples he had read. A few months later, however, he was beginning to wonder about the truth of the success stories in those books. The following are some of the examples of the complaints he was getting and the problems he was facing.

KAREN, THE PURCHASING MANAGER: "Joe, this JIT and lean production are a disaster for us. It's not only costing us a lot more money, but the suppliers are getting real angry with us. Since our raw material inventory had typically been high, you said we should order smaller quantities and have it delivered just in time for its need. Sure, that cut down on the raw material inventory, but that cost saving has been more than made up for with all the increased cost. First, purchase orders are not cost free, and we're making a lot more of them. That's also taking up a lot more of our buyer's time. Then there's the transportation cost. Since most of the trucking companies charge a lot more for less-than-full truckloads, our costs are going sky-high with more frequent deliveries of smaller loads. Combine that with expediting costs, and it gets really bad. Our schedules are changing even more frequently, and without the raw material the production people are often asking for next-day delivery of material they need for a schedule change. We're flying more parts in, and you know how much that costs!
That's not all. Our suppliers are really wondering if we know how to run our business. We're changing that schedule to them much more frequently, and the only way they can hope to meet our needs is to keep a lot of our inventory in their finished goods. That's costing them a lot of money in inventory holding costs as well as administrative costs to manage the inventory and to process all our requests. They not only have more requests from us, but it seems like everything is a rush order. They're pressing us hard for price increases to cover their increased cost to keep us as a customer. I've held most of them off for a while but not much longer. Unfortunately, I agree with them, so it's hard for me to make any kind of logical argument to counter their requests for price increases."

OSCAR, SUPERVISOR OF SHIPPING/RECEIVING: "If you're going to keep this up I have to ask for two more truck bays and about four more receiving clerks. There's a lot more trucks making a lot more deliveries. We can't schedule perfectly when a truck will show up, so many times during the day there are several trucks waiting for an open truck bay. Production people are screaming at us because they see a certain truck and they know a

critical part is on it, but we have to wait because the trucks currently in the bays being unloaded also have critical parts. It seems like everything is critical these days. A couple more bays with enough people to staff them will help, although it's not the only answer. I figure about a $3 million renovation to the receiving area and an increase in our budget of about $500,000 ought to be about enough to keep us afloat, at least most of the time. Oh, I forgot-better make that $600,000 more. I also need another records clerk to keep up with the big increase in paperwork from all those deliveries."
Joe was just finished taking a couple of aspirin to deal with that headache, when Marsha, a production supervisor caught up with him:

"Joe, I don't know where you came up with these silly ideas, but you're killing us here. This so-called ‘Kanban' system is just plain stupid. It reminds me of the reorder points we used before the MRP system, and we all know how much better MRP made things work. I feel like I just slipped 35 years back in time. We all know our customers are a fickle bunch who are always changing their minds on orders. We used to have visibility with the change when we used MRP, but now all we have is what the final assembly area is working on. That not only causes us big, inefficient downtimes for setup changes but also doesn't give us much time to get the materials we need to make the different parts. When we do figure out what we need, most of the time our suppliers don't have any in raw material stock. Now we have to waste more time and energy to scream at the buyers. What makes it even worse is your directive to eliminate finished goods. We not only don't have material to make what we need half the time, but we're not allowed to make what we can. It would seem that would make sense, so that when a customer does request a certain model we have in stock, at least that order wouldn't end up being a crisis.
The crisis scenario I just described is what happens when everything else works. When we have some other problems, such as a piece of equipment going down, the real disaster hits. What little order we can force goes out the window and everyone starts really getting uptight. And don't talk about ‘preventive maintenance,' either. We need every piece of equipment running as much as we can to even come close to making the orders we need."
By the way, some of our best people are threatening to quit. Some are being paid on a piece rate, and the lack of material combined with the directive to avoid finished goods has cut seriously into their paychecks. Even the ones on straight hourly pay are unhappy. All we supervisors are being evaluated on labor productivity and efficiency, and our numbers are looking real bad. Naturally, we put the heat on the workers to do better, but I'm not too sure they can do much about it most of the time.
And another thing while I have your attention-in some of our models we have a lot of engineering design changes The MRP system used to give us some warning, but now we have none. Suddenly one of the engineers will show up and tell us to use a different part. When we check with purchasing, often they've only just gotten the notification themselves and have only just started to work with the suppliers for the part. Not only do we have to obsolete all the old parts, but also we have to wait for the new ones. The salespeople are even starting to scream at us.
While I'm on a roll here, you've got to do something with those quality control people. We could deal with some scrap or rejected parts when we had plenty of inventory, but now we need every part in the place. Tell them to quit rejecting parts and let us use them. At least we'll have a better chance of shipping the order, even if it isn't perfect.
Almost as soon as Marsha left, Valorie (the sales manager) came in. Joe braced himself for more of a headache even before she spoke. The expression on her face foreshadowed what she had on her mind:
"Joe, my job is to make sales and keep the customers happy. The sales have been going fine, but our delivery stinks. Our on-time delivery record has fallen from 95% to less than 50% in the past six months. Some of our customers are threatening to leave us, and some are pushing for price cuts. According to them, our delivery record is so poor they feel compelled to keep more of our inventory in their raw material stores to account for their lack of faith in our delivery promises. They say that since it's our fault they have increased raw material inventory costs, we should compensate them with a price cut. It's pretty hard to argue with their logic. I'm sure we would do the same with our suppliers if they treated us the way we've been treating our customers lately.

We all know our customers have to sometimes change orders to reflect what their own customers want. Now, however, the changes are becoming more frequent and radical. It seems since we are so poor in delivery they order more in advance from us to buffer the time for our late deliveries. Ordering further into the future gives them a lot less certainty of what they really need, so naturally they have to change once they do know. I may have to get another order-entry clerk to deal with all the changes, and if I do you better believe I'll let everyone know the extra expense is your fault!
The bottom line here is simple, Joe. You've got to get after your people to improve the delivery drastically or we may be in big trouble, and soon."

After Valorie left Joe's secretary came in with a rush memo from the CEO:

"I just got the preliminary financial report for the last quarter, and for the first time in over five years we show a loss-and it's a big one. That details show sales goals have basically been met. The loss comes from a very large increase in expenses in virtually every area in operations except a modest decrease in inventory cost. I'm calling an emergency staff meeting for two o'clock today. Please be ready to explain the situation completely."

As Joe shut his door to insulate himself from the complaints and to prepare for the meeting, he began to wonder if some of the people who claimed that JIT and lean production were a culturally based system impossible to implement outside of Japan were correct. He knew most of the problems were related to his attempt to implement the new system. What, he wondered, went wrong, and what should he do about it? These were certainly two critical questions that would be major parts of the two o'clock meeting, and he needed good and complete answers. The CEO was reasonable and could deal with the fact that mistakes might have been made, but she would expect a detailed analysis and complete action plan to get things back on track. The aspirin was definitely wearing off, and it was less than an hour ago that he took them!

Assignment

Prepare a complete and comprehensive report for Joe to use for his two o'clock meeting. This should include both the analysis of what went wrong and why, as well as a comprehensive and time-phased plan to implement lean production the correct way. If you do not think lean production is appropriate, explain why in detail and develop a comprehensive alternative plan.

Reference no: EM131065195

Questions Cloud

Determine how much the semiannual payment should be : You are chairperson of the investment fund for the Continental Soccer League. You are asked to set up a fund of semiannual payments to be compounded semiannually to accumulate a sum of $310,000 after ten years at a 14 percent annual rate (20 payments..
What required rate of return is implied by the current : Losh Key Corporation common stock is selling for $25.00 per share with an expect cash dividend next year of $1.00. Short term prospects are excellent for Losh Key: a 25% annual growth rate in dividend payments is expected for the three years followin..
Size of firm has no effect on tendency to pay dividends : Generally speaking, the size of a firm has no effect on its tendency to pay dividends. The market crash and the accounting scandals in the early 2000s tended to cause financially stable firms to cease paying cash dividends. The majority of firms eith..
Distinction between substitution and income effects : A friend says that the tax "generates no excess burden because it does not lead to changes in behaviour." Is this statement true or false? Explain using a simple labour-leisure choice model, and do not forget to make the distinction between substi..
Develop a comprehensive alternative plan : Prepare a complete and comprehensive report for Joe to use for his two o'clock meeting. This should include both the analysis of what went wrong and why, as well as a comprehensive and time-phased plan to implement lean production the correct way...
Compute the price of a derivative whose payoff : The current spot price of a stock is $21, the expected rate of return of the stock is 11%, and the volatility is 12%. The risk-free rate is 5%. Compute the price of a derivative whose payoff in 5 months is ln(S5/12) + 32, where S5/12 is the stock pri..
Studied-learned about u.s. history over the course : For this discussion, I'd like everyone to reflect upon what you have studied/learned about U.S. history over the course of this semester, and discuss this with your fellow students in response to the following statement.
Describe a process you could use to get simple random sample : Is your sample a simple random sample? Explain. Describe a process you could use to get a simple random sample of size 20 from a class of size 40
Firm is expected to have net capital expenditures : Randall and Arts Inc. has an expected net operating profit after taxes, EBIT(1-T), of $3,200 million in the coming year. In addition, the firm is expected to have net capital expenditures of $480 million, and net operating working capital (NOWC) is e..

Reviews

Write a Review

Mechanical Engineering Questions & Answers

  Determine the isentropic efficiency for this process

A piston cylinder holds air at 80 F and 15 psi. During an adiabatic process the pressure is increased to 165 psi and the entropy generated is 0.15 BTU/lb-R. Determine the isentropic efficiency for this process.

  The dry air mass flow rate and water vapor mass flow rate

At a certain location in a duct, moist air at 35 C, 125 kPa and a relative humidity of 50% flows at a volume flow rate of 50 m^3/s. using tabular data, determine the following: i)the humidity ratio ii)the dry air mass flow rate (kg/s) iii) the water ..

  A steel plant heat treats steel rods by passing them

a steel plant heat treats steel rods by passing them through a 1000 degrees c oven. the steel rods are 3 meters in

  Dtermine the moles of co that are produced at the surface

a 20-cm-long cylindrical graphite pure carbon rod is inserted into an oxidizing atmosphere at 1145 k and 1.013105 pa

  In gantry crane there are are two motors one for horizontal

in gantry crane there are are two motors one for horizontal motion i.e. 400kg weight is to be moved 6m with

  Determine the velocity of the water at the inlet and exit

A pump is employed to deliver liquid water from a pond to a higher elevation. The pump steadily draws water from the pond at a volumetric flow rate of 192 gal/min through a pipe having a 7 in diameter inlet. The exit diameter of the pipe is 2 in. and..

  Knowing that e 32 gpa that the maximum allowable normal

a nylon thread is to be subjected to a 10-n tension. knowing that e 3.2 gpa that the maximum allowable normal stress

  A vehicle starts from rest then moves rectilinear with a

a vehicle starts from rest then moves rectilinear with a velocity of v 2t2 for 5 s until it reaches a velocity of 50

  The combustion is complete and 90 excess air is used the

the waste gas from a process of 1000 gmolhr of co at 473 degrees kelvin is burned at 1atm pressure in a furnace using

  At the entrance of the air conditioning system determine

atmospheric air at 98 kpa and 30degc flows into an air conditioning system with a volume flow rate of 2 m3min. to

  An air-standard dual cycle has a compression ratio of 18

an air-standard dual cycle has a compression ratio of 18 and a cutoff ratio of 1.1. the pressure ratio during

  The belt connecting these pulleys is represented by two

a pulley 250 mm in diameter drives a second pulley 1000 mm in diameter by means of a belt. the moment of inertia of the

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd