Reference no: EM131258273
A certain job shop specializes in one-of-a-kind orders defiling with parts of medium to high complexity. A typical part is processed through ten machines in batch sizes of one. The shop contains eight conventional machine tools and operates35 hr/1lk ot production time Average time values on the part are: machining time per machine > 0.5 hr, work handling time per machine = 0.3 hr, tool change time per machine = 0.2 hr, setup time per machine = 6 hr, and nonoperation time per machine = 12 hr.A new programmable machine has been purchased by the shop which is capable of performing all ten operations in a single setup. The programming of the machine for this part will require 20 hr; however, the programming can be done off-line, without tying up the machine. The setup time will be 10 hr. The total machining time will be reduced to 80% of its previous value due to advanced tool control algorithms: the work handling time will be the same as for one machine: and the total tool change time will be reduced by 50% because it will be accomplished automatically under program control. Fur the one machine, nonoperation time is expected to be 12 hr.
(a) Determine the manufacturing lead time for the traditional method and for the new method.
(b) Compute the plant capacity for the following alternatives:
(i) e job shop containing the eight traditional machines, and
(ii) a job shop containing IWI) of the new programmable machines. Assume the typical jobs are represented by the data given above.
(c) Determine the average level of work-in-process for the two alternatives in part (b). if the alternative shops operate at full capacity.
(d) Idenhfy which of the ten automation strategies (Sect 1.5,2) arc represented {or probably represented] by the new machine.
Determine the feed rate and time to complete the cut
: The end milling cutter has two teeth and its diameter = 15.0 mm. Determine the feed rate and time to complete the cut
|
List some of best practices for active directory replication
: Describe and detail three tools that can aid in the replication process. List and describe some of the best practices for Active Directory Replication.
|
Describe virtual and augmented reality
: Describe virtual and augmented reality. Suggest a way in which this technology could be used in the future; either to improve a current process / procedure or create a new process / procedure. Provide an example of your suggested use of the techno..
|
An aging list of accounts receivables
: An aging list of accounts receivables not only shows you how long it is taking to collect account receivables but also: the amount of working capital at hand.
|
Determine the manufacturing lead time
: Determine the average level of work-in-process for the two alternatives in part (b). if the alternative shops operate at full capacity.
|
Examples of conflict situations
: Share an examples of conflict situations that you have witnessed in the workplace. Please use positions and titles rather than names of specific individuals. What kind of conflicts are these examples, and how did the conflicts develop? What were t..
|
Question regarding the opportunity presents itself
: A brief sales pitch will ensure that you are prepared to discuss your career goals whenever the opportunity presents itself. Review the following two Forbes' articles:
|
Divisional cost of capital
: (Divisional cost of capital) LPT Inc, is an integrated oil company headquartered in Dallas, Texas. The company has 3 operating divisions: oil exploration and production (commonly referred to as E&P), pipelines, and refining. The pipeline division man..
|
Determine the value of q that minimizes unit cost uc
: Determine the value of Q that maxim, zes the annual profit earned by the lantana compute arc annual profit earned by the plant at this quantity.
|