Design and build 250 new homes

Assignment Help Other Subject
Reference no: EM131238697

Scenario

As part of an affordable housing initiative, the main contractor agreed with the client to design and build 250 new homes under an amended JCT contract.

The main contractor subcontracted to a specialist subcontractor the design supply and installation of a low cost communal heating and hot water system for the new homes using innovative heat pumps. After the majority of the houses had been built, it became clear that the heating system was inadequate. The main and subcontractor each blames the other for this. After long discussions they have however agreed that the crucial issue to be resolved is whether the deficiency results from the design of the system itself or the water pressure supplying the system from a private bore hole. The bore hole and pumping station supplying the new homes was designed and constructed by another subcontractor, and is therefore (as between the main and subcontractor) the main contractor's responsibility.

The subcontractor has engaged an expert to look into this issue and his advice is that on balance the subcontractor's arguments should succeed but that the answer is not clear-cut.

There are a number of other minor disputes between the main contractor and the subcontractor but this is by far the most significant as the total costs of remedial works and other losses caused by the heating and hot water problems are likely to total at least £1.5 million. The subcontractor has a substantial turnover and is in good shape financially. It has however had substantial sums withheld and is also owed retention. In addition, it carries P.I. cover of only £1M and as it is hoping to float on the stock market soon, a definite answer to the problem is needed within the next three months.

Relations between the management of the main and subcontractor have been poor to date but the subcontractor has just appointed a new managing director from outside the company who is keen to sort things out.

The subcontract is on the main contractor's standard terms. These provide for High Court litigation in the event of a dispute. They also require the subcontractor to meet both sides' costs of any adjudication and to "provide a Bond (to the full value of any adjudicator's award against the Contractor) in an acceptable format to the Contractor, prior to any monies being paid over by the Contractor to the Subcontractor on any adjudicator's award." The subcontractor has notified its PI insurers of the claim. Given the size of the claim they have agreed to let the subcontractor take the lead in trying to agree on an appropriate form of dispute resolution to resolve this dispute quickly.

Martin Green the managing director of the sub-contractor has called a Board meeting to discuss the best means of dispute resolution to adopt for the resolution of this dispute. You and all your fellow students on the MSc in Construction Law & Dispute Resolution are also on the Board of Directors. He requires you all to engage in written dialogue on the 'Discussions' board of this MyBeckett site to explore the best way ahead. Go now to the 'discussions' board and between now and 7th October you are required to submit your own opinions on the above situation, read any other contributions that have been posted and comment on at least two of those other contributions. The MD is keen to see some lively debate as he is very concerned that collectively we come to the right decision.

RESOLUTION OF DISPUTES IN CONTRACT

If they cannot agree otherwise, the parties have two courses of action to achieve a final settlement of their contractual disputes:
- litigation through the courts; and
- arbitration using a skilled arbitrator
-
o usually an expert in the matters under dispute
o he may also have some legal qualification, but not necessarily.
If the contract does not include alternative terms for settlement of disputes, then the courts are the most likely method of settlement and a solicitor's preferred option.

The TCC

If the dispute is technical, even if points of law are involved, the High Court may refer the case to the Technology and Construction Court. The judge may not be an expert, but is more adaptable to commercial procedures, and is experienced in 'commodity' disputes such as building disputes.

Resolving the Dispute
The parties do not have to go to court to resolve their differences. It is always best to resolve differences before they develop into disputes. The means adopted should enjoy the confidence of the parties as a method likely to arrive at a just answer. The best way is for the parties themselves to reach a mutually acceptable solution. This is likely to be quicker, cheaper, easier, and involve no third party, and future business relations can be maintained.

Some people view conflict as being an essential and inevitable part of commercial life in the Western hemisphere, being part of dynamic capitalism. There is nothing wrong with this as long as it is recognised for what it is and properly managed using risk management or conflict management techniques. At the simplest level conflict could simply be a difference of opinion over the sharing of ideas - a healthy contribution to a commercial problem. It is how that conflict is managed or how the risks associated with it are managed that is important. Most conflict can be resolved in a civilised manner through informal discussion and negotiation.

Once conflict has been allowed to develop into a strong difference and the parties have begun to entrench themselves in their positions we have the beginnings of a dispute in embryo form. The parties then have three options:

- Swallow hard and accept they have been wronged but do nothing;
- Resolve the situation now;
- Continue to argue and see the dispute harden and escalate.

Alternatives to the Courts for resolving disputes, in increasing order of formality and enforceability include (amongst other methods and hybrid methods):

- Negotiation;
- Conciliation;
- Mediation;
- Expert Determination;
- Mini Trial;
- Adjudication;
- Arbitration.

Pre-Requisites to Arbitration or Litigation

Parties are now expected by the Pre-Action Protocol for Construction & Engineering disputes to attempt some form of ADR before resorting to litigation. Failure to do so may mean that even if you are successful in litigation you may not recover all (or even any) of your costs!

Pre-requisites for success in ADR:
- A genuine desire for a fair outcome (not a victory) because honouring the outcome often depends on good will;
- Must honestly desire a settlement without extra costs - court etc.;
- Must want a quicker settlement than through courts or arbitration;
- Must realise that the dispute could still go to court or arbitration;
- Must realise that assembly of particulars by an expert may in itself induce a settlement (cf. court cases being resolved before the hearing);
- Must be prepared to disclose to the tribunal all pertinent facts (the tribunal guarantees confidence);
- Must be prepared to deal personally with the tribunal as in certain circumstances no legal representatives are allowed (though technical representatives may be allowed with the consent of the other party and the tribunal);
- Understand that the conciliator/mediator cannot later act as an advocate, adjudicator or arbitrator;
- Understand that either party can withdraw from mediation, conciliation, mini trial, expert determination etc at any time.

Attachment:- Previouse posts.pdf

Verified Expert

The attached solution is prepared in MS word. the solution is 1500 essay about Alternative Dispute Resolution for breach of contract. the solution discusses various options for the company and the main contractor and ends by providing a conclusion of the righ alternative. The solution has a cover page, the main body and reference page.

Reference no: EM131238697

Questions Cloud

Explore the three d shapes of two utility functions : Empirical: In this question you will explore the 3D shapes of two utility functions. The end result of this exercise should be (1) two plots of the 3D shape of the utility functions and (2) two plots of the indi?erence curves for the same utility fun..
Locate ortho-meta para positions on a benzene ring : Can you locate ortho, meta para positions on a benzene ring
Calculate the node voltages va : Calculate the node voltages Va, Vb, and Vc from the given source voltages. - Use the above node voltages to calculate the assigned currents in the circuit.
Explain the challenges facing managers : Explain the challenges facing managers in managing generational differences and negative behaviour in the workplace and Discuss how understanding and managing ‘Communities of Practice' can contribute strategic value in organisations.
Design and build 250 new homes : As part of an affordable housing initiative, the main contractor agreed with the client to design and build 250 new homes under an amended JCT contract - Parties are now expected by the Pre-Action Protocol for Construction & Engineering disputes t..
What type of decision-making is this an example of : Lucas wants to buy a new car. Before he makes a final purchase, he decides to do a full web-based information search. He also talks with his family and friends to gain even more knowledge. What type of decision-making is this an example of?
Identify the early iterations of the hipaa act : Did the student identify early iterations of the HIPAA act and how the law has been modified to facilitate easier access to consumer complaints and enforcement?
Future of social media-and social media marketing : How do you view the future of social media-and social media marketing? Write a description citing three or four trends or developments you think may evolve ove the next decade?
Balance of local standardized products globally : In this assignment, you will analyze the balance of local standardized products globally. In your essay, include the following:

Reviews

len1238697

10/10/2016 8:58:58 AM

I am starting a new course, as detailed in the subject matter, do you have any professional person who can assist. I need 2 reply's to 2 of the turnitin attached I need a reply to the scenario 1 question at the very end. Reading Resolution of dispute All the work are subject to Plagiarism tests, the university is Leeds Becketts

Write a Review

Other Subject Questions & Answers

  What place do honor and respect have in a leadership role

How do you keep your team focused? How do you effectively communicate the big picture and bring that vision to your team? How do you exhibit integrity, perseverance, and courage in your role as a leader?

  What is the net cost of ATP for these reactions

50 molecules of glucose are transformed to pyruvate via glycolysis. 60% of the pyruvate is converted back into glucose via gluconeogenesis. What is the net cost of ATP for these reactions? Be specific and show all work and all the cycles involved.

  Reality meets the theoretical

Reality Meets the Theoretical

  Are all laws ethical

Are all laws ethical? Discuss.Support your answer with appropriate examples.

  What are the basic differences between a negotiation that

what are the basic differences between a negotiation that has an international component and one that does not? if you

  A distribution has a standard deviation

A distribution has a standard deviation of o=10 find the z score for above the mean by 5 points?

  Write a enquiry plan and prepare report of enquiry activity

Write a Enquiry Plan - What is your enquiry question about and why is it important to study this specific issue/debate/problem?

  Write one-page essay about childhood obesity

Write one-page essay about Childhood obesity. Write about why is it dangerous, how parents can control their children weight, and include some statistics about childhood obesity in the U.S

  Descartes reintroduces the senses and sense-based knowledge

In Meditation VI, Descartes reintroduces the senses and sense-based knowledge that he has previously excluded. According to him, what role do the senses and knowledge derived from the senses play for human being. Wherein lies their usefulness?

  Role of group and social functions it supports or promotes

Explaining the role of the group and the social functions it supports or promotes. Define the groups that you select in terms of primary and secondary classifications. If group is deemed a reference group, consider how this group affects or has affec..

  Cryptography within the information systems security realm

This problem pertains to Cryptography within the Information Systems Security realm. I am having issues finding a resolution to this problem. I have tried many different ways to compute but none are correct.

  Constitution and business

What is your opinion does Constitutional Amendment IV constitute a right to privacy? "Amendment IV The right of the people to be secure in their persons, houses, papers, and effects, against unreasonable searches and seizures.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd